| Sl. No. | Item Description |
| 1 | GENERAL SERVICES AND WHARFAGETHE ESTIMATED DRYDOCK AND AFLOAT REPAIRS IS 90 DAYS FROM THE DATE OF HANDING OVER THE VESSEL TO SHIPYARD |
| 2 | VESSEL TO BE SAFELY BERTHED AT A SUITABLE YARD'S REPAIR BERTH WHEN VESSEL IS NOT IN DRYDOCK. SERVICES ARE TO BE PROVIDED AT THE REPAIR BERTH AS WELL AS IN THE DRYDOCK AS REQUIRED. PLEASE QUOTE NUMBER OF DAYS BASIS INCLUDING BERTH HIRE CHARGES AND WHARFAGE. PAYMENT WILL BE MADE AT ACTUAL |
| 3 | ON ARRIVAL PLASTIC SHEETS TO BE LAID IN ALL ALLEYWAYS AND CABIN AND CONFERENCE ROOMS WHERE CARPET IS USED TO AVOID ANY DAMAGE TO EXISTING FLOOR MATS. |
| 4 | MOORING AND UNMOORING |
| 5 | MOORING & UNMOORING AND SHIFTING WITH THE ASSISTANCE OF PILOT REQUIRED NUMBER OF TUGS RIGGER, BOATSMAN AND DOCKING MASTER. |
| 6 | FOR BERTHING ON REPAIR BERTH ON VESSELS ARRIVAL. |
| 7 | FOR UNBERTHING TO ENTER DRYDOCK. |
| 8 | FOR BERTHING AT THE REPAIR BERTH AGAIN ONLY IF REQUIRED AFTER UNDOCKING. |
| 9 | FOR UNBERTHING FROM REPAIR BERTH FOR SEA TRIAL |
| 10 | FOR BERTHING AT THE REPAIR BERTH AFTER COMPLETION OF SEA TRIAL |
| 11 | FOR UNBERTHING FROM REPAIR BERTH FOR SAILING. |
| 12 | DOCKING AND UNDOCKING INCLUDING BLOCK PREPARATION AND SETTING AS PER DOCKING PLAN OF THE VESSEL (ONLY ONE VERSION DOCKING). PAYMENT WILL BE MADE AT ACTUALVESSEL TO BE SAFELY DOCKED IN A SUITABLE DRYDOCK ON BLOCKS OF ADEQUATE HEIGHT AS PER THE SHIP'S DOCKING PLAN. PLEASE NOTE THAT SAGAR MANJUSHA HAS TWO BLISTER ARRANGEMENTS (FRAME NO. 59 TO 63 : SIZE : 1690MM X 570MM, & FRAME NO. 66 TO 70, SIZE: 2200 mm x 898 mm) BELOW THE SHIP’S KEEL (570 MM) WHICH IS ALSO INDICATED IN THE DOCKING PLAN and blister arrangement plan. PLEASE QUOTE FOR TOTAL DRY-DOCK HIRE CHARGES FOR TOTAL PERIOD OF DD ON DAY BASIS. PLEASE NOTE WORK TO BE CONTINUED ON WEEKENDS AND HOLIDAYS. INCLUDES DOCK PREPARATION AND SETTING UP OF BLOCK ADEQUATE NO. OF DIVERS TO BE ARRANGED AT THE TIME OF DOCKING. UNDERWATER SENSORS/TRANSDUCERS SHALL BE TAKEN CARE WHILE DOCKING PROVIDING STAGING, HOT WORK, BLANKING, ELECTRICAL ISOLATION, CLEANING, HULL SUPPORT UN DOCKING AFTER COMPLETION OF DRYDOCK REPAIRS. ANY INTERMEDIATE UN-DOCKING/ RE-DOCKING FOR YARD PURPOSES OR DUE TO ANY DEFICIENCIES IN WATER-TIGHTNESS FOUND AFTER RE-FLOATING.UNDER THE SCOPE OF THE SHIPYARD WITHIN THE QUOTE PRICE. |
| 13 | PROVIDE PROTECTION OF EQUIPMENT ON DECK AND ACCOMMODATION DECK EQUIPMENT TO BE PROTECTED FROM DAMAGES DUE TO BLASTING AND OTHER DRY DOCK WORKSPORT HOLES, BRIDGE WINDOWS, ECR WINDOWS, ACCOMMODATION DOOR GLASSES AND OTHER OPENINGS TO BE PROTECTED FROM DAMAGES DUE TO BLASTING AND OTHER DRY DOCK WORKSALL VENTILATION INTAKES ON THE MAIN DECK TO BE COVERED PRIOR GRIT BLASTING. ALL PORT HOLES TO BE COVERED BEFORE GRIT BLASTING AND DURING PAINTING AND CLEANED AFTER COMPLETION OF WORKS. NECESSARY PROTECTION MATERIALS SHALL BE SUPPLIED FOR COVERING SCIENTIFIC / NAVIGATION EQUIPMENT/ ENGINE ROOM SENSORS |
| 14 | PROPOSED BLOCK SHIFTING – 20 BLOCKS (APPROX..)BLOCK SHIFTING FOR PAINTING LEFT OUT PORTION OF THE HULL (INITIAL DOCKING BLOCKS TO BE SHIFTED).PAYMENT WILL BE MADE ON PRO-RATE BASIS AT PER ACTUALS. |
| 15 | IF ANY EXTRA BLOCKS TO BE ARRANGED TO SUIT THE DOCKING ARRANGEMENT FOR PROPER LOAD SHARING WHILE SHIFTING. NOTE: IF VESSEL IS SHIFTED FOR YARD'S CONVENIENCE NIOT WOULD NOT BE LIABLE FOR CHARGES FOR SAME |
| 16 | FIRE PRECAUTIONS :TO SUPPLY SEA WATER FOR SHIP'S FIRE MAIN LINES AT ALL TIMES DURING ENTIRE PERIOD OF STAY. PRESSURES IN THE FIRE MAIN LINE ON DECK TO BE MAINTAINED AT LEAST AT 3 KGS PER CM SQ. SO THAT MINIMUM 2 FIRE HOSES CAN BE USED SIMULTANEOUSLY IN CASE REQUIRED |
| 17 | TO PROVIDE ONE FIRE WATCHMAN DURING ENTIRE PERIOD OF VESSEL'S STAY IN YARD PREMISES. |
| 18 | SHORE POWER SUPPLY DURING THE DRYDOCKPROVIDE SUITABLE POWER CABLE FROM YARD SWITCH BOARD TO SHIP SHORE CONNECTION BOX. PROVIDE 50HZ 200AMPS 3PH 415V POWER SUPPLY WITH SUITABLE CABLE - 800 KWH/DAY [APPROX. 60 DAYS]. CONNECTION AND DISCONNECTION OF SHORE POWER SUPPLY CABLES. MAKE SURE SHORE POWER SUPPLY AVAILABLE WITHOUT ANY POWER INTERRUPTION FOR 24 X 7 (48000 UNITS) |
| 19 | GARBAGE DISPOSAL : |
| 20 | SCOPE OF THE WORK INVOLVES:TO REMOVE GARBAGE & GALLEY REFUSE ONCE PER DAY [QTY - 0.5 CBM/PER DAY].TO PROVIDE ONE SEWAGE HOLDING PORTABLE TANK AND THE SAME TO BE CONNECTED TO MAIN SANITARY LINE TILL THE SHIP`S SEWAGE TREATMENT PLANT REMAINS NON-OPERATIONAL. |
| 21 | AT THE WRITTEN REQUEST OF SHIPS STAFF TO PROVIDE AS AND WHEN REQUIRED SHORE CRANE SERVICES FOR LIFTING OF SHIP'S STORES SPARES PROVISIONS ETC; ON BOARD. QUOTE CHARGES INCLUSIVE OF SLINGS AND RIGGERS. (ESTIMATED REQUIREMENT 3 HRS/PER DAY). NOTE: YARD MUST GET THE TOTAL TIME CRANE USED FOR EACH OCCASION CERTIFIED BY SHIP'S STAFF SHOWING THERE IN DATE AND HRS. OF EACH CRANE USAGE. [PAYMENT WILL BE MADE ON PRO-RATE BASIS] |
| 22 | GAS FREE / HOT WORK CERTIFICATES : |
| 23 | SCOPE OF THE WORK INVOLVES:YARD TO ARRANGE FOR GOVT. / AUTHORISED EXPLOSIVE INSPECTORS FOR OBTAINING GAS FREE CERTIFICATE / HOT WORK CERTIFICATE FOR COMPARTMENTS / TANK ON BOARD AS REQUIRED DURING THE REPAIR PERIOD.[PAYMENT WILL BE MADE ON PRO-RATE BASIS] |
| 24 | YARD TO ARRANGE FOR HOT WORK/ENCLOSED SPACE ENTRY PERMITS AS AND WHEN REQUIRED FOR HOT WORK / ENCLOSED SPACE ENTRY INVOLVED DURING THE REPAIR PERIOD AND COPY GIVEN TO THE SHIP STAFF CONSIDER 20 PERMITS. ASSUME 3 COMPARTMENTS TO BE CERTIFIED PERIODICALLY |
| 25 | FRESH WATER : SCOPE OF THE WORK INVOLVES:YARD TO SUPPLY FRESH WATER FOR SHIP'S DOMESTIC USE AS AND WHEN REQUIRED TOTAL ESTIMATED REQUIREMENT 400 TONS [APPROX.] [PAYMENT WILL BE MADE ON PRO-RATE BASIS] |
| 26 | COOLING WATER :SCOPE OF THE WORK INVOLVES:YARD TO SUPPLY COOLING WATER LINES FOR FRIDGE AND/OR AIR CONDITIONING UNITS DURING THE TIME WHEN VESSEL IS IN DRY DOCK ASSUME SUPPLY THROUGH TWO LINES. COST OF CONNECTION AND DISCONNECTION TO BE INCLUDED IN THE QUOTE. PLEASE NOTE: IN CASE COOLING WATER SUPPLY AS ABOVE IS COMMON WITH FIRE MAIN LINE YARD TO TAKE ADEQUATE PRESSURE IS MAINTAINED IN FIRE MAIN LINE AT ALL TIMES. |
| 27 | BALLAST WATER :SCOPE OF THE WORK INVOLVES:YARD TO FILL BALLAST WATER USING YARD'S PUMPS SAY 06 BALLAST TANKS AS REQUIRED IN 4 HRS. ESTIMATED QUANTITY OF BALLAST WATER TO FILL IN 200 TONS [APPROX.]N.B: YARD TO QUOTE RATES INCLUDING FOR RIGGING / UNRIGGING OF YARD'S PUMPS AND DUE ATTENDANCE DURING THE BALLASTING/ OPERATION. COST OF CONNECTION/DISCONNECTION TO BE INCLUDED IN THE QUOTE. |
| 28 | DE-BALLASTING :SCOPE OF THE WORK INVOLVES:YARD TO DE-BALLAST WATER USING YARD'S PUMPS FOR DE-BALLASTING IN SAY 06 BALLAST TANKS AS REQUIRED IN 4 HRS. ESTIMATED QUANTITY OF BALLAST WATER TO BE PUMPED OUT 200 TONS N.B: THE RATE QUOTED BY THE YARD TO INCLUDE RIGGING / UNRIGGING OF YARD'S PUMPS AND ATTENDANCE DURING DE- BALLASTING OPERATION. COST OF CONNECTION/DISCONNECTION TO BE INCLUDED IN THE QUOTE |
| 29 | WOODEN PLUGS :SCOPE OF THE WORK INVOLVES:YARD TO PROVIDE AND FIX 12 NUMBERS OF WOODEN PLUGS WITH SPOUTS TO SCUPPERS AND PIPES OF THE VESSEL IN DRYDOCK. [PAYMENT WILL BE MADE ON PRO-RATE BASIS] |
| 30 | SCRAP REMOVALSCOPE OF THE WORK INVOLVES:ALL SCRAP MATERIALS ARISING OUT OF THE REPAIRS WOULD BE DELIVERED TO THE SHIPYARD AS PER THE RATE QUOTED. [APPROX. 20 TONS] |
| 31 | GENERAL CLEANLINESSSCOPE OF THE WORK INVOLVES:YARD TO ARRANGE REGULAR CLEANING OF VESSEL ON COMPLETION OF REPAIRS ON DAILY BASIS FOR ALL AREAS AND COMPARTMENTS TO BE THOROUGHLY CLEANED AND FRESH WATER WASHED WHEREVER NECESSARY. PLEASE QUOTE LUMP SUM. |
| 32 | AUXILIARY SERVICES DURING THE DRYDOCK PROVIDE GANGWAY DURING THE STAY AT DOCK AND REPAIR BERTH |
| 33 | DRYDOCK SERVICES |
| 34 | ENGINE ROOM TO BE SUPPLIED BY AIR CHUTES FOR VENTILATION - 02 NOS |
| 35 | SERVICE AIRLINE TO BE PROVIDED WITH 7 KG/CM2 FOR ENTIRE PERIOD |
| 36 | SEWAGE CONNECTION / GREY WATER DRAIN LINE TO BE PROVIDED FOR DRYDOCK PERIOD |
| 37 | ENGINE ROOM, BUOY HOLD, AUXILIARY MACHINE ROOM BILGES TO BE TRANSFERRED DAILY/AS WHEN REQUIRED - APPROX. 100 CUBIC METRE |
| 38 | 25 MT HFHSD TO BE TRANSFERRED TO SHORE STORAGE TANKS AND TO BE PUMPED BACK TO SHIP TANKS AFTER REPAIRS. |
| 39 | HIGH PRESSURE WASHING |
| 40 | SCOPE OF THE WORK INVOLVES: ALL EXTERNAL SURFACES OF THE HULL TO BE CLEANED WITH HIGH PRESSURE FRESH WATER JETS TO REMOVE ALL THE FOULING AND SALT DEPOSITS AT A PRESSURE NOT LESS THAN 90KG/CM SQ. |
| 41 | NORMAL LIGHT SCRAPING OF UNDERWATER AREA MENTIONED IN THE ABOVE IMMEDIATELY AFTER DRY DOCKING TO REMOVE BARNACLES, LOOSE SCALE, RUST, CHALKED PAINT AND ANY OTHER FOREIGN MATTERS. UNDERWATER TRANSDUCER TO BE COVERED WITH 6 MM PLYWOOD. |
| 42 | FRESH WATER WASHINGALL EXTERNAL SURFACES OF THE HULL MAIN DECK AND ACCOMMODATION TO BE WASHED WITH FRESH WATER TO REMOVE ALL THE DIRT/ DUST PARTICLES BEFORE APPLYING COATS. FRESH WATER WASH IF REQUIRED IN BETWEEN COATS OF PAINT, SAME TO BE DONE WITHIN THE QUOTED PRICE |
| 43 | THICKNESS MEASUREMENT [UTG Gauging]SCOPE OF THE WORK INVOLVES:CONDUCTING ULTRASONIC THICKNESS GAUGING [including cleaning and preparation as required] BY IRS CLASS APPROVED INSPECTOR AND THE REPORT TO BE SUBMITTED TO IRS/NIOT. CONDUCTING ULTRASONIC THICKNESS GAUGING OF HULL, TANKS, VOID SPACES, SHAFT TUNNELS, COFFERDAMS, ACCOMODATION SPACE, SUPERSTRUCTURE & DECKS. CONDUCTING ULTRASONIC THICKNESS GAUGING OF POINTS AS PER IRS CLASS RECOMMENDATION. ULTRASONIC THICKNESS GAUGING REPORT WITH RECOMMENDATION FOR PLATE RENEWAL TO BE SUBMITTED TO IRS/NIOTFORECASTLE, BRIDGE SUPERSTRUCTURE, UPR DECK PLATING, FORECASTLE DECK PLATING, BRIDGE DECK PLATING, ENGINE ROOM, PORT CHAIN LOCKER, STBD CHAIN LOCKER, PORT BOSUN STORE (91-98), PORT VOID SPACE (59-70), STBD VOID SPACE (59-70), COFFERDAM (45-47), STBD PAINT STORE (91-98), FOREPEAK TANK (91-FWD) EXAMINATION TEST, PORT W B TANK (12-20) EXAMINATION TEST, STBD W B TANK (12-20) EXAMINATION TEST, PORT W B TANK (70-81) EXAMINATION TEST, STBD W B TANK (70-81) EXAMINATION TEST, CENTRE W B TANK (10-20), EXAMINATION TEST, PORT F W TANK (47-59) EXAMINATION TEST, STBD F W TANK (47-59) EXAMINATION TEST, PORT O.F TANK (20-32) EXAMINATION TEST, STBD O.F TANK (20-32) EXAMINATION TEST, PORT DAILY SERVICE TANK (45-50) EXAMINATION TEST, STBD DAILY SERVICE TANK (45-50), EXAMINATION TEST, PORT O. F TANK (32-45) EXAMINATION TEST, STBD.O. F TANK (32-45) EXAMINATION TEST,EMERG DG O. F TANK EXAMINATION TEST, BILGE HOLDING TANK (20-24) EXAMINATION TEST, PORT LUBE OIL TANK (20-23) EXAMINATION TEST, STBD LUBE OIL TANK (20-23) EXAMINATION TEST, DIRTY OIL TANK (20-22) EXAMINATION TEST, STBD WASTE WATER TANK (63-66) EXAMINATION TEST, DUCT KEEL(24-81), PORT SHAFT TUNNEL, STBD SHAFT TUNNEL, UNDER ENGINES STEERING GEAR COMPARTMENT, BOW THRUSTER COMPARTMENTCONTINOUS SURVEY OF TANKS, SUPERSTRUCTURE, ACCOMODATION AREA ETC. |
| 44 | SURFACE PREPARATION OF HULL, SEA CHESTS AREA & SUPERSTRUCTURE |
| 45 | SCOPE OF THE WORK INVOLVES: |
| 46 | GRIT BLASTING AND PAINTING |
| 47 | SCRAPPING, MUD REMOVAL, GRIT BLASTING TO BE CARRIED OUT TO SA2.5 STANDARD AND EDGE OF GRIT BLASTED AREAS TO BE SMOOTHENED BACK TO A FIRM EDGE. SHIP STAFF / NIOT REPRESENTATIVE WILL INSPECT ALL BLASTED AREAS BEFORE APPLICATION OF ANY PAINT. THE PAINTING SCHEME SHALL BE AS RECOMMENDED BY REPUTED PAINT MANUFACTURERS INTERNATIONAL, AKZO NOBEL, JOTUN OR EQUIVALENT SUBJECT TO APPROVAL OF OWNERS. THE PAINT IS UNDER THE SCOPE OF SHIPYARD SUPPLY (ABOVE WATER AREA: 950) |
| 48 | SCRAPPING, MUD REMOVAL, GRIT BLASTING TO BE CARRIED OUT TO SA2.5 STANDARD AND EDGE OF GRIT BLASTED AREAS TO BE SMOOTHENED BACK TO A FIRM EDGE. SHIP STAFF / NIOT REPRESENTATIVE WILL INSPECT ALL BLASTED AREAS BEFORE APPLICATION OF ANY PAINT. THE PAINTING SCHEME SHALL BE AS RECOMMENDED BY REPUTED PAINT MANUFACTURERS INTERNATIONAL, AKZO NOBEL, JOTUN OR EQUIVALENT SUBJECT TO APPROVAL OF OWNERS. THE PAINT IS UNDER THE SCOPE OF SHIPYARD SUPPLY (ABOVE WATER AREA: 1110) |
| 49 | PAINTING AS PER PAINT SCHEME (ABOVE WATER AREA) |
| 50 | EPOXY PRIMER GREY (15 MICRONS) |
| 51 | C.R. PRIMER LTGREY - |
| 52 | POLYURETHANE WHITE - FULL COAT |
| 53 | PAINTING AS PER PAINT SCHEME (UNDER WATER AREA) |
| 54 | EPOXY PRIMER GREY - Full coat |
| 55 | VINYL TAR EPOXY BLACK - Full coat |
| 56 | VINYL TAR EPOXY BROWN - Full coat |
| 57 | SPC ANTIFOULING LT. RED - Full coat |
| 58 | SPC ANTIFOULING RED - Full coat |
| 59 | PAINT SHIP'S NAME POR DRAFT & FREEBOARD MARKS (FINISH BLACK) APPROX. AREA-5M2) |
| 60 | WEATHER DECK: |
| 61 | EXPOSED DECKS OF DECK HOUSES TO SPOT CHIPPING TO BE CARRIED OUT (AREA 900 M2) |
| 62 | EXPOSED DECKS OF DECK HOUSES PRIMER ONE COAT TO BE CARRIED OUT (AREA 1800 M2). |
| 63 | EXPOSED DECKS OF DECK HOUSES FINAL ONE COAT (AREA 900 M2) |
| 64 | DECK MACHINERY FITTINGS TO SPOT CHIPPING CARRIED OUT (AREA 300 M2) |
| 65 | DECK MACHINERY FITTINGS TO BE APPLY 2 COAT PRIMER (AREA 600 M2) |
| 66 | DECK MACHINERY FITTINGS TO BE APPLY FINAL 1 COAT (AREA 300 M2) |
| 67 | TO PAINT FORWARD (PORT & STARBOARD) MID SHIPS (PORT & STARBOARD) & AFT DRAFT MARKS (STERN PORT & STARBOARD) MARK FOR BOW AND STERN THRUSTERS. |
| 68 | TO REMOVE RE-FIT AND SEAL BOTTOM PLUGS |
| 69 | REMOVE MANHOLE COVERS AND BOX UP SAME WITH NEW RUBBER PACKING JOINT FOR BALLAST/ FRESH WATER TANKS/OIL TANKS VOID SPACES AND TRUNKING AREA. |
| 70 | ESTIMATED MANHOLE COVERS TO BE OPENED /BOXED UP |
| 71 | TO RENEW DAMAGED STAINLESS-STEEL STUDS 23 MM DIA FOR APPROX .300 NOS. STUDS AND NUTS |
| 72 | TO REPLACE MISSING CAP NUT FOR APPROX 100 NOS |
| 73 | FORECASTLE DECK BOAT DECK AND MONKEY ISLAND: |
| 74 | FORECASTLE DECK BOAT DECK AND MONKEY ISLAND TOTAL AREA TO BE SPOT CHIPPED. |
| 75 | FORECASTLE DECK BOAT DECK AND MONKEY ISLAND TOTAL AREA TO BE CLEANING WITH FRESH WATER. |
| 76 | FORECASTLE DECK BOAT DECK AND MONKEY ISLAND TOTAL AREA TO BE PRIMER TWO COAT. |
| 77 | FORECASTLE DECK BOAT DECK AND MONKEY ISLAND TOTAL AREA TO BE FINAL ONE COAT. |
| 78 | FUNNEL [PORT AND STARBOARD SIDE]: |
| 79 | FUNNEL OUTSIDE COPPER SLAG OR QUARTZ BLASTED (POWER TOOLING) |
| 80 | FUNNEL OUTSIDE TO BE PAINTED AS PER PAINTING SCHEME AND FINISH BLACK. |
| 81 | HATCH COVERS (MAIN DECK BUOY HOLD SKYLIGHT) – SIZE : 2.5 X 2.5 M |
| 82 | HATCH COVER INSIDE GRIT / COPPER SLAG BLASTED. |
| 83 | HATCH COVER OUTSIDE GRIT / COPPER SLAG BLASTED. |
| 84 | HATCH COVER TO BE PRIMER 2 COATS CARRIED OUT. |
| 85 | HATCH COVER OUTSIDE TO BE FINAL ONE COAT OF EPOXY. |
| 86 | BULWARK |
| 87 | BULWARKS INSIDE QUARTZ/COPPER BLASTED |
| 88 | BULWARKS INSIDE TO BE PRIMER 2 COATS CARRIED OUT. |
| 89 | BULWARKS INSIDE TO BE ONE COAT FINISH SURF GREY CARRIED OUT. |
| 90 | MASTS |
| 91 | FWD MAST MAIN MAST STERN POST GRIT TO BE BLASTED |
| 92 | FWD MAST MAIN MAST STERN POST PRIMER TWO COATS TO BE CARRIED OUT. |
| 93 | FWD MAST MAIN MAST STERN POST TO BE FINAL ONE COAT FINISH WHITE. |
| 94 | AFT DECK WOODEN SHEATHING TO BE TWO COATS OF BITUMINOUS. |
| 95 | ALL WEATHER DECK MUSHROOM VENTILATION TRUNKS INSIDE GRIT BLASTED. VENTILATION TRUNKS INSIDE TO BE PAINTED AS PER PAINTING SCHEME AND FINAL FINISH COAT WHITE. PLS QUOTE FOR GRIT BLASTING 200 M2 PRIMER 400 M2 AND FINISH COAT 200 M2. |
| 96 | BUOY HOLD |
| 97 | FLOORING AREA TO BE POWER TOOLED AND POWER BRUSHING. TOTAL AREA- 160 SQ.M . |
| 98 | BUOY HOLD FLOOR AREA PRIMER TWO COATS TO BE CARRIED OUT TOTAL AREA - 160 SQM. |
| 99 | BUOY HOLD FLOOR AREA TO BE FINAL COAT CARRIED OUT TOTAL AREA - 160 SQM. |
| 100 | DECK HEADS AND BULKHEADS TO BE POWER TOOLED AND POWER BRUSHING BY 10% OF TOTAL AREA. TOTAL AREA - 396 SQ.M. |
| 101 | DECK HEADS AND BULKHEADS TO BE APPLY 2 COATS OF PRIMER TOTAL AREA - 792 SQ.M |
| 102 | DECK HEADS AND BULKHEADS TO BE ONE COAT OF FINISH LIGHT GREY. TOTAL AREA - 396 SQ.M |
| 103 | SUPER STRUCTURE |
| 104 | DECK HOUSE EXTERIOR SUPERSTRUCTURE OUTSIDE EXPOSED BULKHEADS TO BE SPOT CHIPPED BY 5% OF TOTAL AREA. TOTAL AREA - 756 SQ.M (INCLUDES WHEEL HOUSE FORECASTLE DECK AREA AND MAIN DECK AREA) |
| 105 | DECK HOUSE EXTERIOR SUPERSTRUCTURE OUTSIDE EXPOSED BULKHEADS TO BE APPLY TWO COATS OF PRIMER. TOTAL AREA - 1512 SQ.M (INCLUDES WHEEL HOUSE FORECASTLE DECK AREA AND MAIN DECK AREA) |
| 106 | DECK HOUSE EXTERIOR SUPERSTRUCTURE OUTSIDE EXPOSED BULKHEADS TO BE ONE COAT OF FINISH WHITE. TOTAL AREA - 756 SQ.M (INCLUDES WHEEL HOUSE FORECASTLE DECK AREA AND MAIN DECK AREA) |
| 107 | BOLLARDS AND FAIRLEADS: |
| 108 | BOLLARD AND FAIRLEADS GRIT / COPPER SLAG BLASTED SA 2.5. TOTAL NO OF BOLLARDS - 10 NOS & FAIRLEADS - 14 NOS. |
| 109 | A-FRAME: |
| 110 | A FRAME TO BE SPOT CHIPPED |
| 111 | A FRAME TO BE TWO COATS PRIMER TO BE CARRIED OUT. TOTAL AREA - 90 SQ.M. |
| 112 | A FRAME TO BE FINAL COAT PAINTED. TOTAL AREA - 90 SQ.M. |
| 113 | ANTI-HEELING TANK |
| 114 | ANTI-HEELING TANK CHIPPING TO BE CARRIED OUT. TOTAL AREA - 120 SQ.M |
| 115 | ANTI-HEELING TANK PRIMER TWO COAT TO BE CARRIED OUT. TOTAL AREA - 240 SQ.M |
| 116 | ANTI-HEELING TANK FINAL COAT TO BE CARRIED OUT. TOTAL AREA - 120 SQ.M |
| 117 | ANTI-HEELING TANK TO BE REMOVED FROM LOCATION, REQUISITE DECK STRENGTHENING AND STEEL RENEWAL TO BE DONE [TM TO BE TAKEN] ON THE BASE PLATE AND ON THE TANK TO THE SATISFACTION OF THE ATTENDING CLASS SURVEYOR AND RE-INSTALL THE TANKS. ALL INWAYS JOBS VIZ., REMOVAL OF LAGGINGS, CABLES, ETC., IN THE BELOW DECK LEVEL IS UNDER THE SCOPE OF SHIPYARD. ANTI HEELING TANK FRAMES RUSTED AND HOLED, SAME TO BE RENEWED. ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 118 | HATCH COVERS (BUOY HOLD COVER) REPAIRS |
| 119 | AFTER GRIT BLASTING WASTED AND CORRODED STIFFENERS TO BE RENEWED. BUOY HOLD PONTOON TO BE ALIGNED FOR PROPER CLOSURE. COMPRESSION BAR THICKNESS OF BUOY HOLD TO BE CHECKED AND MODIFIED FOR ALIGNMENT OF PONTOONS. CLEATS TO BE EASED. |
| 120 | PACKING TO BE RENEWED APPROX LENGTH 18MTRS. PACKING DIMENSIONS AS PER EXISTING |
| 121 | ANCHOR CABLES & CHAIN LOCKER [T 28 MM DIAMETER OF CHAIN]. All spares, materials, consumable is under the scope of shipyardScope of work involves: |
| 122 | BOTH ANCHOR CHAINS TO BE RANGED IN THE DRYDOCK AND HIGH PRESSURE WASHED 06 LENGTH PORT AND 07 LENGTH STBD |
| 123 | GRIT BLASTING OF ANCHOR CHAIN BOTH PORT & STARBOARD AND MARKINGS. |
| 124 | GAUGING OF ANCHOR CHAIN TO BE CARRIED OUT AFTER RANGING THE CHAIN ON THE DOCK. CHECK THE SWIVEL ANCHOR SHACKLES AND THE KENTER SHACKLES. SECURE BACK IN POSITION AFTER COMPLETION THE WORK. |
| 125 | BOTH PORT AND STARBOARD ANCHORS TO BE SHOWN TO THE SURVEYOR WORK TO BE CARRIED OUT AS PER SURVEYOR’S RECOMMENDATION (IF ANY REMARK FROM SURVEYORS SAME TO BE RENEWED within quoted price) |
| 126 | BOTH SIDE ANCHOR CHAINS TO BE CHIPPED AND PAINTED. (06 SHACKLES ON PORT AND 07 SHACKLES LENGTH ON STBD. |
| 127 | CHAIN LOCKERScope of work involvesAll spares, materials, consumable is under the scope of shipyard |
| 128 | CHAIN LOCKERS TO BE DE-MUCKED including water removal, |
| 129 | GRIT BLASTING OF ENTIRE CHAIN LOCKER INCLUDING HAWSE PIPE AND SPURLING PIPE. |
| 130 | BITUMINOUS COATING and fresh water washing before any coating |
| 131 | EACH 02 NOS HAWSE PIPE AND SPURLING PIPE COVERS AND LOCKING ARRANGEMENTS TO BE RENEWED. (DIA: 300MMX 2 AND 200 MM X 2) |
| 132 | WINDLASS GYPSY TEETH HAS GOT CLEARANCE & MORE PLAY SAME TO BE REPAIR/REPLACE. QUOTE FOR FULL JOB. |
| 133 | NOTE: SHOULD INCLUDE STAGING CLEANING REMOVAL/REFIT OF OBSTRUCTIONS/INSULATIONS/BULKHEADS/NDT. BULKHEAD SHOULD BE RENEWED BY THE BIDDER AT NO EXTRA COST. |
| 134 | WRITING OF LETTERS AND SYMBOLSScope of work involves |
| 135 | PAINTING OF HULL MARKINGS PLIMSOLL MARK, SHIP NAME AND PORT OF REGISTRY AT FORWARD AND AFT, OWNER LOGO, PAINTING ON BOTH PORT AND STARBOARD SIDE, SONAR AREA MARKING, PAINTING OF IMO NO. AND DRAFT MARKINGS, PAINTING OF OWNER’S LOGO ON SUPERSTRUCTURE, TANK MARKINGS, BULBOUS BOW MARKINGS, PROPELLER MARKING AND BOW THRUSTERS’ MARKINGS. IMO NO./DRAFT MARKING/PORT OF REGISTRY IS TO BE EMBOSSED/WELDED AS PER THE CLASS REQUIREMENTS. |
| 136 | IMO NUMBER MARKING TO BE ENGRAVED ON THE ENGINE ROOM BULKHEAD WITH WELD AND PAINTED |
| 137 | DE-MUCKING / PAINTING OF TANKSSCOPE OF WORK INVOLVES: CLEANING AND PAINTING OF TANKS AS PER THE REQUIREMENT OF SPECIAL SURVEY. THE WORK ALSO INCLUDE INWAY JOBS LIKE MUD REMOVAL, CHIPPING, CLEANING AND PAINTINGALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 138 | FRESH WATER TANK PAINTING (FR NO: 47-59) PORT & STBD 02 NO’S |
| 139 | SCRAPING CHIPPING WIRE BRUSHING REMOVAL OF MUCK |
| 140 | CEMENT COATING TO BE CARRIED OUT PORT AND STBD TANK |
| 141 | LOW PRESSURE WASHING CLEANING MOPPED WITH COTTON WASTE |
| 142 | FILLING FRESH WATER AND CURING 2 TIMES REMOVAL AND REFITTING OF MANHOLE COVER WITH NEW GASKETS BOLT AND NUTS |
| 143 | FOREPEAK TANK (FR 91-FWD) TO BE DE-MUGGED AND CLEANED. |
| 144 | FOREPEAK TANK (FR 91-FWD) TO BE MANHOLE COVER RUBBER PACKING RENEWED. |
| 145 | FOREPEAK TANK (FR 91-FWD) TO BE SPOT DE-RUSTING WITH POWER TOOL AND APPLY TWO COATS OF PAINT (BITUMINOUS) |
| 146 | FOREPEAK TANK (FR 91-FWD) TO BE FINAL COAT PAINTING TO BE CARRIED OUT. |
| 147 | P & S WATER BALLAST TANKS (FR 12-20) TO BE DE-MUGGED AND CLEANED. EACH 6.6 CU.M. |
| 148 | P & S WATER BALLAST TANKS (FR 12-20) TO BE MANHOLE COVER RUBBER PACKING RENEWED. |
| 149 | P & S WATER BALLAST TANKS (FR 12-20) TO BE SPOT DE-RUSTING WITH POWER TOOL AND APPLY TWO COATS OF INTERTUF 16 (BITUMINOUS). |
| 150 | P & S WATER BALLAST TANKS (FR 12-20) TO BE FINAL COAT PAINTING CARRIED OUT |
| 151 | P & S WATER BALLAST TANKS (FR 70-81) TO BE DE-MUGGED AND CLEANED. EACH 21 CU.M. |
| 152 | P & S WATER BALLAST TANKS (FR 70-81) MANHOLE COVER RUBBER PACKING RENEWED. |
| 153 | P & S WATER BALLAST TANKS (FR 70-81) SPOT DE RUSTING WITH POWER TOOL AND APPLY TWO COATS OF INTERTUF 16 (BITUMINOUS). |
| 154 | P & S WATER BALLAST TANKS (FR 70-81) FINAL COAT PAINTING CARRIED OUT |
| 155 | CENTER WATER BALLAST TANKS (FR 10-20) TO BE DE MUGGED AND CLEANED 22 CU.M. |
| 156 | CENTER WATER BALLAST TANKS (FR 10-20) TO BE MANHOLE COVER RUBBER PACKING RENEWED. |
| 157 | CENTER WATER BALLAST TANKS (FR 10-20) TO BE SPOT DE RUSTING WITH POWER TOOL AND APPLY TWO COATS OF INTERTUF 16 (BITUMINOUS). |
| 158 | CENTER WATER BALLAST TANKS (FR 10-20) TO BE FINAL COAT PAINTING CARRIED OUT |
| 159 | VOID SPACE (P & S ) FRAME 60-70 TO BE DE RUSTED BY POWER TOOL . |
| 160 | VOID SPACE (P & S ) (FR 60-70) TO BE MANHOLE COVER RUBBER PACKING RENEWED. |
| 161 | VOID SPACE (P & S) (FR -60-70) FINAL COAT PAINTING AS PER PAINTING SCHEME |
| 162 | COFFERDAM (P & S ) TO BE DE RUSTED BY POWER TOOL AND APPLY ONE COAT PRIMER . |
| 163 | COFFERDAM (P & S ) TO BE MANHOLE COVER RUBBER PACKING RENEWED. |
| 164 | COFFERDAM (P & S) TO BE FINAL COAT PAINTING TO BE CARRIED OUT |
| 165 | WASTE WATER TANK FR-63-66 TO BE SCRAPPED CHIPPED AND WIRE BRUSHED REMOVAL OF MUCK |
| 166 | WASTE WATER TANK FR-63-66 TO BE MANHOLE COVER RUBBER PACKING RENEWED. |
| 167 | WASTE WATER TANK FR-63-66 TO BE PRIMER APPLIED |
| 168 | WASTE WATER TANK FR-63-66 TO BE FINAL COAT PAINTED |
| 169 | TO PROVIDE GAS FREE BLOWER FOR ALL TANK JOBS (TOTAL - 12 TANKS) |
| 170 | SLUDGE TO BE REMOVED FOR ALL TANK JOBS. (TOTAL 12 TANKS) |
| 171 | ALL FO tanks to be considered for cleaning, demucking and oil mopping [refer tank testing plan] [6 FO tanks] |
| 172 | MUSHROOM VENTILATORSSCOPE OF WORK INVOLVES: MUSHROOM VENTILATORS-CAPACITY / OTHER DETAILS: TOTAL 11 NOS. MUSHROOM VENTILATORS LOCATED ON MAIN DECK (4) FORECASTLE DECK (3) MONKEY ISLAND (4). ALL MUSHROOM VENTILATORS HEADS TO BE DISMANTLED AND TAKEN ASHORE AND OVERHAULED .0.5M DIA APPROX... ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 173 | INSIDE AREA OF THE VENTILATOR TOP COVERS AND VALVE LID TO BE GRIT BLASTED UP TO SA 2.0 STANDARD. APPROX AREA OF EACH VENTILATOR TO BE BLASTED IS 1 SQ M. |
| 174 | ALL VENTILATORS TO BE PRIMED TWO COAT. TOTAL -10 NOS. MAIN DECK F'CLE DECK BOAT DECK & MONKEY DECK. |
| 175 | ALL VENTILATORS TO BE FINAL ONE COAT. TOTAL -10 NOS. MAIN DECK F'CLE DECK BOAT DECK & MONKEY DECK. |
| 176 | WASTED AND CORRODED WIRE MESH TO BE RENEWED.(.0.5M DIA MESH) |
| 177 | SEAT PACKING OF THE VENTILATORS TO BE RENEWED. |
| 178 | SPINDLE OF ALL MUSHROOM VENTILATORS TO BE CHECKED AND INSPECTED FOR DAMAGES. |
| 179 | AIR PIPES/VENTS ON DECKALL THE AIR VENT HEADS OF BALLAST TANKS VOID SPACES FUEL OIL TANKS AND PASSAGE WAYS TO BE REMOVED FROM PLACE CLEANED INSPECTED AND PAINTED. DAMAGED AND WORN-OUT NEOPRENE RUBBER SEAT RINGS WIRE MESH AND FLOATS TO BE RENEWED. IRS TO BE INSPECTED THE VENT HEADS. AIR VENT PIPES, HOLED OR THINNED DOWN, TO BE CUT FROM DECK AND THE PIPE TO BE RENEWED.PIPE DIMENSION-DIA-35CM, LENGTH-5M. TOTAL 10NOS..ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 180 | RENEWAL OF STEEL IN HULL, SUPER STRUCTURE AND DECK (PAYMENT AS PER ACTUAL QUANTITY)SCOPE OF THE WORK INVOLVES: AFTER THE DOCKING SURVEY AS RECOMMENDED BY THE CLASS SURVEYOR DAMAGED HULL PLATE TO BE RENEWED AS AND WHERE REQUIRED. QUOTE AN ESTIMATED APPROX.: 30 APPROX TONS STEEL RENEWAL. STEEL GRADE SHALL BE APPROVED BY IRS CLASS. [PAYMENT WILL BE MADE AT ACTUALS ON PRO-RATE BASIS]. THE SCOPE ALSO INCLUDES THE FOLLOWING BUT NOT LIMITED TO below indicated work. Further, inways jobs like, removal and refitting of lagging/insulation, pipes, equipment, etc. to undertake the requisite steel renewal to be considered within the quoted price. ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 181 | STERN THRUSTER DRIVE PANEL BULKHEAD LOWER PORTION THINDOWN AND HOLED SAME TO BE ATTENDED (AT BUOY HOLD) |
| 182 | STEERING COMPARTMENT FWD BULKHEAD BETWEEN BUOY HOLD FOUND CORRODED AND THINNED DOWN IN VARIOUS PLACES, TO BE CROP AND RENEW. |
| 183 | ALL BALLAST TANKS, CORRODED AND THINNED DOWN TANK PORTION NEAR MANHOLE COVER AREA TO BE CROPPED AND RENEWED. |
| 184 | MONKEY ISLAND FLOOR STEEL RENEWAL. |
| 185 | WHEELHOUSE FLOOR STEEL RENEWAL. |
| 186 | FOCSLE DECK STBD SIDE IN WAY OF CHIEF ENGINEER CABIN OUTSIDE CABIN BULKHEAD NEAR FIRE HOSE BOX AREA FOUND THINNED DOWN AND HOLED SAME TO BE RENEWED |
| 187 | FORECASTLE DECK ACCOMODATION AREA, ALEYWAYS, CABINS, BATHROOMS FLOOR STEEL RENEWAL TO BE DONE AS PER THE TM RESULT. |
| 188 | MAIN DECK ACCOMODATION AREA, ALLLEWAYS, CABINS, BATHROOMS FLOOR STEEL RENEWAL TO BE DONE AS PER THE TM RESULT. |
| 189 | EMERGENCY ESCAPE (OPP GALLEY)PORT SIDE BULKHEAD BOTTOM AREA FOUND THINNED DOWN AND HOLED SAME TO BE CROPPED AND RENEWED |
| 190 | SHIP’S CREW MESS ROOM BILGE FOUND BADLY CORRODED, THINNED DOWN AND HOLED (PORT SIDE VOID SPACE BULKHEAD) SAME TO BE CROP AND RENEWED. LENGTH-1.2M, BREADTH-0.75M |
| 191 | SHIP’S GALLEY BILGE FOUND BADLY CORRODED, THINNED DOWN AND HOLED (STBD SIDE VOID SPACE BULKHEAD) SAME TO BE CROP AND RENEWED.LENGTH-1.2M,BREADTH-0.75M |
| 192 | NEWLY INSTALLED BLISTER ARRANGEMENT TO BE ADDED IN THE GA PLAN and Docking Plan. CLASS SURVEYORS TO BE NOTIFIED AND VERIFICATION TO BE CARRIED OUT. Plans to be prepared by approved Firm and UPDATED PLANs TO BE PROVIDED WITH CLASS APPROVAL. |
| 193 | SUPPLY AND FITMENT OF NEW ANODES (AL ALLOY ANODES) SCOPE OF WORK INVOLVES:ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD [10 big anode and 3 small anode are already kept onboard] |
| 194 | CUTTING AND REMOVAL OF OLD ANODES 11.5 KGS (12.85 GROSS WT) |
| 195 | CUTTING AND REMOVAL OF OLD ANODES 2.505 KGS (3.105 GROSS WT) |
| 196 | WELDING OF NEW ANODES (11.5 KGS) FILLET WELD SIZE SHOULD BE 6 MM |
| 197 | WELDING OF NEW ANODES (2.505 KGS) AT SEA CHESTS |
| 198 | GREASING OF ANODES AND CLEANING AFTER PAINTING. |
| 199 | BRIDGE EQUIPMENTS ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 200 | ONE NUMBER new X-RADAR to be supplied and commissioned with following specification. SCANNER SIZE, WATTAGE, TYPE APPROVED. Power Output: 12 kW (nominal).Display: 19-inch color LCD (1280 x 1024 resolution) with anti-reflection coating.Radar Frequency: 9410 30 MHz (X-band).Range Scale: 0.125 to 64 or 72 NM.Scanner Unit: Available in 4 ft, 6 ft, or 9 ft open arrays (Type: RB808P).Rotation Speed: 24 rpm.Min Detection Distance: Within 40 meters.Target Tracking (TT): Up to 100 targets.AIS Interface: Up to 900 targets.Input Voltage: 21.6 - 41.6 V DC.Waterproofing: IPx6 (Antenna).ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. All inway jobs but not limited to removal and refitment of insulation , panels, cabling, etc to be considered within the quoted price |
| 201 | RADAR (P) - UPS TO BE RENEWED WITH LATEST MODEL JRC OR FURUNO. Output SpecificationsPower Capacity: 1600 Watts / 2000 VANominal Output Voltage: 230V (Configurable for 220V or 240V nominal output voltage)Output Frequency: 50/60 Hz +/- 3 Hz (user selectable)Waveform Type: Sine waveTopology: Double Conversion OnlineOutput Connections: * (6) IEC 320 C13(1) IEC 320 C19Input SpecificationsNominal Input Voltage: 230VInput Frequency: 45 - 65 Hz (auto sensing)Input Connection: IEC-320 C20Input Voltage Range (Main Operations): 160 – 280VOther Input Voltages: 220V, 240VALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 202 | ALL EQUIPMENTS ON BRIDGE ON/OFF WARNING LIGHT TO BE CHECKED AND RENEWED. IF ANY PCB COMPLAINT / SOCKET COMPLAINT / SWITCH / PUSH BUTTON COMPLAINTS FOUND, SAME TO BE RENEWED.(24V,LED BULB)- 50 nos |
| 203 | BRIDGE SPLIT AC 2 TON TO BE SUPPLIED, AND INSTALLED and commissioned. (Voltas / DAIKIN / Carrier) |
| 204 | DESKTOP ALONG WITH UPS TO BE SUPPLIED AND INSTALLED. PROCESSOR (CPU): INTEL CORE I7-13400/14400 OR AMD Ryzen 9000 Series (Zen 5)MEMORY (RAM): 16GB DDR5 STORAGE: 1TB SSD with 24 inch monitor and antivirus [3 years subscription] |
| 205 | GPS DISPLAY TO BE RENEWED WITH COMPATIBLE ONE. MAKE - FURUNO GP 150 |
| 206 | ECHO SOUNDER DISPLAY TO BE RENEWED. MAKE - FURUNO FE 700. |
| 207 | NAV CONSOLE CABLES AND BRIDGE EQUIPMENTS CABLES TO BE LABELLED, SECURED using conduit pipes, AND UNWANTED CABLES TO BE REMOVED. PROPER OPERATION AFTER THE WORKS TO BE ENSURED. OEMS PRESENCE AND PARTICIPATION TO BE OBTAINED DURING THE JOB TO ENSURE THE SATISFACTORY WORKING OF THE EQUIPMENTS AFTER THE JOB. 30 equipment on bridge |
| 208 | Location: BridgeTHE EXISTING ECDIS TO BE PROVIDED WITH ALL FEATURES FOR THE NAVIGATION, SUBSCRIPTIONS IF ANY TO GET ALL THE FEATURES TO BE PROVIDED. DEMONSTRATION OF ACCESSING THE FEATURES AND A MANUAL/HANDBOOK ALSO TO BE PROVIDED. ECDIS present charts subscription [for 3 years] to be renewed. All Indian coastal charts [East and West Coast enroute Sri lanka] including Lakshadweep Islands to be provided and installed.ECDIS Make and Model:Raytheon Anschütz SynapsisMr. T.Janagan Elcome Integrated Systems Pvt., Ltd.,#1, Kandhasamy Street, First Floor, Chandrabagh Avenue Extension, Mylapore, Chennai - 600004Phone : 91-44-28477350, 91-44-28477360, +91-22-23483514, +91-22-67618451, +91-22-23482523, +91-22-23484518Fax : 91-44-28474247Mobile : 91-9840036776E-mail : [email protected], [email protected]., [email protected], [email protected], [email protected], [email protected] |
| 209 | NAV LIGHTING PANEL IN WHEELHOUSE TO BE RENEWED. CABLING TO BE CHECKED AND RENEW IF REQUIRED. LIGHTS SOCKETS TO BE RENEWED. NAV LIGHTS LOCAL PCBS TO BE RENEWED. NAVIGATIONAL SIDE LIGHTS SHADE TO BE RENEWED. |
| 210 | ADMIRALTY DIGITAL PUBLICATIONS TO BE PROVIDED WITH NECESSARY UPDATING SYSTEM FOR WEEKLY UPDATE. |
| 211 | MUTI GAS DETECTOR (RIKEN KEIKI- GX - 8000) WITH TYPE APPROVAL CERTIFICATE TO BE SUPPLIED ALONG WITH CALIBERATION CERTIFICATE |
| 212 | TYPE APPROVED FIRE FIGHTERS WALKIE TALKIE WITH MOUTH PIECE TO BE SUPPLIED |
| 213 | HAND-RAILING PIPELINES RENEWEL (PAYMENT AS PER ACTUAL QUANTITY) ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 214 | BOTH RADAR SCANNER MAST PLATFORM HAND RAILING PIPES THINNED DOWN AND HOLED. LENGTH-5M, DIA-40CM |
| 215 | RAILING PIPES HOLED IN SOME LOCATIONS (2 INCH DIA *10M APPROX). |
| 216 | MONKEY DECK SAT C ANTENNA MOUNTING PIPELINE FOUND CORRODED AND WASTED SAME TO BE RENEWED. LENGTH-1M, DIA-30CM |
| 217 | HAND RAILING TO BE RENEWED IN VARIOUS PLACES. BIG RAILING DIA-5CM , LENGTH-50M, SMALL RAILING DIA-3CM, LENGTH-90M |
| 218 | PIPELINES RENEWAL (PAYMENT AS PER ACTUAL QUANTITY) - ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 219 | DECK AIRLINE PENETRATION PIPE LINE FROM BULKHEAD TO BRANCH LINE IN VARIOUS PLACES FOUND CORRODED AND THINNED DOWN SAME TO BE CROPPED AND RENEWED. DIA-5CM, LENGTH-50M |
| 220 | SCUPPER DRAIN PIPE IN SOME PLACES HOLED AND SUPPORT BRACKETS THINNED DOWN AND DAMAGED.DIA-10CM, LENGTH-20M |
| 221 | W/H STBD FW PIPELINE TO BE RENEWED (DIA-15MM TO 20MM APPROX,LENGTH-3M) |
| 222 | IN AFT MAIN DECK HAND OPERATED BILGE PUMP DISCHARGE LINE TO BE RENEWED. LENGTH-1.50M, DIA-20CM |
| 223 | FRESH WATER PIPELINE , DIA - 45MM , LENGTH 25 MTR |
| 224 | F/W HYDROPHORE SUCTION PIPE FROM TANK TO BE RENEWED. 50MM DIA, 20 MTR LENGTH, 8 BENDS, 4 FLANGES |
| 225 | HOT WATER LINE FROM TO CALORIFIER TO ACCOMODATIONS SPACES TO BE RENEWED WITH HIGH TEMP RESISTENCE EPOXY COATED PIPEES SPECIALLY FOR CARRYING HOT WATER. FLANGES TO BE PROVIDED IN STANDARD INDUSTRY MANNER. - 60MM DIA, APPROX -60 MTR |
| 226 | IOPP FRESH WATER SUCTION LINE FROM SOLENOID TO PUMP TO BE RENEWED, 1.5METER (THREAD TYPE) |
| 227 | FUEL OIL TRANSFER PUMP SUCTION AND DISCHARGE PIPELINES NEED TO MODIFIED( REDUCER ON BOTH SUC AND DIS SIDES) |
| 228 | AE NO2 -SEAWATER ATTACHED PUMP PIPELINES MODIFICATION NEEDED 2 BENDS, 2 METER |
| 229 | HOT WATER LINE IN E/R WORKSHOP HOLED AND LEAKING TO RENEW WITH INSULATION 4 MTR |
| 230 | All 5 scientist cabins Vinyl flooring to be removed and renewed with new one. Area: 700 sq feet |
| 231 | All cabin drain lines to be chemically cleaned. The existing single continuous drain lines from crew accommodation to be modifed with intermediate flanges, elbows, connecter's, coupling, etc. Length of existing drain line: 50 m. Same to be cropped and fitted with maximum length of 2 m. (125MM*60M,75MM*20M, 60MM*20M APPROX) No of flanges: 25 [approx] |
| 232 | Deck plates behind all the bathroom commode to be cropped and renewed. [5 m2.] All inway job including removal and refit of commode, panel, insulation, machinery/equipment, etc. to be included within the quoted price. |
| 233 | Sofa Cushions and Rexin covers for scientist cabins [3 nos] to be renewed |
| 234 | Carpentary work on Galley, crew mess room, officer's mess room, scientist cabins [5 nos], lab to be undertaken as per NIOT rep instruction. [total area 1500 sq feet]. Payment will be made on actuals on pro-rate basis based on the actual work executed.5 racks with 3 drawers each to be considered. |
| 235 | MISCELLANEOUS REPAIRSALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 236 | MONKEY DECK AFT DGPS ANTENNA BASE BROKEN, NEEDS TO BE RENEWED.LENGTH-3M, DIA-20CM |
| 237 | INTEGRITY OF MAIN MAST TO BE CHECKED AND STAY WIRE TO BE ADDED 3NOS WITH EYE ON DECK AND MAST -(1INCH *20M APPROX) |
| 238 | WINDLASS CABLE CONDUIT PIPE TO BE RENEWED. DIA-25CM,LENGTH-80CM . CABLES TO BE REMOVED AND FITTED FOR THIS WORK. |
| 239 | SHIPS SCUPPER LINES TO BE CLEANED / FLUSHED FROM SCUPPER TO OVERBOARD. (TOTAL - 14, SIZE- 62 MM) |
| 240 | ALL BOLLARD SWL MARKING TO BE WELDED. |
| 241 | ALL LADDER LASHING EYES ARE CORRODED AND THINNED TO BE REPLACED(DIA-3CM) |
| 242 | DRAINAGE SYSTEM TO BE CHECKED, CLEARED AND TO BE TRIED OUT IN ALL ACCOMMODATION. [14CABINS] |
| 243 | MEDICAL LOCKER DOOR FRAME TO BE RENEWED (LENGTH:1.8M,BREADTH:1M) |
| 244 | CONSIDER SLUDGE REMOVAL FROM BUNKER TANKS AND CLEANING AND DEMUCKING TO BE DONE [6 FO TANKS] |
| 245 | AC DUCT END COVER WITH OPEN CLOSE PROVISION NEED TO BE RENEWED.(40NOS) AND TOILET EXHAUST VENT DIFFUSER NEED TO BE RENEWED.(13NOS) |
| 246 | CCTV CABLES, CABLE TRAY, CONNECTORS, CLAMPINGS TO BECHECKED. IF DEFECTIVE CAMERA,CABLE JUNCTION BOX, CABLETRAY, CONNECTORS, TO BE RENEWED. SATISFACTORY OPERATION TO BE SHOWN TO SHIP STAFF (SPARES TO BE SUPPLIED BY YARD) |
| 247 | ACCOMMODATION PORT HOLE/ WINDOW IN VARIOUS PLACES FOUND LEAKING TO BE ATTENDED AND RECTIFIED. RUBBER BEADING TO BE RENEWED. DOOR SUPPORTING CHAINS ARE MISSING AT FEW PORTHOLES. DIA-300MM APPROX, No: 36. Port hole glass to be renewed [18 nos] |
| 248 | SCRAPPING, CLEANING AND PAINTING (02 COAT) OF GALLEY BILGES AREA L 5M X B 1M |
| 249 | SHAFT TUNNEL ENTRY HATCH COVER TO RENEW PROPER SEILING ARRANGEMENT WITH OPENING AND CLOSING LOCKING ARRANGEMENT |
| 250 | ENGINE ROOM TUBE LIGHT FITTINGS RUSTED AND BROKEN. TO BE RENEWED ALL FITTINGS, TUBE LIGHTS AND PROPER WIRING TO BE DONE AS PER STANDARD (2*20WATT,220V,LED LIGHT FITTING WITH MOUNTING BRACKET) |
| 251 | ALLEY WAY TUBE LIGHT FITTINGS BROKEN. TO BE RENEWED ALL FITTINGS, TUBE LIGHTS AND PROPER WIRING TO BE DONE AS PER STANDARD (AJMERA ,7218 CRONIC WELL DECORATIVE FITTING SUITABLE FOR LED 18W , 220V MADE FROM CRCA MS SHEET,DULY POWDER COATED WITH OPAL/CLEAR POLYCARBONATE DIFFUSER) |
| 252 | LIGTHING ARRANGEMENT (4 NOS) TO BE PROVIDED IN SHAFT TUNNEL SPACE. 4 EXPLOSION PROOF LED LIGHTS WITH 40W, 220V. TO BE PROVIDED. 300MTR WIRE ALSO TO BE SUPPLIED AND IWIRING TO BE DONE WITH PROPER SECURING ARRANGEMENT AND CONDUIT. . SWITCHES FOR EACH 4 TO BE PROVIDED |
| 253 | ALL DAMAGED MARINE SWITCHES AND SOCKETS TO RENEW WITH METAL SWITCHES AND SOCKETS. |
| 254 | ELECTRICAL PANEL TO RENEW WITH PROPER CLOSING & LOCKING ARRANGEMENT. |
| 255 | WATER BALLAST TANK (STBD) SOUNDING CAP CORRODED & JAMMED TO BE RENEWED. |
| 256 | BOTH SIDES FUNNEL EXHAUST TRUNK VENT FLAP DOOR COAMING (BOAT DECK) GOT CORRODED AND THINNED DOWN. LOUVER FRAME FITMENT IS DAMAGED. SAME TO BE CROP AND RENEW. |
| 257 | BOTH FUNNEL LADDERS RUSTED AND CORRODED, SAME TO BE RENEWED. LENGTH-40CM,BREADTH-20CM,THICKNESS-5CM THE ABOVE IS DIMENSION OF ONE STEP. TOTAL 40STEPS |
| 258 | VENT FLAPS AND COMPRESSION BAR AT 4 PLACES CORRODED, THIN DOWN AND WASTED SAME TO BE CROPPED AND RENEWED. VENT DIMENSION- LENGTH-40CMBREADTH-30CM |
| 259 | DECKS ENTRANCE TO THE SUPERSTRUCTURE DOORS SEALING AREA TO BE CHECKED AND CROP AND RENEW TO ENSURE THE PROPER SEALING OF DOOR |
| 260 | RESCUE BOAT DAVIT PORT SIDE BRAKE HANDLE TO BE RENEWED. RESCUE BOAT DAVIT ARMS PORT AND STBD - METAL PITTING AREAS TO BE REPAIRED. |
| 261 | BOTH BUNKERING DRIP TRAY PLUGS RUSTED AND CORRODED, SAME TO BE RENEWED WITH DRAIN PLUG AND SECURING CHAIN |
| 262 | BUOY HOLD SHAFT TUNNEL ST OIL TANK FILLING ARRANGEMENT AND SIGHT GLASS NEED TO BE PROVIDED |
| 263 | BUOY HOLD RACK SYSTEM NEED TO PROVIDE PARTITION FOR KEEPING SPARES |
| 264 | STEERING ROOM SAVEALL TRAY TO BE RENEWED(PORT SIDE P/P TRAY :L-25 inch, B-28 inch,H-4 inch) (STBD P/P TRAY :L-25.5 inch, B- 33 inch,H-4 inch) ,(TRAY BELOW THE VALVE PORT : L-26 inch, B- 23 inch,H-4 inch)(TRAY BELOW THE VALVE STBD : L-25.5 inch, B- 24 inch,H-4 inch ) |
| 265 | A-FRAME NEED PLATFORM ON TOP BOTH SIDES TO WORK ANY ELECTRICAL JOB (L-20FT ,B-2FT) CHUCKER PLATE:6mm |
| 266 | MAIN MAST NEED PLATFORM ON TOP TO WORK ANY ELECTRICAL JOB (L-20FT ,B-2FT) CHUCKER PLATE:6mm |
| 267 | RECTIFICATION OF DEFECTS - ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 268 | BOTH SIDES EMBARKATION LADDER STANCHION PIPE BASE AND LADDER SECURING EYE PLATE CORRODED AND THINNED DOWN.DIA-7CM |
| 269 | AFT MOORING ROLLERS 2NOS TO BE RENEWED. LOAD - 2TON |
| 270 | AIR LINE VALVES SPINDLE WHEEL DAMAGED. DIA-35CM,20NOS |
| 271 | FIRE LINE VALVES SPINDLE WHEEL BROKEN AND NEED TO REPLACED. DIA-35CM,3NOS |
| 272 | DEEP SEA WINCH FOUNDATION BASE PLATE THIN DOWN AND WASTED SAME TO BE FABRICATED AND RENEWED WITH NEW BOLT AND NUT. DEEP SEA WINCH BED THINNED DOWN AND HOLED. H-FRAME TO BE RENEWED. [Length:260cm, Thickness:2cm, Breadth:16cm- dimension of one frame]total 4 frames, total area is 180 m2 |
| 273 | DUCT KEEL AREA TRANSDUCER SENSOR WITH SEAL TO BE RENEWED. SATISFACTORY OPERATION OF THE SENSOR TO BE DEMONSTRATED AFTER THE COMPLETION OF JOB,FRAME NO:76-77 SPEED LOG . MODEL:FURUNO DS-80 |
| 274 | LAUNDRY ROOM DRAINS TO BE COVERED WITH PLATES [lenthg: 4 m, breadth: 10 cm, height: 10 cm] |
| 275 | RESCUE BOAT RESTING PAD FOUND DEFECTIVE SAME TO BE RENEWED WITH MARINE GRADE VINYL ,HDPE RUBBER. LENGTH-55CM, BREADTH-25CM |
| 276 | ACCOMMODATION STEPS EDGE ALUMINUM BEADINGS 10 NOS TO BE RENEWED.(L850MM X B 60MM ) |
| 277 | MONKEY DECK: (All inway jobs REQUIRED viz., removal and refit of ANTENNAS,CABLES, panel, etc. is under SHIPYARD SCOPE) ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 278 | WHEELHOUSE ROOF COAMING PLATE AT FWD, STBD AND PORT SIDE THINNED DOWN. SAME TO BE CROPPED AND RENEWED.6M-LENGTH, BREADTH 25CM,6CM-THICKNESS |
| 279 | BRIDGE DECK (All inway jobs REQUIRED viz., removal and refit of ANTENNAS, CABLES, panel, etc. is under SHIPYARD SCOPE) - ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 280 | W/H WING PORT SIDE SHEETS TO BE REMOVED, PAINTED, CLAMPS TO BE RENEWED. THINNED DOWN SUPPORTNG FRAMES TO BE CROP AND RENEW. DIA 50MM |
| 281 | FUNNEL DECK AREA ENGINE ROOM BLOWER TRUNK VENT COMPRESSION BAR FOUND CORRODED AND THINNED DOWN SAME TO BE CROPPED AND RENEWED. LENGTH-1M,BREADTH-1M |
| 282 | BRIDGE DECK AFT AHU ROOM NATURAL VENT FOUND CORRODED AND THINNED DOWN SAME TO BE RENEWED. LENGTH-1.3M, BREADTH-1M |
| 283 | WHEELHOUSE DECK PORT SIDE (AFT) NEAR VERTICAL LADDER LEADING TO MONKEY ISLAND MASHROOM VENT TRUNK BASE PLATE.CORRODED AND WASTED SAME TO BE CROPPED RENEWED |
| 284 | SART 2nos ( MAKE ACR PATHFINDER & SAILOR ) batteries (2nos) to be renewed. [Lithium Battery 11.5/5.5 V] |
| 285 | FORECASTLE DECK - ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 286 | BOSUN STORE BLOWER TO BE PURCHASED AND INSTALLED. ELECTRICAL CABLE, SOCKET, SWITCH ETC TO BE PURCHASED AND FITTED.(Dia.75M Body,head-1.7m,length-1.4m) |
| 287 | VENTILATION STARTER PANEL (STBD SIDE) BOX TO BE RENEWED. SUPPPORTS TO RENEWED. AND PAINTING TO BE DONE. LENTH-65CM,BREADTH-55CM |
| 288 | FORECASTLE DECK STBD NEAR CO2 ROOM ENTRANCE CONDUIT PIPE FOR ELECTRICAL CABLE FOUND DAMAGED SAME TO BE RENEWED. DIA-15CM, LENGTH-40CM |
| 289 | ACCOMMODATION (REQUIRED PANELS AND CABLES TO BE REMOVED AND REFITTED UNDER SHIP YARD SCOPE) - ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 290 | WHEEL HOUSE FLOOR VINYL SHEET TO BE RENEWED. JOB INCLUDED IF ANY GLUE OR COMPOUND IS REQUIRED FOR THE LAYING OF SHEET. LENGTH-15M,BREADTH-8M, Floor to be lavel using suitable deck compound |
| 291 | ACCOMODATION AREA, VARIOUS PLACES VINLY SHEET TO BE RENEWED WITH PROPER SURFCAE PREPARATION ON THE FLOOR WHICH INCLUDES FLOOR LEVELLING USING COMPOUND/PUTTY 2ND ADHESIVE FOR LAYING VINYL SHEET - AREA = 250M2 |
| 292 | ALL CABIN BATHROOM FLOOR AND PANELS EXCEPT CHIEF SCIENTIST CABIN TO BE RENEWED.(LENGTH-2M,BREADTH-2M APPROX). DAMAGED BATHROOM DOOR FRAMES TO BE RENEWED. DAMAGED BATHROOM FITTINGS LIKE HAND SHOWERS, TAPS, PIPES TO BE RENEWED. APPROX - 60 PCS |
| 293 | SEALING PANELS TO BE RENEWED. LARGE,30PCS - (LENGTH-1.8M,BREADTH-0.40M), SMALL 40PCS - (LENGTH 0.80M, BREADTH - 0.40M) |
| 294 | DAMAGED ACCOM SPACE BULKHEAD SIDE PANELS TO BE RENEWED. 250M2 |
| 295 | AC TRUNKING TO BE CHECKED AND RENEWED AS REQUIRED.(250MM*50M APPROX). |
| 296 | 3RD ENGINEER CABIN BATHROOM DOOR KEELS & FRAME NEED TO BE RENEWED 2 SQ METER |
| 297 | 2ND ENGINEER CABIN MAIN DOOR AND FRAME BOTTOM AREA THIN DOWN NEEDS TO BE REPAIRED. 2 SQ METER |
| 298 | LAUNDRY ROOM FLOOR DRAIN CHANNEL BADLY CORRODED SAME TO BE RENEWED. LENGTH-4M, BREADTH-10CM, HEIGHT-10CM |
| 299 | LAUNDRY ROOM BULKHEAD PORT SIDE PANEL SHEET CORRODED AND WASTED SAME TO BE RENEWED. LENGTH-3M, BREADTH-1.6M |
| 300 | ACCOM SPACE HAND RAIL TO BE RENEWED. LENGTH 5MTR,WIDTH-5CM,THICKNESS-1CM |
| 301 | CREW BATHROOM WASH BASINS 2NOS ALONG WITH STAND TO BE RENEWED WITH PROPER DRAIN ARRANGEMENTS. |
| 302 | CHIEF SCIENTIST CABIN ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 303 | CHIEF SCIENTIST CABIN FRIDGE NOT WORKING SAME TO BE RENEWED. APPROX CAPACITY 130L SINGLE DOOR |
| 304 | CHIEF SCIENTIST CABIN BATHROOM DRAIN LINE LEAKING AND THE LOCATION OF LEAK IS NOT VISIBLE. SO EITHER LEAK TO BE ARRESTED BY IDENTIFYING THE SOURCE (MAY REQUIRE TO CUT THE PLATE BELOW THE BATHROOM) OR PROVIDE A NEW DRAIN LINE AND CONNECT THE SAME TO THE SHIP DRAIN SYSTEM. |
| 305 | GALLEY & MESS ROOM - ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 306 | TWO NUMBERS OF FRIDGES TO BE SUPPLIED of reputed make. APPROX CAPACITY - 300-325L DOUBLE DOOR,220V/50HZ,HEIGHT-160CM TO 175CM WIDTH-60CM TO 68CM,DEPTH 65CM TO 72 CM |
| 307 | CREW MESSROOM WASH BASIN TAPS -2 NOS TO FITTED WITH NEW ONE(DIA-3CM APPROX) |
| 308 | GALLEY WASH BASIN,TAPS TO be FITTED WITH NEW ONE (DIA-3CM APPROX). Wooden shelf below wash basin to be renewed with adequate support [area: 1.5m x 2m] |
| 309 | Galley AC ducts not working. Same to be identified and rectified. |
| 310 | FRIDGE ROOMMEAT ROOM AND VEGETABLE ROOM FLOOR TILES TO BE RENEWED. VEG ROOM- LENGTH-3M, BREADTH-2M. MEAT ROOM. LENGTH-2.6M, BREADTH-1.6M |
| 311 | Total Fumigation [Complete Conventional Fumigations]After completion of dry dock repair fumigation of entire ship accommodation to be carried out. All electronic equipment to be shifted to safe place with proper covering and shifted back to position and fixing after fumigation. Security guards to be provided throughout the period of fumigation. All vents and doors to be sealed to avoid any leakage of gases. All labs wheel house and radio rooms etc. to be sealed properly prior to gas release. Warning placards to be placed in where ever necessary safety measures to be taken prior release of gas and head counts of fumigation staff to be taken and reported master. after completion of fumigation all debris including dead rats to be removed and proper cleaning of accommodation to be carried out. All Scientific Equipment in the Labs UPS Room including Computers, Displays are required to be protected using Tarpaulin to prevent damages/ malfunctioning., Refer GA plan.On completion of Fumigation, arrange for Ship Sanitation Certificate to be issued by Port Health Officer |
| 312 | TRANSPORTATION DURING NON- OPERATION OF GALLEY/MESSSHIPYARD SHALL PROVIDE NECESSARY TRANSPORT (18 NOS OF OFFICERS/CREWS) OF ACCEPTABLE STANDARDS FOR SHIP’S CREW / OFFICERS DURING THE PERIOD OF NON-OPERATION OF GALLEY AND FUMIGATION FROM HOTEL TO SHIPYARD AND RETURN.NO. OF CREW: 19 |
| 313 | A. SHIPYARD SHALL PROVIDE LOCAL TRANSPORTATION ARRANGEMENT [DEDICATED ONE CAR-TYPE SUV] FOR NIOT REPRESENTATIVES DURING THE DRY-DOCKING AND AFLOAT REPAIR. |
| 314 | B. AN AIR-CONDITIONED OFFICE SPACE TO BE PROVIDED TO NIOT REPRESENTATIVE WITH COMPUTER, PRINTER, INTERNET FACILITY, TELEPHONE WITH STD FACILITY IN THE SHIPYARD PREMISES DURING THE ENTIRE PERIOD OF DRY-DOCKING AND AFLOAT REPAIR |
| 315 | C. DECENT ACCOMMODATION WITH WIFI FACILITY TO BE ARRANGED FOR NIOT REPRESENTATIVES (2 PERSONS) FOR THE ENTIRE DRY DOCKING PERIOD. |
| 316 | TRANSPORTATION TO BE PROVIDED FROM AIRPORT/RAILWAY STATION TO SHIPYARD AND VICE VERSA FOR NIOT /MOES/TFEC OFFICIALS AS WHEN REQUIRED. APPROX. 6 ROUND TRIPS OF 4 SUV TYPE VEHICLE. HOWEVER PAYMENT WILL BE MADE ON PRO-RATE BASIS FOR ANY EXTRA USAGE. |
| 317 | LIAISON WITH IRS/MMD AND VISITS AS REQUIRED SHALL BE ARRANGED BY SHIP YARD AT EVERY STAGE TO COMPLETE THE RENEWAL DOCKING SURVEY, CONTINOUS SURVEY OF MACHINERIES, AND SURVEYS RELATED TO RENEWAL OF ALL STATUATORY AS WELL AS CLASS CERTIFICATES AND THEIR ACCOUNTS TO BE SETTLED BY THE YARD.SCOPE OF THE WORK INVOLVES: LIAISE WITH IRS/MMD SURVEYOR AT EVERY STAGE TO WITNESS THE DOCKING SURVEY. IRS/MMD SURVEYOR TO BE LINED UP FOR THE SEA TRAIL TO WITNESS THE SUCCESSFUL SEA TRAIL.NECESSARY FEES FOR THE DOCKING SURVEY TO BE PAID AND SETTLED BY SHIPYARD |
| 318 | Sea Trial:After dry docking and on completion of all repairs of machinery and equipment, sea trial to be arranged by the shipyard to ensure / test of all machineries, Scientific equipment and navigation and communication equipment. Estimated for fullest capacity trial in required water depth of 500 m along with the OEM's / OEM authorised engineer participation as per tender specification to qualify all equipments and machineries. |
| 319 | ENGINE SIDE |
| 320 | RUDDER AND RUDDER STOCK [PORT AND STARBOARD]SCOPE OF WORK INVOLVES:ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 321 | · STAGING TO BE ARRANGED FOR TAKING CLEARANCES, INSPECTION, AND RUDDER PRESSURE TEST (4M X 4M X 2M HEIGHT CAGE TYPE) |
| 322 | · BOTH RUDDERS DROP, JUMPING CLEARANCES AND PROPELLER DROP TO BE MEASURED AND RECORDED |
| 323 | · DRAIN PLUGS (4 NO’S) TO BE REMOVED FOR CHECKING ANY INGRESS OF WATER. AFTER COMPLETION OF WORK, SAME TO BE FITTED BACK AND CEMENTED. |
| 324 | · IF ANY INGRESS OF WATER NOTED, LEAKS TO BE RECTIFIED AND RUDDER TO BE PRESSURE TESTED TO 0.25KG/CM2 |
| 325 | · INTERNAL FLOAT - COAT TO BE GIVEN (OIL UNDER THE SCOPE OF SHIPYARD SUPPLY) |
| 326 | PORT & STBD PROPELLERS,PROPELLER'S SHAFTTWIN SCREW, FIXED PITCH.(PROPELLER DIA-2000MM, SHAFT DIA-180MM) 2 NOS.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 327 | 4. P & S PROPELLER BLADES, STERN THRUSTER BLADES, BOW THRUSTER BLADES, TAIL SHAFT AND SHAFT CONE DYE PENETRANT TEST TO BE CARRIED OUT IN PRESENCE OF IRS SURVEYOR.. REPAIRS IF ANY TO BE DONE AS PER THE DP TEST RESULT. |
| 328 | CLEANING OF SEA CHEST AND STRAINER SCOPE OF THE WORK:ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 329 | · REMOVAL & REFITTING OF MUD BOX AFTER PAINTING WITH SUITABLE EPOXY COAT (150 NB) |
| 330 | · REMOVAL & REFITTING OF MUD BOX AFTER PAINTING WITH SUITABLE EPOXY COAT (80 NB) |
| 331 | · INTERNAL TO BE CLEANED THOROUGHLY |
| 332 | · STRAINER (280 X 300 MM2), MATERIAL: SS 316 TO BE REMOVED, CLEANED AND FILTER CASING CLEANED, EPOXY COAT TO BE GIVEN. |
| 333 | · STRAINER (150 X 400 MM2), MATERIAL: SS316 TO BE REMOVED, CLEANED AND FILTER CASING CLEANED, EPOXY COAT TO BE GIVEN. |
| 334 | · GRATING COVERS TO BE OPENED AND CLEANED (SEACHEST & THRUSTER) SCRAPING, CLEANING, BLASTING, PAINTING & REFITTING. RENEWAL OF SS FASTENERS & WIRE LASHING TO THE SATISFACTION OF IRS SURVEYORGRATING SIZE - 780 X 440 X 10 (4NOS), 720 X 380 X 10 (4NOS) |
| 335 | · ANODES TO BE RENEWED (250 MM X 125 MM X 40 MM), (AL. ALLOY ANODES, WEIGHT-2.505 KG) |
| 336 | · ANODES TO BE RENEWED INTERNAL SURFACE TO BE PAINTED AS PER UNDER WATER PAINTING SCHEME. 8 NOS |
| 337 | OVERHAUL OF SEA VALVESSCOPE OF WORK INVOLVES:· FOLLOWING SEA VALVES (GLOBE/GATE TYPE) TO BE OPENED, CLEANED, VALVE AND SEAT TO BE GROUND. VALVE TO BOX UP WITH NEW JOINT AND PACKING. INTERNALS OF THE VALVE BODY TO BE COATED WITH PAINT. CONSIDER OVERHAULING TO BE DONE IN SITU. IF ANY VALVE IS REQUIRED TO BE RENEWED, SAME TO BE SUPPLIED BY THE SHIP YARD WITH CLASS APPROVED.· OVERHAULING OF VALVES INVOLVES PRESSURE TESTING (6 BAR SEAT SIDE AND STORM VALVE GRAVITY TEST) TO SURVEYORS’ SATISFACTION. [10 % VALVES ARE CONSIDERED FOR REPLACEMENT]. ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 338 | 1. SEA CHEST SW SUCTION ISOLATING V/V GLOBE DIA –150 NB, SDNR |
| 339 | 2. SEA CHEST SW SUCTION ISOLATING V/V GATE DIA –150 NB |
| 340 | 3. AUX S.W.SUCTION ISOLATING V/V GLOBE DIA- 100 NB SDNR |
| 341 | 4. AUX S.W.SUCTION ISOLATING V/V GATE DIA- 100 NB |
| 342 | 5. AUX S.W.SUCTION ISOLATING V/V GATE DIA- 80 NB (AE INLET) |
| 343 | 6. VENT VALVE ANGLE - 50 NB SDNR |
| 344 | 7. NON-RETURN VALVE - 15 NB |
| 345 | OVERHAUL OF OVERBOARD VALVESSCOPE OF WORK INVOLVES:· FOLLOWING OVERBOARD VALVES TO BE OPENED, CLEANED, VALVE AND SEAT TO BE GROUND. VALVE TO BOX UP WITH NEW JOINT AND PACKING. INTERNALS OF THE VALVE BODY TO BE COATED WITH PAINT. CONSIDER OVERHAULING TO BE DONE IN SITU. IF ANYVALVE IS REQUIRED TO BE RENEWED, SAME TO BE SUPPLIED BY THE SHIP YARD WITH CLASS APPROVED.· OVERHAULING OF VALVES INVOLVES PRESSURE TESTING (6 BAR SEAT SIDE AND STORM VALVE GRAVITY TEST) TO SURVEYORS’ SATISFACTION. [20 % VALVES ARE CONSIDERED FOR REPLACEMENT]. ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 346 | 1. ME / AE SEA WATER DISCHARGE OVERBOARD [TYPE: GLOBE, DIAMETER: 100 MM] – PORT SIDE |
| 347 | 2. BALLAST / EMERGENCY FIRE PUMP DISCHARGE OVERBOARD [TYPE: GLOBE, DIAMETER: 80 MM] – PORT SIDE |
| 348 | 3. OILY WATER SEPARATOR DISCHARGE OVERBOARD [TYPE: GLOBE, DIAMETER: 40 MM] – PORT SIDE |
| 349 | 4. A/C CONDENSER SEA WATER OVERBOARD [TYPE: GLOBE, DIAMETER: 125 MM] – STARBOARD SIDE |
| 350 | 5. WASTE WATER/SCUPPER DRAIN O/B STORM V/V 50NB |
| 351 | 6. GREY WATER DRAIN O/B STORM V/V 125NB |
| 352 | 7. BLACK WATER OVER BOARD STORM V/V 150NB |
| 353 | MAIN SEA CHEST PIPES TO BE REMOVED FROM PLACE, INTERNAL AREA TO BE CLEANED AND GAUGED (THINNED DOWN PIPES TO BE RENEWED AS PER SURVEYOR SATISFACTION) PRESSURE TESTED, INTERNALS TO BE PAINTED AS PER PAINTING SCHEME AND FITTED BACK WITH NEW JOINTS, BOLT AND NUTS WITH WASHER. AND PROPER CLAMPING ARRANGEMENT.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 354 | 1.SEA TUBE 150NB TO BE REMOVED CLEANED, PR. TESTED AND FITTING BACK. |
| 355 | 2.SEA TUBE 80NB TO BE REMOVED CLEANED, PR. TESTED AND FITTING BACK.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 356 | FOLLOWING VALVES TO BE RENEWED AS PER SIZE- SAMPLES (VALVES YARD SUPPLY) AS PER THE SATISFACTION OF IRS CLASS.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 357 | OWS F/W FILLING GLOBE VALVE 1/2INCH V/V TO BE RENEWED |
| 358 | WASTE/ W P/P(TANK INSIDE) FOOT V/V TO BE FITTED |
| 359 | ER WASH BASIN (304 STAINLESS STEEL WASH BASIN (GLOSSY FINISH 18INCH*12INCH) TO BE RENEWED ALONG WITH THE SUPPORTING BRACKETS. PROPER DRAIN LINE TO BE ARRANGED 3MTRS APPROX . |
| 360 | MAIN ENGINES (PORT & STBD) [Make: CATERPILLAR 3508B ] - AS PART OF THE CONTINUOUS SURVEY BY IRS, THE FOLLOWING COMPONENTS ARE TO BE OPENED UP AND OVERHAULED BY THE OEM, INCLUDING RENEWAL OF NECESSARY SPARES. SATISFACTORY RUNNING TRIALS TO BE CONDUCTED IN PRESENCE OF IRS SURVEYOR. ALL WORK IS TO BE CARRIED OUT UNDER IRS SURVEY AND COMPLETED TO THE SATISFACTION OF THE ATTENDING SURVEYOR. CYLINDER HEAD, PISTON, CON ROD, CRANK PIN BEARING & WEBS, VALVES, GEARS, MAIN JOURNAL AND BEARING, FUEL INJECTORS, FO INJECTION PUMP AND PIPING, EXHAUST MANIFOLD PIPING & INSULATION, CRANKCASE DOORS AND RELIEF VALVES, CRANKSHAFT ALLIGNMENT, VIBRATION DAMPERS, CAMSHAFT & DRIVE, BED PLATE, FRAMES, TIE-RODS, HOLDING DOWN BOLTS & CHOCKS, SUPERCHARGERS, ATTACHED AIR COOLER, ATTACHED SW PUMP, ATTACHED LO PUMP, ATTACHED FW PUMP, ATTACHED DO BOOSTER PUMP, & COUPLINGS. Only spares will be arrange by NIOT. ALL OTHER MATERIALS/CONSUMABLES REQUIRED FOR THE below JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 361 | MAIN ENGINES FULL OVERHAULING INCLUDING SENSORS HEALTH CHECK AND RENEWAL IS REQUIRED, CABLES TO BE CHECKED AND RENEW IF REQUIRED, CABLES TO BE PROVIDED WITH PROPER HEAT INSULATION AND CONDUITS. |
| 362 | ME PARAMETERS DISPLAY UNIT IN ECR TO BE RENEWED. |
| 363 | MAIN ENGINE PORT, MAKE :CATERPILLAR 3508B ENGINE MAJOR OVERHAULING JOB TO BE CARRIED OUT BY OEM/AUTORISED SERVICE ENGINEER(GMMCO), AND SUCCESSFUL RUNNING TRIAL TO BE SHOWN TO IRS CLASS, SHIP STAFF. OEM SERVICE ENGINEER TO BE ARRANGED BY SHIPYARD TO COMPLETE THE ENTIRE SCOPE OF WORK. |
| 364 | 1. MAJOR OVERHAUL ROUTINE TO BE CARRIED OUT. |
| 365 | 2.ALL 08 NOS CYL. HEADS, EXH MANIFOLD, INLET MANIFOLD, TURBOCHARGER, FUEL INJECTORS,C/CASE RELIEF VALVE,ROCKER ARM ASSY & ALL ASSOCIATED CONNECTIONS TO BE REMOVED AND O'HAULED |
| 366 | 3.ALL FUEL INJECTORES TO BE OVERHAULED [8 NOS] |
| 367 | 4.AIR COOLER, LO COOLER TO BE REMOVED FROM PLACE AND TO BE TAKEN TO W/SHOP. BOTH AIR AND FRESH WATER SIDE TO BE CLEANED CHEMICALLY. PRESSURE TESTED AND SHOWN TO SURVEYOR. |
| 368 | 5.EXAUST MANIFOLD INSULATION TO BE RENEWED WHERE EVER REQUIRED |
| 369 | 6. AIR STARTING MOTOR TO BE SERVICED AND SOLINOID VALVE NOT WORKING IN AUTO SAME TO BE RECTIFIED. |
| 370 | 7. ALL RUBBER HOSES AND RUBBER BELLOWS TO BE RENEWED |
| 371 | 7. ENGINE LOCAL DISPLAY UNIT NOT WORKING SAME TO BE RENEWED. |
| 372 | 8.. PORT MAIN ENG SEA WATER AND FRESH WATER PUMP TO REMOVED, SERVICED, AND FITTED BACK WTH NEW SEALS AND BEARINGS. [2 NOS] |
| 373 | 9. PORT ME F.W. COOLER TO BE REMOVED FROM PLACE AND TAKEN TO W/SHOP. BOTH F/W AND SEA WATER SIDE CHEMICALY CLEANED, PRESSURE TESTED AND SHOWN TO SURVEYOR AND SHIP STAFF. CAP. 500 M3 TUBE TYPE |
| 374 | 10.BOTH TURBOCHARGER TO BE OVERHAULED AND NECESSARY SPARES TO BE RENEWED.(AIR FILTER AND FELT FILTERS TO BE RENEWED) [2 NOS] |
| 375 | 11. F.O INLET AND RETURN LINE HOSE TO BE RENEWED |
| 376 | 12. ENGINE L.O TO BE FLUSHED AND RENEWED |
| 377 | 13.L.O FILTERS TO BE RENEWED [5 NOS] |
| 378 | 14.F.O FILTERS TO BE RENEWED [7 NOS] |
| 379 | MAIN ENGINE STBD, MAKE :CATERPILLAR 3508B ENGINE MAJOR OVERHAULING JOB TO BE CARRIED OUT BY OEM/AUTORISED SERVICE ENGINEER(GMMCO), AND SUCCESSFUL RUNNING TRIAL TO BE SHOWN TO IRS CLASS, SHIP STAFF. OEM SERVICE ENGINEER TO BE ARRANGED BY SHIPYARD TO COMPLETE THE ENTIRE SCOPE OF WORK. Only spares will be arrange by NIOT. ALL OTHER MATERIALS/CONSUMABLES REQUIRED FOR THE below JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 380 | 1. MAJOR OVERHAUL ROUTINE TO BE CARRIED OUT. |
| 381 | 2.ALL 08 NOS CYL. HEADS,EXH MANIFOLD,INLET MANIFOLD,TURBOCHARGER,FUEL INJECTORS,C/CASE RELIEF VALVE,ROCKER ARM ASSY & ALL ASSOCIATED CONNECTIONS TO BE REMOVED AND O'HAULED |
| 382 | 3.ALL FUEL INJECTORES TO BE OVERHAULED [8 NOS] |
| 383 | 4.AIR COOLER, LO COOLER TO BE REMOVED FROM PLACE AND TO BE TAKEN TO W/SHOP. BOTH AIR AND FRESH WATER SIDE TO BE CLEANED CHEMICALLY. PRESSURE TESTED AND SHOWN TO SURVEYOR. |
| 384 | 5.EXAUST MANIFOLD INSULATION TO BE RENEWED WHERE EVER REQUIRED. |
| 385 | 6. AIR STARTING MOTOR TO BE SERVICED AND SOLINOID VALVE NOT WORKING IN AUTO SAME TO BE RECTIFIED. |
| 386 | 7. ENGINE LOCAL DISPLAY UNIT NOT WORKING SAME TO BE RENEWED. |
| 387 | 8.. STBD MAIN ENG SEA WATER AND FRESH WATER PUMP TO REMOVED, SERVICED, NECESSARY SPARES TO BE RENEWED AND FITTED BACK. |
| 388 | 9. STBD ME F.W. COOLER TO BE REMOVED FROM PLACE AND TAKEN TO W/SHOP. BOTH F/W AND SEA WATER SIDE CHEMICALY CLEANED, PRESSURE TESTED AND SHOWN TO SURVEYOR AND SHIP STAFF. CAP. 500 M3 TUBE TYPE |
| 389 | 10.BOTH TURBOCHARGER TO BE OVERHAULED AND NECESSARY SPARES TO BE RENEWED.(AIR FILTER AND FELT FILTERS TO BE RENEWED) [2 NOS] |
| 390 | 11. F.O INLET AND RETURN LINE HOSE TO BE RENEWED |
| 391 | 12. ENGINE L.O TO BE FLUSHED AND RENEWED |
| 392 | 13.L.O FILTERS TO BE RENEWED [5 NOS] |
| 393 | 14.F.O FILTERS TO BE RENEWED [7 NOS] |
| 394 | Gear Box (PORT & STBD) - AS PART OF THE CONTINUOUS SURVEY BY IRS, THE FOLLOWING COMPONENTS ARE TO BE OPENED UP AND OVERHAULED BY THE OEM, INCLUDING RENEWAL OF NECESSARY SPARES. ALL WORK IS TO BE CARRIED OUT UNDER IRS SURVEY AND COMPLETED TO THE SATISFACTION OF THE ATTENDING SURVEYOR. - PINIONS, WHEELS, SHAFTS, COUPLINGS, CLUTCHES, BEARINGS, ATTACHED LO PUMPS, ATTACHED LO COOLERS, FOUNDATION BOLTS & CHOCKS. Only spares will be arrange by NIOT. ALL OTHER MATERIALS/CONSUMABLES REQUIRED FOR THE below JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 395 | PORT MAIN ENGINE GEAR BOX, MODEL MGN90BL. MAKE TWIN DISK NICO CO LTD SUCCESSFUL RUNING TRIAL TO BE SHOWN TO IRS CLASS, SHIP STAFF. OEM SERVICE ENGINEER TO BE ARRANGED BY SHIPYARD TO COMPLETE THE ENTIRE SCOPE OF WORK.ONLY SPARES WILL BE ARRANGED BY NIOT. ALL MATERIAL/CONSUMABLES/OIL, ETC. REQUIRED FOR THE JOBS ARE UNDER THE SCOPE OF SHIP YARD |
| 396 | 1. FULL OVERHAULING OF GEAR BOX |
| 397 | 2. M/E GEAR BOX L. O COOLER TO BE OPENED, CHEMICALLY CLEANED, PRESSURE TESTED AND SHOWN TO IRS SURVEYOR/SHIP STAFF. |
| 398 | 3. GEAR BOX PRESSURE GAUGES TO BE RENEWED (RANGE 0 TO 3.5 MPA-1NO, AND 0 TO 1 MPA-1NO) [2 NOS] |
| 399 | 4. GEAR BOX OIL TO BE FLUSHED AND RENEWED |
| 400 | STBD MAIN ENGINE GEAR BOX, MODEL MGN90BL. MAKE TWIN DISK NICO CO LTD SUCCESSFUL RUNNING TRIAL TO BE SHOWN TO IRS CLASS, SHIP STAFF. OEM SERVICE ENGINEER TO BE ARRANGED BY SHIPYARD TO COMPLETE THE ENTIRE SCOPE OF WORK.ONLY SPARES WILL BE ARRANGED BY NIOT. ALL MATERIAL/CONSUMABLES/OIL, ETC. REQUIRED FOR THE JOBS ARE UNDER THE SCOPE OF SHIP YARD |
| 401 | 1. FULL OVERHAULING OF GEAR BOX |
| 402 | 2. M/E GEAR BOX L. O COOLER TO BE OPENED, CHEMICALLY CLEANED, PRESSURE TESTED AND SHOWN TO IRS SURVEYOR/SHIP STAFF. |
| 403 | 3. GEAR BOX PRESSURE GAUGES TO BE RENEWED (RANGE 0 TO 3.5 MPA-1NO, AND 0 TO 1 MPA-1NO) [2 NOS] |
| 404 | 4. GEAR BOX OIL TO BE FLUSHED AND RENEWED |
| 405 | AUXILIARY ENGINES (PORT, CENTRE & STBD) - AS PART OF THE CONTINUOUS SURVEY BY IRS, THE FOLLOWING COMPONENTS ARE TO BE OPENED UP AND OVERHAULED BY THE OEM, INCLUDING RENEWAL OF NECESSARY SPARES.SATISFACTORY RUNNING TRIALS TO BE CONDUCTED IN PRESENCE OF IRS. ALL WORK IS TO BE CARRIED OUT UNDER IRS SURVEY AND COMPLETED TO THE SATISFACTION OF THE ATTENDING SURVEYOR. CYLINDER HEAD, LINER, PISTON, CON ROD, CRANKPIN BEARING, MAIN JOURNAL AND BEARING, INJECTORS, ATTACHED FO PUMP, HP PIPES, EXHAUST MANIFOLD PIPING & INSULATION, CRANKCASE DOORS & RELIEF VALVES, FOUNDATION BOLTS & CHOCKS, ATTACHED SW PUMP, ATTACHED FW PUMP, ATTACHED LO PUMP ETC. ONLY SPARES WILL BE ARRANGED BY NIOT. ALL MATERIAL/CONSUMABLES/OIL, ETC. REQUIRED FOR THE JOBS ARE UNDER THE SCOPE OF SHIP YARD |
| 406 | A/E MAKER CATERPILLER 3406CA/E # 1 MAJOR/FULL OVERHAULING TO BE CARRIED OUT BY OEM (GMMCO),. MAKER : CATERPILLAR 3406C ALL SPARES REQUIRED FOR OVERHAULING/SERVICE WILL BE SUPPLIED BY NIOTONLY SPARES WILL BE ARRANGED BY NIOT. ALL MATERIAL/CONSUMABLES/OIL, ETC. REQUIRED FOR THE JOBS ARE UNDER THE SCOPE OF SHIP YARD |
| 407 | MAJOR OVERHAULING TO BE CARRIED OUT AND SATISFACTORY TRIAL TO BE SHOWN TO IRS SURVEYOR AND SHIP STAFF. IN ADDTION TO MAJOR OVERHAULING, FOLLOWING ALSO TO BE CARRIED OUT |
| 408 | 1. S/W PUMP TO BE RENEWED.(IMPELLER, SHAFT, SEALS ETC) |
| 409 | 2. F/W PUMP TO BE SERVICED AND NECESSARY SPARES TO BE RENEWED. |
| 410 | 3. F.O PUMP WITH GOVERNER TO BE SERVICED AND NECESSARY SPRES TO BE RENEWED |
| 411 | 4. ENGINE VALVE LASH INSPECT AND ADJUST |
| 412 | 5. F. W & L.O COOLER TO BE CHEMICALLY CLEANED AND PR. TESTED AND SHOWN TO SURVEYOR [2 NOS] |
| 413 | 6. COOLING SYSTEM WATER TEMP. REGULATOR REPLACE AND COOLANT TO BE RENEWED |
| 414 | 7. ALL ALARMS AND TRIPS TO BE CHECKED, DEFECTIVE SENSORS AND CORDS TO BE RENEWED, AND SUCCESSFUL RUNNING TRIAL TO BE SHOWN TO SHIP STAFF. |
| 415 | 8. FUEL SHUT OF SOLENOID VALVE TO BE RENEWED [2 NOS] |
| 416 | 9. AIR STARTING MOTOR TO BE SERVICED AND NECESSARY PARTS TO BE RENEWED RUNNING TRIAL TO BE SHOWN. |
| 417 | 10. TACHOMETER, L.O PRESSURE GAUGE, AND F.O PRESSURE GAUGE TO BE RENEWED [3 NOS] |
| 418 | 12. F.O HOSE AND PRIMARY FILTER ELEMENT TO BE RENEWED. [2 NOS] |
| 419 | 13. T/C TO BE OVERHAULED/INSPECTED, AND AIR FILTER AND FELT FILTER TO BE RENEWED |
| 420 | 14. ENGINE V/V ROTATOR TO INSPECT |
| 421 | 15. FUEL INJECTION NOZZLES -TEST/RENEW [6 NOS] |
| 422 | 16. CRANK SHAFT VIBRATION DAMPER TO BE INSPECTED |
| 423 | 17. LUBE OIL TO BE FLUSHED AND FILLED |
| 424 | 18. LUBE OIL AND FUEL OIL FILTER TO BE RENEWED [2 NOS] |
| 425 | 19. EXPANSION TANK TO BE CLEANED AND LEVEL FLOAT SWITCH TO BE REPAIRED/RENEWED WITH HOSE |
| 426 | 20. COOLER (COOLANT) IN AND OUT PIPELINES TO BE RENEWED DIA 3\\" INCH [3 NOS] |
| 427 | A/E MAKER CATERPILLER 3406CA/E # 2 MAJOR/FULL OVERHAULING TO BE CARRIED OUT BY OEM (GMMCO),. MAKER : CATERPILLAR 3406C ALL SPARES REQUIRED FOR OVERHAULING/SERVICE WILL BE SUPPLIED BY NIOTONLY SPARES WILL BE ARRANGED BY NIOT. ALL MATERIAL/CONSUMABLES/OIL, ETC. REQUIRED FOR THE JOBS ARE UNDER THE SCOPE OF SHIP YARD |
| 428 | MAJOR OVERHAULING TO BE CARRIED OUT AND SATISFACTORY TRIAL TO BE SHOWN TO IRS SURVEYOR AND SHIP STAFF. IN ADDTION TO MAJOR OVERHAULING, FOLLOWING ALSO TO BE CARRIED OUT |
| 429 | 1. S/W PUMP TO BE RENEWED (IMPELLER, SHAFT, SEALS ETC) |
| 430 | 2. F/W PUMP TO BE SERVICED AND NECESSARY SPARES TO BE RENEWED. |
| 431 | 3. F.O PUMP WITH GOVERNER TO BE SERVICED AND NECESSARY SPRES TO BE RENEWED |
| 432 | 4. ENGINE VALVE LASH INSPECT AND ADJUST |
| 433 | 5. F. W & L.O COOLER TO BE CHEMICALLY CLEANED AND PR. TESTED AND SHOWN TO SURVEYOR [2 NOS] |
| 434 | 6. COOLING SYSTEM WATER TEMP. REGULATOR REPLACE AND COOLENT TO BE RENEWED |
| 435 | 7. ALL ALARMS AND TRIPS TO BE CHECKED, DEFECTIVE SENSORS AND CORDS TO BE RENEWED, AND SUCCESSFUL RUNNING TRIAL TO BE SHOWN TO SHIP STAFF. |
| 436 | 8. FUEL SHUT OF SOLINOID VALVE TO BE RENEWED [2 NOS] |
| 437 | 9. AIR STARTING MOTOR TO BE SERVICED AND NECESSARY PARTS TO BE RENEWED RUNNING TRIAL TO BE SHOWN. |
| 438 | 10. TACHOMETER, L.O PRESSURE GAUGE, AND F.O PRESSURE GAUGE TO BE RENEWED [3 NOS] |
| 439 | 12. F.O HOSE AND PRIMARY FILTER ELEMENT TO BE RENEWED [2 NOS] |
| 440 | 13. T/C TO BE OVERHAULED/INSPECTED, AND AIR FILTER AND FELT FILTERTO BE RENEWED |
| 441 | 14. ENGINE V/V ROTATOR TO INSPECT |
| 442 | 15. FUEL INJECTION NOZZLES -TEST [6 NOS] |
| 443 | 16. CRANK SHAFT VIBRATION DAMPER TO BE INSPECTED |
| 444 | 17. LUBE OIL TO BE FLUSHED AND FILLED |
| 445 | 18. LUBE OIL AND FUEL OIL FILTER TO BE RENEWED [2 NOS] |
| 446 | 19. EXPANSION TANK TO BE CLEANED AND LEVEL FLOAT SWITCH TO BE RENEWED WITH HOSE |
| 447 | 20. COOLER (COOLANT) IN AND OUT PIPELINES TO BE RENEWED (DIA 3\\" INCH) [3 NOS] |
| 448 | A/E MAKER CATERPILLER 3406CA/E # 3 MAJOR/FULL OVERHAULING TO BE CARRIED OUT BY OEM (GMMCO),. MAKER : CATERPILLAR 3406C ALL SPARES REQUIRED FOR OVERHAULING/SERVICE WILL BE SUPPLIED BY NIOTONLY SPARES WILL BE ARRANGED BY NIOT. ALL MATERIAL/CONSUMABLES/OIL, ETC. REQUIRED FOR THE JOBS ARE UNDER THE SCOPE OF SHIP YARD |
| 449 | MAJOR OVERHAULING TO BE CARRIED OUT AND SATISFACTORY TRIAL TO BE SHOWN TO IRS SURVEYOR AND SHIP STAFF. IN ADDTION TO MAJOR OVERHAULING, FOLLOWING ALSO TO BE CARRIED OUT |
| 450 | 1. S/W PUMP TO BE RENEWED |
| 451 | 2. F/W PUMP TO BE SERVICED AND NECESSARY SPARES TO BE RENEWED. |
| 452 | 3. F.O PUMP WITH GOVERNER TO BE SERVICED AND NECESSARY SPRES TO BE RENEWED |
| 453 | 4. ENGINE VALVE LASH INSPECT AND ADJUST |
| 454 | 5. F. W & L.O COOLER TO BE CHEMICALLY CLEANED AND PR. TESTED AND SHOWN TO SURVEYOR [2 NOS] |
| 455 | 6. COOLING SYSTEM WATER TEMP. REGULATOR REPLACE AND COOLENT TO BE RENEWED |
| 456 | 7. ALL ALARMS AND TRIPS TO BE CHECKED, DEFECTIVE SENSORS AND CORDS TO BE RENEWED, AND SUCCESSFUL RUNNING TRIAL TO BE SHOWN TO SHIP STAFF. |
| 457 | 8. FUEL SHUT OF SOLINOID VALVE TO BE RENEWED [2 NOS] |
| 458 | 9. AIR STARTING MOTOR TO BE SERVICED AND NECESSARY PARTS TO BE RENEWED RUNNING TRIAL TO BE SHOWN. |
| 459 | 10. TACHOMETER, L.O PRESSURE GAUGE, AND F.O PRESSURE GAUGE TO BE RENEWED [3 NOS] |
| 460 | 12. F.O HOSE AND PRIMARY FILTER ELEMENT TO BE RENEWED [2 NOS] |
| 461 | 13. T/C TO BE OVERHAULED/INSPECTED, AND AIR FILTER AND FELT FILTER TO BE RENEWED |
| 462 | 14. ENGINE V/V ROTATOR TO INSPECT |
| 463 | 15. FUEL INJECTION NOZZLES -TEST [6 NOS] |
| 464 | 16. CRANK SHAFT VIBRATION DAMPER TO BE INSPECTED |
| 465 | 17. LUBE OIL TO BE FLUSHED AND FILLED |
| 466 | 18. LUBE OIL AND FUEL OIL FILTER TO BE RENEWED [2 NOS] |
| 467 | 19. EXPANSION TANK TO BE CLEANED AND LEVEL FLOAT SWITCH TO BE RENEWED WITH HOSE |
| 468 | 20. COOLER (COOLANT) IN AND OUT PIPELINES TO BE RENEWED (DIA 3\\" INCH) [3 NOS] |
| 469 | FO SAMPLING POINTS WITH DIP TRAY TO BE PROVIDED ON SERVICE TANKS OUTLET LINE, AND AFTER THE FILTER OUTLET OF EACH MAIN ENGINES AND AUX ENGINES. TOTAL 7 NOS. BEFORE THE WORK, THE DRAWINGS WITH MATERIAL DETAILS TO BE SUBMITTED TO IRS FOR THE APPROVAL AND THE FINAL WORK TO BE DONE AS PER THE AMENDMENTS IF ANY SUGGESTED BY THE IRS.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOBS ARE UNDER THE SCOPE OF SHIPYARD\\ |
| 470 | AE NO 1,2 AND 3 PARALLELING ISSUE NEED TO BE RECTIFIED AND SATISFACTORY RUNNING TRAIL TO BE SHOWN TO SHIP STAFF. AE 3NOS AVR BOARD INSIDE THE ALTERNATOR CASING TO BE REMOVED AND FITTED OUTSIDE THE GENERATOR . EACH PCB TO BE INSTALLED IN A SEPARATE METAL BOX ANYWHERE SAFELY NEARBY THE ENGINE. ELECTRICAL CABLES, BOXES, FITTING ARRANGEMENTS,CONDUIT PIPE FOR THE CABLES TO BE SUPPLIED BY YARD. INSTALLATION REQUIRED FABRICATION OF SUPPORTING FRAMES. CABLES TO BE LAID SAFELY THROUGH HEAT PROOF CONDUIT PIPESALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 471 | AC Compressor 2 NOS: TO BE OVERHAULED BY OEM/ AUTHORISED SERVICE ENGINEER ALL REQUIRED SPARES (YARD SUPPLY) TO BE RENEWED AND SUCCESSFUL RUNNING TRIAL TO BE SHOWN TO SHIP STAFF - TO BE ARRANGED BY YARD3.A.C. COMPRESSOR - MAKE - BOCK INDIA PVT LTD., CAPACITY - 65TRALL SPARES/MATERIAL/CONSUMABLES ETC. REQUIRED FOR THE JOBS ARE UNDER THE SCOPE OF SHIP YARD |
| 472 | 4. ONE UNIT COMPRESSOR TO BE RENEWED WITH SAME EXISTING ONE. (MAKE: BOCK INDIA PVT LTD, CAPACITY - 65TR, TYPE: F16/2051,SR N: AU 7196B018, CAPACITY(Vth: 178.4 METER CUBE/H,PRESSURE RATING: LP:19BAR,HP:28BAR.) |
| 473 | 5. BOTH CONDENSORS TO BE CHEMICALLY CLEANED, PRESSURE TESTED AND END COVERS TO BE RUBBER COATED/RENEWED. SIGHT GLASS TO BE CLEANED/RENEWED. [2 NOS] |
| 474 | AHU SPARE MOTOR TO BE SUPPLIED. 15KW, 415V, 27A. DIMENSION AS PER THE EXISTING ONE. ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 475 | 6. EVAPORATOR TO BE CLEANED CHEMICALLY, PR.TESTED, IF ANY LEAK SAME TO BE RECTIFIED. |
| 476 | 7. A.C. SYSTEM TO BE BLOWN THROUGH WITH NITROGEN GAS, PRESSURE TESTED, LEAKAGE TO BE CHECKED AND RECTIFY(NEW LAGGING TO BE DONE) . LEAKY TUBES AND JOINTS TO BE RENEWED (APROX LENGTH SUC.LINE (3 1/8\\")-25MTR, HOT GAS 2 1/8\\" -4MTR AND LIQUID LINE 1 5/8\\"- 25MTR )SYSTEM TO BE VACCUMISED, GAS TO BE CHARGED AND SYSTEM SATISFACTORY TRIAL TO BE SHOWN TO SHIP STAFF. |
| 477 | AHU DRAIN LINE NEED TO BE MODIFIED FROM AHU ROOM TO OVERBOARD ( 65MM*10MTR OVB LINE WITH 4 BENDS APPROX) |
| 478 | LAB AC AHU DRAIN LINE NEED TO BE MODIFIED FROM AHU ROOM TO OVERBOARD (65MM*15 MTRS ,4 BENDS APPROX) |
| 479 | R.O. PLANT [1 nos]MAKE- SLCE WATERMAKERS, TYPE - SD21-403-3605-03/09\JOB TO BE CARRTED OUT BY O.E.M.SERVICE ENG'R AND SAME ARRANGED BY SHIP YARD. ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 480 | R.O. UNIT COMPLETE SERVICED(OVERHAULED) TO BE CARRIED OUT BY AUTHORISED SERVICE ENGINEER, AND DEFECTIVE SPARES TO BE RENEWED, AND SATISFACTORY RUNNING TRAIL AND PROVING OF THE SYSTEM TO BE SHOWN TO SHIP STAFF.(ARRANGED BY SHIPYARD) |
| 481 | R O PLANT BASE PLATE CORRODED SAME TO BE RENEWED, NECESSARY ARANGEMENT TO BE TAKEN BEFORE SERVICING THE SYSTEM. ANGLE THICKNESS 6MM, LENGTH 3 MTR( 50MM X 50MM) |
| 482 | FOLLOWING SPARES TO BE SUPPLIED FOR THE COMPLETE OVERHAULING AND SATISFACTORY OPERTION OF THE PLANT - PUMP CRANKSHAFT 2531/37 1NO. (PART NO- 710118-25), PLUNGER PISTON 2531 CAT 45749, 3NOS (PART NO - 710118-90), HP PUMP BODY, 4NOS OF PRESSURE GAUGES CALIBERATION, BOOSTER PUMP DIFFUSER PLATE, 1NO. |
| 483 | 2 SAND FILTER TO BE CLEANED/ INSPECTED, |
| 484 | 4 LP AND BOOSTER PUMP ALONG WITH MOTOR TO BE OVERHAULED AND DEFECTIVE SPARES TO BE RENEWED. |
| 485 | 6 DEFECTIVE PRESSURE GAUGES WITH HOSE/TUBES TO BE RENEWED [2 NOS] |
| 486 | 7 DEFECTIVE TUBES, ELBOWS, HOSE, CLAMPS, INTER CONNECTERS AND VALVES TO BE RENEWED |
| 487 | 8. NEUTRALITE FILTER AND CARBON FILTERS TO BE RENEWED |
| 488 | 9.H.P PUMP OIL TO BE RENEWED [5 LTRS] |
| 489 | ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 490 | PUMPSTHE FOLLOWING PUMPS TO BE OVERHAULED COMPLETELY, PUMPS TO BE OPENED UP, PARTS TO BE CLEANED AND INSPECTION TO BE OFFERED AS PART OF CONTINOUS SURVEY BY IRS. THE PUMP HAVE TO BE BOXED BACK WITH NECESSARY NEW SPARES (IMPELLER, SHAFT,SEAL ETC) AND SATISFACTORY RUNNING TRIAL TO BE SHOWN IRS SURVEYOR AND SHIP STAFFS. ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 491 | MAIN ENGINE L.O PRIMING PUMP CAP :136 LTRS/HR MAKE TUSHACO P/PS LTD, MUMBAI, MODEL T3S1-38/46 |
| 492 | FUEL OIL TRANSFER PUMP 2 NOS (TYPE-IN 100, GEAR PP, CAP-6M3/HR@25MWC MAKE -Pompe Garberino SPA) |
| 493 | GS PUMPS 2 NO'S (Pompe Garberino S.p.A CAP:25 M3/HR ( CSM) MODEL;MU40-200ME ) |
| 494 | AC CONDENSER COOLING PUMP ( CAP : 60M³/HR MAKE : BE PUMP PVT LTD TYPE BV 65-250L(CENTRIFUGAL) |
| 495 | SUBMERSIBLE PUMP 2HP WITH SUCTION AND DISCHARGE HOSES (20MTR) TO BE SUPPLIED |
| 496 | ECR SPLIT A.C IN ECR INDOOR UNIT (FWD) TO REMOVE FROM EXISTING PLACE AND FIX TO PORT SIDE OF THE ECR.SATISFACTORY RUNNING SHOWN TO SHIP SHIP STAFF |
| 497 | ECR SPLIT AC :SPLIT A.C INDOOR AND OUT DOOR UNITS TO BE SERVICED, PRESSURE TESTED AND IF ANY LEAKS FOUND PIPE LINE TO BE RENEWED. GAS TO BE CHARGED AND SATISFACTORY TRIAL TO BE SHOWN TO SHIP STAFF (MAKE: BLUE STAR ,TYPE:SPLIT TYPE ,MODEL:(FA324YLU/2022),(FS324YATU/2020),RATED VOLT:230V,FREUQUENCY: 50HZ,SINGLE PHASE)ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 498 | ICAF & MGPSMAKE: HERENWEG 58 - 2751 DBP.O.BOX 47-2750 AA, MOERKAPELLE, NETHERLANDS.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 499 | ICAF & MGPS SYSTEM TO BE OVERHAULED. POWER MODULES SHOWING OVERCURRENT EVEN THE OUTPUT ALSO NOT CONNECTED. SO FOLLOWING SPARES TO BE SUPPLIED AND INSTALLED FOR THE SATISFACTORY OPERATION OF THE SYSTEM. POWER MODULES (PM1, PM2, PM3, PM4) |
| 500 | INSULATION TEST TO BE CARRIED OUT. |
| 501 | COPPER TUBES WORKS : FOLLOWING SIZE PRESSURE GAUGE LINES TO BE RENEWED WITH SUITABLE ADAPTERS , FERRULES AND CLAMPING ARRANGEMENTS.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 502 | 1. 6MM FOR A.C COMPRESSOR 1 & 2 WITH CONNECTOR AND FITTINGS |
| 503 | 2. 8MM FOR VARIOUS PUMPS WITH CONNECTOR AND FITTINGS |
| 504 | 4. 10MM FOR A.C COOLING PUMP WITH CONNECTOR AND FITTINGS |
| 505 | ENG ROOM, AUX. ROOM & STEERING GEAR ROOM BILGE AREA CLEANING AND PAINTING –JOB TO CARRIED OUT AFTER RENEWAL OF PLATES- ARRANGED BY YARD. (800 m2)ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 506 | 1. E/R , AUX M/C ROOM, STEERING ROOM, BT ROOM, BUOY HOLD AND SHAFT TUNNEL P & S BILGES TO BE CLEANED, CHIPPED AND TO BE PAINTED AS PER PAINTING SCHEME(APPROX) |
| 507 | 2.ENGINE ROOM,AUX MACHINERY ROOM & STEERING ROOM OVER HEAD (CEILING) PAINT COAT AS PER PAINT SCHEME TO BE DONE |
| 508 | PLATE GUAGING TO BE DONE ON TANK TOP AREA BELOW BOTH FUEL OIL SERVICE TANKS (PORT AND STBD) AND RENEW. |
| 509 | RUSTED AND THINNED FLOOR PLATES IN E/R AND STEERING GEAR COMPARTMENT TO BE RENEWED WHEREEVER NEEDED (approx) |
| 510 | FLOOR PLATES TO BE SECURED WITH AII SCREWS |
| 511 | FOLLOWING MACHINERIES BASE PLATE/ FOUNDATION ANGLE PLATE TO BE RENEWED AS PER DESIGN. PROPER SLOTS/HOLES TO BE PROVIDED FOR FITTING ABOVE MACHINERIES.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 512 | 2. R.O PLANT BASE PLATE EXCESS HEIGHT TO BE REDUCED / MODIFIED TO FIX HOSES AND CONNECTIONS |
| 513 | FRESH WATER HYDROPHORE TANK - JOB TO BE CARRIED OUT BY YARDTYPE- STEEL BODY VERTICAL, CAPACITY -500 LTRSALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 514 | 1.FRESH WATER HYDROPHORE TANK MANUAL COVER TO BE OPENED AND CLEANED INTERNALLY and painted |
| 515 | FRESH WATER HYDROPHORE SUCTION LINE IN F.W TANKS TO BE RENEWED.45MM [12 METRE] |
| 516 | Complete fresh water line from Hydrophore to all cabins to be chemically cleaned and flushed [150 m] |
| 517 | SEA WATER HYDROPHORE TANK CAPACITY : 500L -JOB TO BE CARRIED OUT BY YARDTYPE- STEEL BODY VERTICAL, CAPACITY -500 LTRS,ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 518 | 1.SEA WATER HYDROPHORE TANK MANUAL COVER TO BE OPENED AND CLEANED INTERNALLY and painted |
| 519 | STEERING GEAR MAKE: WILLS RIDLEY(UK), CAPACITY -2 X 1.2 T-M, TYPE: ELECTRO HYDRAULIC – JOB TO BE CARRIED OUT & SATISFACTORY RUNNING TRIAL TO BE SHOWN TO SHIP STAFFALL SPARES / MATERIALS/ CONSUMABLE WHICH ARE REQUIRED FOR COMPLETE SERVICE, OVER HAULING, FAULT RECTIFICATION ARE UNDER THE SCOPE OF SHIPYARDTYPE;- STEERING CONSOL, W9368. MAKER;- WILLS RIDLEY LIMITED NO.1,KERNICK BUISNESS, PARK ANNEAR ROAD, PENRYN, CARNWALL, TR 10 9EW, UK. PH.00(0)1326376015.FAX 44(0)1326376212 |
| 520 | STEERING GEAR RAMS LIMIT SWITCHES (2NOS) TO BE PROVIDED |
| 521 | RUDDER ANGLE INDICATOR TO BE CALIBRATED. |
| 522 | PANORAMIC RUDDER ANGLE INDICATOR TO BE RENEWED WITH COMPATIBLE ONE. MAKE - SIMRAD, MODEL MK 2 45-0-45, 24V |
| 523 | STEERING GEAR MAKE: WILLS RIDLEY(UK), CAPACITY -2 X 1.2 T-M, TYPE: ELECTRO HYDRAULIC – JOB TO BE CARRIED OUT & SATISFACTORY RUNNING TRIAL TO BE SHOWN TO SHIP STAFF |
| 524 | FOLLOWING SEA SUCTION STRAINERS CASING TO BE REMOVED CLEANED, PAINTED AND FITTED WITH NEW BOLT AND NUTS ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 525 | 1 S/W HYDROPHORE PUMP SUC. STRANIER 32NB |
| 526 | 2.G.S/FIRE/BILGE PUMP 1 & 2 AND EMERGENCY FIRE PUMP STRAINER 80NB |
| 527 | A-FRAME MAKE; PELLEGRINI, SWL.12.5MT.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 528 | 1) A FRAME IN AND OUT STOPPER WOOD PIECE TO BE FIXED |
| 529 | 8.A-FRAME AND ITS BASE TO BE INSPECTED and renewed. LOAD TEST TO BE CONDUCTED BY APPROVED AGENCY AND CERTIFICATE TO BE SUBMITTED (ALL BOLTS AND CONNECTION TO BE CHECKED and renewed |
| 530 | A-FRAME ALIGNMENT NEED TO BE CHECKED AND MATCHED ON BOTHSIDE, Synchronization of the two cylinders to be done. |
| 531 | CALORIFIER CAPACITY ( FLOW RATE 360 LTS/HR), 12KW,415V,3-PHASE( YARD SUPPLY) ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 532 | 2 COIL CONNECTING THREADED CHAMBER TO RENEW. |
| 533 | WATER LEAKAGE FOUND ON COIL TERMINAL SIDE ,NEED TO RECTIFIED AND SATISFACTORY OPERATION SHOWN TO SHIP STAFF |
| 534 | INSULATION FAULT NEED TO BE RECTIFIED AND SATISFACTORY OPERATION SHOWN TO SHIP STAFF |
| 535 | ONE OF THE COIL WAS NOT WORKING ON AUTO MODE, NEED TO BE RECTIFIED AND SATISFACTORY OPERATION SHOWN TO SHIP STAFF |
| 536 | CONTROL AIR LINE VALVES AND PRESSURE REDUCING VALVE - ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 537 | 1. CONTROL AIR LINE VALVES 15NB -10NOS, AND PR. REGULATING VALVES 03NOS TO OVERHAULED AND PR. TESTED AND SATISFACTORY OPERATION TO BE SHOWN TO SURVEYOR AND SHIP STAFF. CONSIDER RENEWAL OF 3 VALVES IF ANY OF THESE BEYOND REPAIR |
| 538 | SEWAGE TREATMENT PLANT –TO BE OVERHAULED BY OEM/AUTHORISED SERVICE ENG. TO BE ARRANGED, SATISFACTORY RUNNING TRIAL AND PROVEN OF THE SYSTEM TO BE SHOWN TO SURVEYOR AND SHIP STAFF. ALL SPares, MATERIAL/CONSUMABLES/OIL, ETC. REQUIRED FOR THE JOBS ARE UNDER THE SCOPE OF SHIP YARD, MAKER – ORACA II A-36 |
| 539 | FOLLOWING WORK TO BE CARRRIED OUT; |
| 540 | 1) NEW SEWAGE HOLDING TANK TO BE FABRICATE AND EPOXY COATING TO BE DONE.NEW JOINT TO BE PUT ON MANHOLE DOOR AND FILLING FLANGE.CAPACITY: 2.5M3. TANK TO BE OFFERED FOR CONTINOUS SURVEY BY IRS |
| 541 | 2)ALL COVERS FOR TREATMENT TANK TO BE OPENED, COMPARTMENTS TO BE INTERNALY CLEANED. |
| 542 | ALL COMMODES TO BE INSPECTED AND WORN PARTS TO BE RENEWED |
| 543 | OILY WATER SEPARATOR (IOPP) - TO BE SERVICED NECESSARY SPARES TO BE RENEWED AND SATISFACTORY TRIAL TO BE SHOWN - ARRANGED BY YARDMAKE: GEORIM, KOREA TYPE - GRS-50EB, IOPPWORK SPECIFICATIONALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 544 | 1.OWS TO BE OPENED UP, INTERNALS TO BE CLEANED, EPOXY COATING TO BE DONE AND SHOWN TO SURVEYOR.. FILTER CARTRIDGES AND, AND TOP COVER \\"O\\" RING TO BE RENEWED. |
| 545 | OWS FRESH WATER-INLET SOLENOID AND PIPE LINE TO BE RENEW. |
| 546 | RELEIF VALVE AND PRESSURE GAUGES TO BE OVERHAUL AND PRESSURE TESTED. |
| 547 | 5.SATISFACTORY RUNNING TRIAL (OPERATION) AND PROVEN OF THE SYSTEM TO BE SHOWN TO SURVEYOR. |
| 548 | ALL SOLENOID OPERATION TO CHECK IF FAULTY THEN RENEW 3 NOS |
| 549 | LAB A/C MAKE: BITZER , MODEL 2T.2 , CAPACITY : 4.6TRWORK SPECIFICATIONALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 550 | LAB AC ELECTRICAL PANEL MAIN BREAKER BROKEN TO BE RENEW |
| 551 | EMERGENGY GENERATOR JOB TO BE CARRIED OUT BY OEM / (GMMCO) AND ENGINE MAKE; CATERPILLER. MODEL;-3054, POWER; 92HP, ENG.SL.NO;GSM00561. EMERG DIESEL ENGINE- AS PART OF THE CONTINUOUS SURVEY BY IRS, THE FOLLOWING COMPONENTS ARE TO BE OPENED UP AND OVERHAULED BY THE OEM, INCLUDING RENEWAL OF NECESSARY SPARES. ALL WORK IS TO BE CARRIED OUT UNDER IRS SURVEY AND COMPLETED TO THE SATISFACTION OF THE ATTENDING SURVEYOR. CYLINDER HEAD, LINER, PISTON, CON ROD, CRANKPIN BEARING, MAIN JOURNAL AND BEARING, INJECTORS, ATTACHED FO PUMP, HP PIPES, EXHAUST MANIFOLD PIPING & INSULATION, CRANKCASE DOORS & RELIEF VALVES, FOUNDATION BOLTS & CHOCKS, ATTACHED SW PUMP, ATTACHED FW PUMP, ATTACHED LO PUMP ETC.ONLY SPARES WILL BE ARRANGED BY NIOT. ALL MATERIAL/CONSUMABLES/OIL, ETC. REQUIRED FOR THE JOBS ARE UNDER THE SCOPE OF SHIP YARD |
| 552 | 1) RADIATOR TO BE REMOVED CHEMICAL CLEANING, PRESSURE TESTED & SHOWN TO SURVEYOR AND FITTED BACK IN PLACE.(COOLENT TO BE DRAINED AND REFILLED AFTER COMPLETING JOB). |
| 553 | 2) ALL SAFETY ALARMS AND TRIPS TO BE CHECKED AND DEFECTIVE SENSOR TO BE RENEWED AND SATISFACTORY TRIAL TO SHOWN TO SHIP STAFF. |
| 554 | DAMAGED FLEXIBLE HOSES OF DIESEL OIL AND LUB OIL TO RENEW. APPROX 10MTR |
| 555 | CONTOL PANEL AND JUNCTON BOX ALL CONNECTION TO CHECK RENEW THE WIRING WITH PROPER CONNECTORS AND FITMENTS IN STANDARD MANNER. CONDUIT PIPES TO BE PROVIDED FOR CABLES |
| 556 | 4) CRANK CASE L.O TO BE FLUSHED AND RENEWED |
| 557 | 3) L.O AND F.O FILTERS TO BE RENEWED |
| 558 | 4) SATISFACTORY TRIAL TO BE SHOWN TO SURVEYOR AND SHIP STAFF. |
| 559 | STERN TRUSTER & BOW THRUSTER TO BE OVERHAULED INCLUDING FOLLOWING JOBS AND SATISFACTORY RUNNING TRIAL TO BE SHOWN TO THE IRS SURVEYOR AS PART OF CONTINOUS SURVEY.. |
| 560 | 1678 STERN THRUSTER1685 DRIVING MACHINERY UNITMAKER - HRP THRUSTER SYSTEMS MODEL - HRP 2010(SD52)PROP. DIA.-515MM (4 BLADES) (JOB TO BE CARRY OUT BY OEM SERVICE ENGINEER, TO BE ARRANGED BY THE SHIPYARD) INDIAN REPRESENTATIVE -M/S ZFMAKER;- HRP THRUSTER SYSTEM. ZAAG 27,PO BOX-20202930 AA KRIMPEN AAN DE LEK, HOLLAND. TEL. NO. 30(0)180-331000, TELEFAX. NO.31(0)180-331099. OEM (ZF) CONTACT NO.7720040156ONLY SPARES WILL BE ARRANGED BY NIOT. ALL MATERIAL/CONSUMABLES/OIL, ETC. REQUIRED FOR THE JOBS ARE UNDER THE SCOPE OF SHIP YARD |
| 561 | FOLLOWING TO BE SUPPLIED FOR THE COMPLETE OVERHAULING AND SATISFACTORY OPERATION OF THE STERN THRUSTER- BEARING COVER, STEERING MOTOR, & GREASE MANIFOLDS |
| 562 | 1.THRUSTER MOTOR TO BE DISCONNECTED AND REMOVED, (ALL FOUNDATION BOLTS ) MOTOR TO BE REMOVED FROM PLACE. |
| 563 | 2.QUADRANT SHAFT TO BE REMOVED, |
| 564 | 3.MAIN THRUSTER SHAFT COUPLING ASSEMBLY,,ALL LUBRICATING CONNECTIONS,GREASING PUMP AND END COVER WITH STEERING ASSEMBLY TO BE REMOVED. |
| 565 | 4.ALL FOUNDATION BOLTS FOR PLANITARY ASSEMBLY TO BE REMOVED AND PROPELLER UNIT TO BE REMOVED FROM PLACE. |
| 566 | 5.ALL TOP AND BOTTOM OF BEARING (S),SEAL(S),PROPELLER IN THE STEM SECTION ASSEMBLY DISMANTALED AND SAME TO BE CLEANED and fitted |
| 567 | 6.ALL DISASSEMBLED PARTS TO BE SHOWN TO SURVEYOR SATISFACTION INCLUDING PROPELLER POLISH AND DP TEST. |
| 568 | 7.ALL PARTS ASSEMBLED WITH NEW \\"O\\" RINGS,SEALS,BEARINGS AND FITTED IN PLACE |
| 569 | 8.GREASING PUMPS TO BE OVERHAULED |
| 570 | 9. GRATINGS TO REMOVED, CLEANED AND BOXED BACK. |
| 571 | 10. STERN THRUSTER MAIN ELECTRICAL PANEL BOARED IN BOUY HOLD FOUND CORRODED AND WASTED.SAME TO BE RENEWED.RELATED WIRING TO BE REMOVED AND REFITTED DURING DOOR RENEWAL. DOOR SIZE= 178CM X 60CM X 2NO'S |
| 572 | 11. LO (25LTS) TO BE DRAINED PRIOR STARTING THE JOB & SAME TO BE FILLED UP ON COMPLETION. |
| 573 | 1678 BOW THRUSTER1685 DRIVING MACHINERY UNITMAKER - HRP THRUSTER SYSTEMS MODEL - HRP 2010(SD52)PROP. DIA.-515MM (4 BLADES) (JOB TO BE CARRY OUT BY OEM SERVICE ENGINEER, ARRANGED BY THE SHIPYARD) , INDIAN REPRESENTATIVE -M/S ZFONLY SPARES WILL BE ARRANGED BY NIOT. ALL MATERIAL/CONSUMABLES/OIL, ETC. REQUIRED FOR THE JOBS ARE UNDER THE SCOPE OF SHIP YARD |
| 574 | SYSTEM PERFORMANCE IS VERY POOR. DRIVING MACHINERY INCLUDED HYDRAULIC MOTOR TO BE CHECKED AND OVERHAULING TO BE CARRIED OUT. BLADE ANGLES TO BE CHECKED AND CORRECTED IF REQUIRED TO ENHANCE THE PERFORMANCE. POWERPACK VALVE BLOCKS TO BE OVERHAULED, SEALING RINGS TO BE RENEWED. |
| 575 | E/R BLOWER TRUNKING/FUNNEL PLATES TO BE RENEWED (3MM MS PLATE)WORK SPECIFICATIONALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE below JOBS ARE UNDER THE SCOPE OF SHIPYARD |
| 576 | 1. E/R PORT AND STBD SIDE BLOWER TRUNKING DAMAGED IN MANY PLACES. SAME TO BE RENEWED (approx) |
| 577 | 2. E/R BLOWER TRUNKING WIRE MESHES WASTED SAME TO BE RENEWED. |
| 578 | 3. FUNNEL PORT AND STBD CORRODED THINED AREA PLATES TO BE RENEWAND WIRE MESHES ARE WASTED SAME TO BE RENEWED. |
| 579 | E/ ROOM BLOWERS DUCTS CORRODED AND WASTED TO BE RENEW |
| 580 | ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 581 | AHU CASING AND DOORS CORRODED IN MANY PLACES SAME TO BE RENEWED ( L-300 CM,B-146,H-150CM) |
| 582 | AHU CASING BASE PLATE TO BE RENEWED AND CONDENSATE DRAIN PROVISION TO BE PROVIDED FROM THE CASING TO OUTSIDE SCUPPER DRAIN LINE. IDEA IS TO PREVENT WATER FLOWING TO AHU ROOM FLOOR |
| 583 | EMERGENCY AIR COMPRESSOR ENGINE (GREAVE MODEL : 1080,SR NO: A5H 94928, HP:6.6 IS ,RPM:3000) AND COMPRESSOR ASSEMBLY (ELGI MODEL: HP 05301,SR NO:23062, FAD/DIS: 206 LPM,WORKING PR: 30 KG/CM , RPM : 950) TO BE SUPPLIED and installed. ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 584 | ELECTRICAL REPAIR SPECIFICATIONALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 585 | PORT MAIN ENGINE MAKER: CATERPILLAR (3508B) .WORK TO BE CARRIED OUT BY OEM GMMCO |
| 586 | MAIN ENGINES ALL ALARMS AND TRIPS TO BE CHECKED, DEFECTIVE TO BE RECTIFY AND SATISFACTORY TRIAL TO BE SHOWN TO SHIP STAFF. |
| 587 | PORT MAIN ENGINE ALL PRESSURE SENSORS (5NOS) ,TEMP SENSORS (4NOS), GAUGES (4NOS) AND CORDS TO BE CHECKED, DEFECTIVE TO BE RENEW. AND SATISFACTORY TRIAL TO BE SHOWN TO SHIP STAFF. |
| 588 | AIR STARTING MOTOR SOLENOID VALVE IS NOT WORKING IN AUTO MODE SAME TO BE REPAIRED AND SATISFACTORY RUNNING TRAIL SHOWN TO SHIP STAFF |
| 589 | STBD MAIN ENGINE MAKER: CATERPILLAR (3508B) WORK TO BE CARRIED OUT BY OEM GMMCO - ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 590 | MAIN ENGINES ALL ALARMS AND TRIPS TO BE CHECKED, DEFECTIVE TO BE RECTIFY AND SATISFACTORY TRIAL TO BE SHOWN TO SHIP STAFF. |
| 591 | STBD MAIN ENGINE ALL PRESSURE SENSORS (5NOS) ,TEMP SENSORS (4NOS), GAUGES (4NOS) & CORDS TO BE CHECKED, DEFECTIVE TO BE RENEWED AND SATISFACTORY TRIAL TO BE SHOWN TO SHIP STAFF. |
| 592 | PORT MAIN ENGINE GEAR BOX: MODEL:- MGN90BL. MAKE:-TWIN-DISC NICO CO LTD - ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 593 | PORT MAIN ENGINE GEAR BOX AHEAD,NEUTRAL,ASTERN PRESSURE SWITCHES TO BE RENEWED AND PROPER WIRING TO BE MADE AND SATISFACTORY OPERATION SHOWN TO SHIP STAFF |
| 594 | PORT MAIN ENGINE SHAFT RPM GAUGE TACHOMETER NOT WORKING SAME TO BE RENEWED AND SATISFACTORY OPERATION SHOWN TO SHIP STAFF |
| 595 | STBD MAIN ENGINE GEAR BOX: MODEL:- MGN90BL. MAKE:-TWIN-DISC NICO CO LTD |
| 596 | ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 597 | STBD MAIN ENGINE GEAR BOX AHEAD,NEUTRAL ASTERN PRESSURE SWITCHES TO BE RENEWED AND PROPPER WIRING TO BE MADE AND SATISFACTORY OPERATION SHOWN TO SHIP STAFF |
| 598 | FOLLOWING TO BE RENEWED IN AUXILIARY ENGINES- STARTING SOLENOID - 3NOS, SHUT OFF SOLENOID - 3NOS, LOCAL DIGITAL TACHOMETER ON ENGINE- 3NOS, PRESSURE GAUGES - 9NOS, TEMP GAUGES -3NOS, ALL SENSORS TO BE CHECKED AND RENEW IF REQUIRED. ALL ELECTRICAL WIRE HARNESS TO BE CHECKED, RENEW IF REQUIRED, PROPERLY LABELLED, AND SECURED IN HEAT RESISTANT CONDUIT PIPEALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 599 | AUX ENGINE TECHOMETER - PART NO 197-7348 to be renewed [2 nos] |
| 600 | GALLEY SUPPLY MOTOR(0.55KW) TO RENEW |
| 601 | PORTABLE BLOWER MOTOR SMALL LOCATION : M/C STORE |
| 602 | ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 603 | GALLEY HOT PLATES, OVEN AND RICE COOKERALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 604 | GALLEY DOSAI PLATE WHOLE UNIT TO BE RENEWED. HEATING COIL RENEWED AND SATISFACTORY TRIAL TO BE SHOWN TO SHIP STAFF ( LENGTH -36 INCH , WIDTH -20 INCH , 415 VOLT 50 HZ |
| 605 | ALL HOT PLATE SWITCHES, CONTACTORS AND THERMOSTAT SWITCH TO CHECK AND IF FOUND DEFECTIVE SAME TO BE REPLACED AND SATISFACTORY TRIAL TO BE SHOWN TO SHIP STAFF SPARES SUPPLY BY YARD |
| 606 | NAVIGATION LIGHTS - 24V DC AND 220V ACALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 607 | FULL SYSTEM TO BE RENEWED, WHICH INCLUDES BUT NOT LIMITED TO PCBS IN WHEELHOUSE, TOGGLE SWITCHES, INDICATION LIGHTS, LIGHT HOLDER, LOCAL PCBS, LIGHT FITTINGS, CABLES, JUNCTION BOX, CABLE TRAYS AND BULBS. AS PART OF CONTINOUS SURVEY BY IRS, THE WHOLE WORK TO BE COMPLETED UPTO THE SATISFACTION OF SURVEYOR |
| 608 | 24V DC CHARGING AND DISTRIBUTION BOARD 1 NO ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 609 | 415/440V CONTROLLER UNIT (SCR) TO BE THOROUGHLY CHECKED/SERVICED AND IF ANY DEFECT FOUND WITH THE CONTROLLER PCB SAME TO BE RENEWED AND TRIAL TO BE SHOWN TO SHIP STAFF. SPARES SUPPLY BY YARD |
| 610 | MAIN AC SWITCH BOARD MAIN PANEL BREAKER BROKEN TO BE RENEW. MAKE - MERLIN GERIN, 440V, 50/60Hz |
| 611 | RO PLANTRO PLANT ALL CONNECTIONS, SOLENOID VALVE, ISOLATER, RELAYS, INDICATION LAMPS,PUSH BUTTON AND DISPLAY UNIT TO BE CHECKED IF ANY DEFECTIVE PARTS TO BE REPLACED SATISFACTORY TRAIL SHOWN TO SHIP STAFF (SPARES SUPPLY BY YARD)ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 612 | STERN THRUSTERMAKER - HRP THRUSTER SYSTEMS MODEL - HRP 2010(SD52)STERN THRUSTER TO BE MADE OPERATIONAL, ELECTRICAL CABLES AND CABLE TRAY, JUNCTION BOXES,CONTACTORS ARE PROPER SECURING ARRANGEMENTS TO BE MADE (IF ANY CABLE INSULATION DAMAGED) RENEWED AND SHOWN TO SHIP STAFFALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 613 | CAPSTAN SPEED AND BREAKINGM TO BE CHECKED AND RECTIFIED (MAKE: TEN HORN WINCHES,TYPE: RCV – 30KN)ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 614 | A-FRAME: DEFECTIVE FLOOD LIGHTS NEED TO BE RENEWED ,SPARES NEED TO PROVIDE BY SHIPYARD. ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 615 | EMERGENCY LIGHTS 24V : CREW CABIN ALLEYWAY 24V NOT WORKING AND DAMAGED, NEED TO BE RENEWED.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 616 | EMERGENCY GENERATOR ROOM : BATTERY CHARGER NEW STAND NEED TO FITTED.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 617 | CO2 ROOM : BLOWER TO BE RENEWED. WIRNG TO BE CHECKED AND RENEWED IF REQUIRED AND TO BE MAKE OPERATIONAL. ALL RELATED DEGUTTING JOBS INCLUDEDALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 618 | BRIDGE STEERING SYSTEM :STOP PUSH BUTTON INDICATION LIGHTS NOT WORKING ,NEED TO BE RENEWED ( 30 VOLT DC , 5 A , JIGO AL6-A )ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 619 | GALLEY OVEN SYSTEM NEED TO BE RENEWED (15KW, 415V ,50HZ)ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 620 | EMERGENCY GENERATOR PANEL MAIN BREAKER BROKEN ,TO BE RENEWED AND PANEL DOOR LOCK NEED TO PROVIDE. (MERLIN GERIN ,COMPACT, MODEL: NS160 N ,UI 750V, Uimp 8kV,440V)ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 621 | MSB PANEL :ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE BELOW JOB ARE UNDER THE SCOPE OF SHIPYARD |
| 622 | ALARM ANNUNCIATOR NEED TO BE RENEWED (TYPE - VTV/ALN/001 , SERIAL NO - VTV/ALN/2K/1053 ) |
| 623 | MSB PANEL ROUTINE COMPLETE OPEN UP , CLEANING , BUSBAR INSPECTION , IR TESTING , ACB /MCCB MAINTENCE , PROTECTION CHECKS ,TIGHTENING OF ALL CONNECTIONS AND FUNCTIONAL TESTING NEED TO BE CARRIED OUT ( MAKE - MARINE ELECTRICALS , SR.- 1543/01/6440 , 415 VOLT , 3PHASE , 50 Hz |
| 624 | ALL MARINE PLUG NEED TO BE CHANGED (2601 /PL 10 AMPS 220 VOLT 3 PIN PLASTIC BODY PLUG )ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 625 | SELECTOR SWITCH'S (ENGINE ROOM , MAIN DECK AND OFFICER DECK) NEED TO BE CHANGED ( 1702 , 15 AMPS 220 VOLT ON /OFF DOUBLE POLE ROTARY SWITCH )ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 626 | SWITCH BOARD FULL SET: ELECTRICAL SWITCH BOARD FULL SET FOR LAB AND CABIN'S NEED TO INSTALLED.( 2 32 AMPS DP SWITCH AND 2 SOCKET WITH INDICATOR LIGHT ,220V,50Hz)ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 627 | MAIN ENGINE LO PRIMING PUMP : STARTER OFF SWITCH NEED TO BE REPLACED( DOL MANUAL MOTOR STARTER , 415 VOLT , 3 PHASE )ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 628 | BED LAMP : FULL LED SET FOR SCIENTIST CABIN AND CREW CABIN NEED TO BE CHECKED AND RENEWED ( AJMERA 5152 8W MARINE BUNK BIRTH LIGHT FITTING WITH BULB 220V,50Hz, LENGTH:166MM, RECTANGLE SHAPE)ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 629 | ENGINE ROOM BLOWERS: E/R PORT AND STBD SIDE BLOWER MOTOR NEED TO BE OVERHAULED(15.5KW),GALLEY EXHAUST MOTOR(1.5KW)AMR BLOWER MOTOR(5KW),CREW TOILET BLOWERS.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 630 | MOTOR OVERHAULING : GS PUMP NO-3 MOTOR((9.2 KW) AND GREW WATER PUMP MOTOR MODEL NO - T 1106876 VOLT 415 , 50 Hz,3 PHASE SQ CAGE ( OVERHAULING NEED TO BE CARRIED OUT AND WORNOUT PARTS NEED TO BE RENEWED AND SATISFACTORY OPERATION SHOWN TO SHIP STAFF.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 631 | MAIN ENGINE (PORT AND STBD ) : SHAFT BEARING TEMPERATURE SENSOR'S MALFUNCTIONING NEED TO BE INSPECTED AND RENEWED IF NEEDED.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 632 | FISH ROOM NO-1 EVAPORATOR : HEATER COIL BURNED OUT NEED TO BE RENEWED AND SATISFACTORY OPERATION SHOWN TO SHIP STAFF.(2.54KW, 220V )ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 633 | MAIN DECK : DECK MACHINERIES 440V PANEL & SHORE CONNECTION PANEL CABLE CONNECTOR NEED TO BE RENEWEDALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 634 | MAIN DECK : DECK MACHINERIES 440V PANEL INDICATION LIGHTS NEED TO BE RENEWEDALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 635 | ENGINE ROOM: ALL MOTORS EARTHING WIRE NEED TO BE FITTED (SOLAS REQUIREMENT)(1/2 mts with LUGS ; HOLE:8MM ,WIRE HOLE SIZE:10SQ MM)ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 636 | ENGINE ROOM : VENTILATION PANEL AND 24V PANEL LOCK NEED TO BE RENEWED ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 637 | MAIN ENGINE (PORT&STBD) : SHAFT EARTHING TO BE RENEWED( 2MTRS WIRES WITH BRUSHES )ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 638 | AHU : AHU MCB NEED TO BE RENEWED ( 32A ,4POLE )ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 639 | VEG ROOM COOLING ISSUE NEED TO BE RECTIFIED. Thermostat switch for refer veg compt (RANGE -13 TO 13, DIFF - 2 TO 10, AC 220V, 16AKP 61Range- -13 to 13Diff- 2 to 10Ac- 220 v, 16 ampALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 640 | SAT C IS NOT CONNECTED WITH EMERGENCY BATTERY. Same to be connectedALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 641 | Meat Room and veg room trap alarm (audiable and visual ) to be checked and renewed if needed in the wheel house. Cable to be laid around 50 mALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 642 | 1 nosWELDING MACHINE REQUIRED (INVERTER WELDING MACHINE ,200A ,MAG/MMA/TIG LIFT WELDER/ SUPPORTS 1.6 -3.2MM ELECTRODES AND 0.8-1.0MM FLUX WIRE. ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. B691 |
| 643 | Conference room on the 2nd deck to be modified in to a lab to house all scientific equipment’s and computers. Existing racks (0.5mtr x5mtr) to be removed. Centre table to be removed (2mtrx2mtr). A new running table as per latest and high quality wood to be be fabricated as shown in blue color in reference pic (5mtr x 5mtr). 6 no’s of high quality new revolving chairs with lashing arrangement to be supplied. Vinly flooring to be replaced with new one (6mtr x 6mtr). A wash basin to be provided on the corner of the room as shown. Connection for water and drain to be taken behind the panel. All materials and consumables like taps, pipes, joints,union, hooks, hinges, racks, valves, hoses etc are under shipyard scope. |
| 644 | PORT &STBD M/E AND A/E 1,2 & 3 FABRICATE NEW ATTCAH LINE WITH VALVE IN STARTING AIR LINE FOR MOISTURE DRAIN IN AIR LINE BETWEEN VALVE AND STARTING MOTOR SIZE 20NB ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 645 | In compliance with the PHO regulations, total 4 water purifier to be installed [each deck 1 unit] for providing easy accessibility of potable water to the Scientist and crew onboard during the working hours. 2 spare filters for each purifier also to be provided [2x4] i.e., 8 spare filters.ALL MATERIALS/SPARES/CONSUMABLES REQUIRED FOR THE ABOVE JOB ARE UNDER THE SCOPE OF SHIPYARD. |
| 646 | Removal of Existing Furniture and Equipment Supports:Remove all old laboratory wooden tables -10 m, racks, stainless steel (SS) table- 2 m, Lab Millipore unit steel stand and UPS steel stand from the laboratory and Scientist Office (all old wooden tables and wooden rack). Note: Before removal of tables and racks, all scientific equipment and their accessories shall be carefully shifted to a safe location. Protected from damage, dust, paint etc. Ensure all cables and connectors are properly secured and protected from damage, dust, paint etc.All materials/spares/consumables required for the job are under the scope of shipyard. |
| 647 | Handling and Protection of Scientific EquipmentDismandling and removal of all unwanted cables, the existing display unit with its stand, pipeline, and water tap; isolate and disconnect the water supply; and replace damaged bulkheads with new one - 5 m.Necessary carpentary, plumbing works and electrical work are under the scope of shipyardAll materials/spares/consumables required for the job are under the scope of shipyard. |
| 648 | Lab split AC condensed water drain facility to be arrangedRequired plumbing work to be doneAll materials/spares/consumables required for the job are under the scope of shipyard. |
| 649 | Installation of New Furniture |
| 650 | Provide and install new (Laboratory) tables with 6 single door cupboards. Tables shall be: -Table Wood thickness should be 3 to 5 cm -Laboratory table size details are given below-Approx. STBD side table size; L-500cm x B-75cm x H-80 cm-Approx. Port side table size: L-200cm x B-75cm x H-80 cm-Approx. Forward table size: L-160cm x B-75cm x H-80 cmAll materials/spares/consumables required for the job are under the scope of shipyard. |
| 651 | Provide and install new (Scientists Office) tables with 9 single door cupboards. Tables shall be: -Table Wood thickness should be 3 to 5 cm -Laboratory table size details are given below-Approx. STBD side table size; L-300cm x B-60cm x H-80 cm-Approx. Port side table size: L-500cm x B-60cm x H-80 cm-Approx. Forward table size: L-170cm x B-60cm x H-80 cm-Approx. AFT SS table size: L-156cm x B-60cm x H-100 cmAll materials/spares/consumables required for the job are under the scope of shipyard. |
| 652 | The existing sofa, table, and small cupboard in the 2 Scientist in port/aft side cabin shall be removed.A new compact sofa shall be provided in the aft-side cabin along with one wooden tea table.All materials/spares/consumables required for the job are under the scope of shipyard. |
| 653 | A new table shall be provided with four cupboards with drawers for storing tools, spares, manuals, and other equipment.Provide and install new (2 scientists Cabin) tables with 4 single door cupboards and 2 drawers.Tables shall be: -Table Wood thickness should be 3 to 5 cm -Laboratory table size details are given below-Approx. Port side table size; L-345cm x B-70cm x H-90 cm-Approx. AFT Sofa size: L-154cm x B-70cm x H-100 cm-Finished with blue-coloured mica and properly polished. All the new cupboards and tables shall be provided with locks and keys. Each key shall be supplied with a separate key chain and clearly identified for the respective cupboard. All materials/spares/consumables required for the job are under the scope of shipyard. |
| 654 | Reinstallation of Scientific Equipment |
| 655 | After completion of all carpentry work/new furniture installation, all scientific equipment shall be reinstalled and secured in both the laboratory and Scientists office. - Equipment must be fixed securely on the tables, and placement shall be done as per NIOT instructions.- Install aluminium bars on all new tables in the bulkhead area for securing scientific equipment. - Provide 30 numbers of aluminium bars for equipment fixing and 100 numbers of spare T-bolts and nutsAll materials/spares/consumables required for the job are under the scope of shipyard. |
| 656 | Refitting of Scientists office Rack: Dimension: H- 150cm, L-170cm, B-50cm- Scientists office rack to be removed and fixed outside of ship office and proper new door arrangement with locks and keys to be arranged. Each key shall be supplied with a separate key chain. - Lab AC to be shifted from STBD to AFT side.All materials/spares/consumables required for the job are under the scope of shipyard. |
| 657 | Winch Control Room:- 17 inch monitor for echosounder reapeater to supplied and installed and suitable cable to be laid from lab to winch room, approx. length 15 m- New AC 1 Ton to be installed.- Door keel to be replaced with the new one.- Clean all glass surfaces thoroughly and replace any damaged or defective glass based on the requirment.- Replace the existing film with a sun heat control, UV protection, and window film suitable for glass doors.All materials/spares/consumables required for the job are under the scope of shipyard. |
| 658 | Laboratory Refrigeration- The existing laboratory refrigerator shall be shifted to the cabin.- A new refrigerator shall be supplied and installed in the 4-Scientists Cabin for scientific use. Reputed brand to be supplied- Capacity- 190 to 250 L.- Suitable fixing and securing arrangements for the new refrigerator and existing laboratory refrigerator shall be provided by the shipyard to ensure safe and stable operation.All materials/spares/consumables required for the job are under the scope of shipyard. |
| 659 | Relocation of Existing Hot Air Oven and BOD incubator- Suitable fixing and securing arrangements for the existing laboratory BOD incubator and Hot Air Oven shall be provided by the shipyard to ensure safe and stable operation.- The existing (Laboratory/Scientists office and etc.) cable route shall be properly re-laid using marine stranded.All materials/spares/consumables required for the job are under the scope of shipyard.Necessary carpentary, plumbing works and electrical work are under the scope of shipyard. |
| 660 | UPS New UPS stand to be supplied. Suitable fixing and securing arrangements for the existing laboratory UPS shall be provided by the shipyard to ensure safe and stable operation. Additional cable with required rating of 20 m to be supplied and proper cable routing as per marine standard to be done.All materials/spares/consumables required for the job are under the scope of shipyard.Necessary carpentary, electrical work, ceiling and wall panel opening/closing are under the scope of shipyard. |
| 661 | Deep Freezer (-80 degree) – Scope of Work- Capacity- 400L- A new deep freezer shall be supplied and installed in the Officer/Scientist Mess Room for scientific use. - STBD side Wooden Table to be removed. - A new 15A Plug point with switch to be installed.- Suitable fixing and securing arrangements shall be provided by the shipyard to ensure safe and stable operationAll materials/spares/consumables required for the job are under the scope of shipyard.Necessary carpentary, plumbing works and electrical work are under the scope of shipyard. |
| 662 | Scientists office: - A new stainless steel (SS) wash basin with an accompanying side table for scientist use shall be installed. - A new freshwater line should be provided, along with the necessary taps and valves. (10 m, SS)- Scientists Office- AFT side: (3mm thickness SS table)- Length-185 cm and breadth- 65 cm- The Milli-Q system and Autosal shall be installed on the SS table area, with proper fresh water inlet, outlet and drain facility arrangements provided to support their operation. - Securing and lashing arrangement for rough seas to be provided to Milli-Q system, Dosimat Titration unit, Microscope, spectrophotometer, centrifuge, Autosal, Auto clave, Monitors, CPU, Printers etc. to be done. -All materials/spares/consumables required for the job are under the scope of shipyard.Necessary carpentary, plumbing works and electrical work are under the scope of shipyard. |
| 663 | Procurement of New Computer and TV - A new advanced computer (Windows- based PC, allowing compatibility with modem data logging software)shall be provided to support the operation of the Guildline 8400B Autosal salinometer (scientific operation). -2 nosSpecification: At least i7 processor and Gen-14 or above with 2 TB internal hard disc, with 16 GB RAM, installed with genuine OS and Anti Virus software with valid license for 3 years, MS Office With Com ports, USB ports. With 24inch Monitor. This system to be installed onboard with necessary mounting arrangement and fixers which should be secured from rolling/ pitching of ships. The system shall be configured for real-time data acquisition and serial communication.- A new 50” LG TV shall be procured for use by scientists, students, and for onboard meetings. A new 20-meter USB cable shall be supplied and connected from the TV to the general-purpose PC.- 1 no. This TV shall be fitted in scientist’s office.All materials/spares/consumables required for the job are under the scope of shipyard.Necessary carpentary, electrical work and panel opening/closing are under the scope of shipyard. |
| 664 | Procurement of New Chairs:20 nos office chairs shall be procured, and suitable securing arrangements shall be provided to prevent damage due to vessel rolling and pitching. All materials/spares/consumables required for the job are under the scope of shipyard. |
| 665 | New Plug points and switches- 30 nos. , 220V, AC 15 A & 5 A with switches and indicatorSupplying and installation of new plug points, switches, cable-60 m of suitable rating as per marine standards.All materials/spares/consumables required for the job are under the scope of shipyard.Necessary carpentary, electrical work and panel opening/closing are under the scope of shipyard. |
| 666 | Supply and Installation of CCTV- New Camera and MonitorsSupply and installation of additional camera – 2 Nos. and Monitors- 3 Nos. Number of Cameras: 2 Nos. (New Installations)1. Camera 1 – Kely France Winch Monitoring (Purpose: Continuous monitoring of the Kely France winch area)2. Camera 2 – (Purpose: Continuous online CTD Operation Monitoring)Number of Monitors: (17 inch - 3 Nos.) (New Installations)1. Monitor1 –Location: Laboratory (Purpose: Continuous monitoring of the Kely france winch area)2. Monitor 2 – Location: Winch Control Room (CTD and Winch Operation Monitoring)3. Monitor 3 – Location: Scientists OfficeAll materials/spares/consumables required for the job are under the scope of shipyard.Necessary carpentary, electrical work and panel opening/closing are under the scope of shipyard. |
| 667 | New Cable Route (RJ45 – cable)- 2 runs, approx. each run 60m- New Cable route from Laboratory (DGPS) to Scientists Office.- New cable route from Laboratory (MRU) to Scientists Office.- 02 Nos. Splitter RS232/one to 4 four COM port to be installed in Scientists Office with necessary enclosure and jack.All materials/spares/consumables required for the job are under the scope of shipyard.Necessary carpentary, electrical work and panel opening/closing are under the scope of shipyard. |
| 668 | Air conditioner- Relocating the existing outdoor unit of the laboratory air conditioner to the upper deck area. - In its previous location, a new stainless-steel wash basin for scientist use shall be installed, along with a proper freshwater supply line, tap, and valve.All materials/spares/consumables required for the job are under the scope of shipyard.Necessary carpentary, electrical work and panel opening/closing are under the scope of shipyard. |
| 669 | Offline CTD winch- The offline CTD winch power cable line, MS pipe and freshwater hose line shall be properly fixed - 6 m.All materials/spares/consumables required for the job are under the scope of shipyard.Necessary carpentary, electrical work and panel opening/closing are under the scope of shipyard. |
| 670 | Underwater Transducers maintenance & painting:- Multibeam Echosounder Transducer maintenance & painting (on hull mounted blister ) - Single beam Echo Sounder Transducer maintenance & painting (hull mounted)- Navigational Echosounder & Speed Log (Hull mounted) - ADCP and Sub Bottom Profiler Transducers maintenance & painting( hull mounted).- Gondola & Blister cleaning and painting.- Yard has to take Extra care for protection of transducer while, H.P cleaning, Blasting, barnacle removing / scrapping, etc. Adequate scaffolding to be provided .- Anti-fouling paint is to be applied on the hull-mounted transducer in accordance with OEM recommendations.- Paint all two Winch drum / Pipelines / A frames / and winch base.- All sensors, scientific equipment, Lab equipment, cables (Lab, Winch , sensors, Transducers, Navigational equipment, etc), connectors, and hull-mounted transducers shall be properly covered to protect them from dust, paint, fire, damage, water leakage, and human interference.- SVP70 Cable routing to be done from hull to lab-Cable is there onboardAll materials/spares/consumables/paints required for the job are under the scope of shipyard. |
| 671 | The crew changing room (Octans – scientific equipment) has been installed. A new protective SS cover arangement needs to be provided, and the existing cupboards shall be modified or removed.Dimension: 1.5 L * 1 w* 1 H in ft.All materials/spares/consumables required for the job are under the scope of shipyard. |
| 672 | Thermosalinograph - The Thermosalinograph chamber drain line leakage shall be rectified. - A new dedicated pump shall be installed (As per OEM recommended), with a seawater supply line provided from the ship’s hull. Proper installation shall be carried out by the yard.- Additionally, a new MS pipeline of approximately 20 meters, along with 20 clamps, 6 bents shall be installed. An existing SBE38 temperature sensor and SBE21 chamber shall also be integrated into the pipeline. The system shall be complete with 2 valves and a new flow meter. (Note: The seawater AC (cooling) line is currently connected to the thermosalinograph chamber.)All materials/spares/consumables required for the job are under the scope of shipyard.Necessary carpentary, electrical work and panel opening/closing are under the scope of shipyard. |
| 673 | A new seawater line shall be provided from the engine room to the main deck, including all necessary piping, taps, and valves to ensure proper operation. (Approximately 30 meters of ¾” stainless steel (SS) piping shall be provided, including 6 bends and 15 clamps. Necessary sealing tape shall be used during installation.)- Two (2) numbers of 2-way ball valves and one (1) number of a 3-way ball valve shall be installed on the main deck. One outlet of the 3-way ball valve shall be connected to a 20-meter hose.E13A branch connection shall be taken from the existing freshwater line near the online CTD winch and extended to a total hose length of 30 meters. The hose shall be provided in two sections of 15 meters each, connected through a suitable mechanical coupling. The free end of the hose shall be fitted with a nozzle having provision for water flow adjustment. The hose and nozzle assembly shall be of a removable type. This arrangement shall be used for cleaning of scientific equipment and the deep-sea winch cable. All materials/spares/consumables required for the job are under the scope of shipyard. |
| 674 | GST as per HSN Code Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail