| 1 | Survey (GIS based), soil investigation, Engineering, Design (hydraulic and structural) as required, procurement of all labour & material, T&P etc. for completion of various components under “Used Water Management Project in Nagar Panchayat Ikauna Distt. Shravasti”. Construction of Interception and Diversion works of all existing drains, conveyance network and establishment of Centralized/ De-centralized Sewage Treatment Plant(s) based on any proven technology, inclusive of 4 KLD Co-Treatment facility for Faecal Sludge/ Septage Management, ensuring the final effluent parameter strictly complies with the National Green Tribunal (NGT) latest guidelines i.e. BOD<10mg/l, TSS< 20mg/l, Nitrogen-Total<10mg/l, Total Phosphorus <1mg/l, Fecal coliform<100 MPN & COD<50mg/l Execution of all works including cost of Civil, E&M and instrumentation works with suitable foundation for I&D, conveyance network, STP(s) with inlet chamber, pre-treatment units (including one stand-by unit), Primary/ Secondary Treatments, Disinfection, Disposal of treated sewage by gravity, Sludge Thickening, Sludge dewatering units with necessary piping work with valves, gates, drains, pathways etc. all complete. The STP shall also have flow meters installed at inlet, outlet and bypass, level sensors, PLC/SCADA Automation and required instrumentations including IP based CCTV during construction and O&M period.Also including required power infrastructure such as DG sets, Electric Substation, Transformers and their foundation, pumps and Control Panels, SCADA & Meter room, Administrative building cum Laboratory with Store room, boundary wall 1.8 m high with main gate wicket gate & other required buildings) and disposal of treated effluent, with all other associated works at Nagar Panchayat Ikauna District Shravasti, U.P, India. Note: The scope of work includes successful testing, commissioning & trial-run for 3 months, handing over all works to concerned department/ULB also including defect liability period of 12 months for Civil works & 24 months for E/M works. Please Enable Macros to View BoQ information |