| 1 | Leak Rectification Works in DI Pipe |
| 2 | 100.49.1.3:Rectification of joint leakages in 200mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete. |
| 3 | 100.49.1.6:Rectification of joint leakages in 350mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete. |
| 4 | 100.49.1.7:Rectification of joint leakages in 400mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete. |
| 5 | Supply of Control Valves,Air Valves & Repairing works |
| 6 | 100.98.435:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Kinetic Air Valve Type DK, Size 50mm. |
| 7 | 100.98.439:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 15mm. |
| 8 | 100.98.442:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Large Orifice Type S2, Size 20mm. |
| 9 | 100.98.440:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25mm. |
| 10 | 100.98.441:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 40mm. |
| 11 | OD275636/2025-2026:Repairing the leak of valve by removing the damaged hempand providing new hemp , including operating the valve and all labour charges including cost of materials etc complete as per the direction of departmental officers : 80/100/125/150 mm Sluice valves |
| 12 | OD275637/2025-2026:Repairing the leak of 15/20/25/40 mm Air valve by removing the damaged ball with providing new ball including all operation of the valve, bailing out water, including the cost of ball and grease ,etc. complete as per the direction of the departmental officers. |
| 13 | Engaging Labour |
| 14 | 100.98.1008:Engaging Coolie. |
| 15 | 100.98.1009:Engaging Fitter ( grade 1). |
| 16 | 100.98.1010:Engaging Assistant Fitter or 2nd class fitter. |
| 17 | Washing,Cleaning,Scouring & Conveyance Works |
| 18 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 19 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 20 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. |
| 21 | OD275633/2025-2026:Total cost for conveyance by Goods autorickshaw |
| 22 | OD275634/2025-2026:Towards the charges of Pipeline scouring by using air compressor including all labour charges, hire charges etc, complete as per the direction of departmental officers |
| 23 | OD275635/2025-2026:Hire Charges of Generator |
| 24 | OD318277/2025-2026:Washing Clarifloculator using brooms, brushes and bleaching powder by engaging coolies,scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab andcolumns, disposing the the slurry / waste materials away from the immediate premises andwithin the initial lead of 50m from the periphery of the clari floculator, without causing anydamage to the existing structure and installations, charges including the operation of valves,conveyance and hire charges of tools and as per the direction of the department officers etc.complete. |
| 25 | OD318278/2025-2026:Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies,scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab andcolumns, disposing the the slurry / waste materials away from the immediate premises andwithin the initial lead of 50m from the periphery of the tank, without causing any damage to theexisting structure and installations, charges including the operation of valves, conveyance andhire charges of tools and as per the direction of the department officers etc. complete |
| 26 | Road Restoration and Dismantling Works |
| 27 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. |
| 28 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 29 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road |
| 30 | 100.59.3:Restoring the road surfaces by providing and laying factory made cold bitumen-aggregate pot-hole repair mix in two layers of 25mm thick (total 50mm thick), by cleaning the surface with brooms etc. to remove dust/debris/water etc, placing the premix, compacting properly with hand-rammer etc. complete, including traffic control, providing caution boards and as per direction of Engineer-in-charge for road restoration works in pipeline leak sites. |
| 31 | 16.78.1:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30 |
| 32 | OD275639/2025-2026:Supplying,spreading and compacting Coarse sand (zone III) in the trenches as per standard norms, including cost of all materials. |
| 33 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 34 | OD275640/2025-2026:Conveying ,Supplying and Providing of Shelmack including all charges etc.complete Please Enable Macros to View BoQ information |