| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 2 | 11 kv Fuse Set |
| 3 | Dropper Channel |
| 4 | Abc cable (3*120+1*95+1*16)MM^2 |
| 5 | LT AB Cable 1*400 mm^2 |
| 6 | PCC Pole 8.5 m Long |
| 7 | Stay Set Complete |
| 8 | 250 KVA 11/0.4 KV T/F New |
| 9 | Supply & Erection of Following Material as per UPPCL/DVVNL/ RESPO Norms and Standard/Related IS (Note: All Petty item required for proper completion of work will be by provided by the contractor free of cost.) |
| 10 | Copper L-piece |
| 11 | I Hook with clamp |
| 12 | LUG 120^2 |
| 13 | Dead end clamp |
| 14 | Suspension clamp |
| 15 | Distribution Box |
| 16 | Distribution Box Clamp |
| 17 | LT Protection Pannel with 03 Nos Circuit Stud type tailless unit along with busbar for 250 kva DT. |
| 18 | Lug 400 mm^2 |
| 19 | Connecting Leads 1x25 Sq.MM. |
| 20 | Piercing connector |
| 21 | Stone Pad |
| 22 | Nut bolt |
| 23 | Loop Insulator |
| 24 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 25 | Erection of P.C.C. Pole 8.5 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 26 | Grouting of P.C.C. Pole 8.5 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 27 | Fixing of Stay Rod and its erection. Stay wire should be properly binded and tightened as per Standard Specification. |
| 28 | Grouting of Stay set as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work. |
| 29 | Laying & erection of AB Cable (3*120+1*95+1*16) mm2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 30 | Laying & erection of AB Cable (1*400) mm2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 31 | Erection of 11 kv Fuse Set |
| 32 | Erection of Dropper Channel |
| 33 | Chemical Earthing for 250 KVA T/F for Neutral & Body as per RESPO Norms (All the material for earthing will be provided by the contractor) |
| 34 | Deep Pipe Earthing of T/f Neutral as per Standard Specifications & as per RESPO Norms (All the material for earthing will be provided by the contractor) |
| 35 | Mounting of 250 KVA T/F on the double pole / plinth structure and connection thereof as per respo Norms & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 36 | Construction of Plinth Suitable for 250 KVA T/F with material (Sand, Bricks, Cement) & T&P Labour as per respo manual. All meterial Cement, Sand , Blast Stone will be provided by the contractor. |
| 37 | Fencing of T/F Plinth including material Labour & T&P as per respo manual. |
| 38 | Dismantling of existing line/ T/f and removal of all accessories & fittings from poles, re-rolling of conductor and proper stacking and Cartage of dismantled conductor & accessories from site of work to DVVNL, Store. Please Enable Macros to View BoQ information |