| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. In area of thorny jungle |
| 2 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 3 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 4 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 5 | Providing and laying bituminous macadam with Drum type hot mix plant using crushed aggregates of grading as per Table 500-7 premixed with bituminous binder, transported to site with all leads laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per MoRTH Specification Clause 504 |
| 6 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. |
| 7 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. |
| 8 | Hydraulic Excavator 0.9 cum@ Excavation 100 cum/h |
| 9 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905. 300 mm dia |
| 10 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905. 1000mm Dia |
| 11 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406 By Mechanical Means with a lead of 1 Km. |
| 12 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 Nominal mix 1:3:6 |
| 13 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 R.C.C grade M 20 |
| 14 | Supplying, fitting, and placing HYSD bar reinforcement (Primary Steel) in Foundation, Substructure and superstructure at any level complete as per drawing and MoRTH specifications Clauses 1009,1600 and 2302 |
| 15 | Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160\\" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements. |
| 16 | Providing and fixing PVC Bump Speed Breakers size 350 mm x 250 mm x 50 mm fitted with key hooks complete with labour material and traffic diversion arrangements. |
| 17 | Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing and Specifications. |
| 18 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 19 | Labour charges for making cofferdam by loading, transporting earth-filled cement bags, dropping at required location in water including transportation by boat (if required) complete, excluding cost of empty cement bags.with lead 150 mtr to 200 Mtr. |
| 20 | Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MoRTH specification Clause 3003 |
| 21 | Supply & Fixing of flood gauge (water Gauge) as per I.R.C. 67 standard 200 cm long fixed on angle iron posts 50x50x6 mm, 2.6 M. long. Please Enable Macros to View BoQ information |