| 1 | Fitting and erecting one HT A type Single Pole inposition, including fitting cross arm, digging and backfilling pit in ordinary soil (as per standards), drawingsufficient length of GI earthing leads from F clampthrough V cross arm to the ground for earthing(excluding provision of earthing). |
| 2 | Labour charges for loading HT A type pole from thestacking place and unloading the same at work site(transportation by any vehicle). |
| 3 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 4 | Transporting poles by hired vehicle to a distance upto5km and carrying upto 4 numbers of poles excludingloading& unloading charges |
| 5 | Additional rate for providing one disc set, PG clamp etc.complete, on any type of HT pole for making cut point. |
| 6 | Labour charges for loading HT PSC pole from thestacking place and unloading the same at work site(transportation by any vehicle). |
| 7 | Fitting and erecting one HT PSC Single Pole in position,including fitting cross arm, digging and back filling pit inordinary soil (as per standards), drawing sufficientlength of GI earthing leads from F clamp through Vcross arm to the ground for earthing (excluding provisionof earthing). |
| 8 | Fitting and providing one HT Stay for 11kV pole, includingdigging and back filling pit in ordinary soil. |
| 9 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance ofmaterials. |
| 10 | Fitting and providing one Strut using HT PSC poleincluding digging and back filling pit in ordinary soil. |
| 11 | Fitting one Additional V cross arm in existing singlepole including conveyance of materials. |
| 12 | Stringing of one km 11kV line with ACSR Raccoon (3conductors) after fitting insulators and giving jumperconnections including cutting and removing tree branches wherever necessary excluding cut point works. |
| 13 | Providing Stay for LT poles including digging & backfilling pit in ordinary soil. |
| 14 | Transferring LT single phase 2/3 wire OH line to newlyerected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 15 | Dismantling (without damage) LT stay includingdigging pit in all classes of soil and backfilling. |
| 16 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 17 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 18 | Disconnecting and lowering down the single phase WPservice connection with guy wire from the OH line andreconnecting the same after completing the line work. |
| 19 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 20 | Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking. |
| 21 | Dismantling (without damage) one HT PSC/RCC Strut pole including removal of clamps and stacking. |
| 22 | Dismantling (without damage) one V crossarm/Channel cross arm from existing Pole and bringingback to section store. |
| 23 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 24 | Dismantling one damaged 11kV PSC/RCC pole afterdisconnecting stays, strut etc. attached thereon and stacking the same. |
| 25 | Dismantling (without damage) one Channel crossarm from existing DP structure and bringing backto section store. |
| 26 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling theconductor and stacking the materials. |
| 27 | Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store. |
| 28 | Dismantling one damaged HT PSC/RCC Strut poleincluding removal of clamps and stacking. |
| 29 | Stringing, shackling, fitting cross arms, insulators andbinding, giving jumper connection etc. using ACSRRabbit for Phase and ACSR Weasel for Neutral & StreetMain, for one km LT 3ph 5 wire line including cuttingand removing tree branches wherever necessary andconveyance of all materials (except poles) from stacking place. |
| 30 | Transferring LT three phase 4/5 wire OH line to newlyerected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. Please Enable Macros to View BoQ information |