|
| 1 | Repair/Servicing of Alfa Therma /Thermax / rapid cool/Western Make 1,00,000.00 K Cal/hr capacity water boiler which includes following :- Disconnecting electrically drain out of water opening of burner chamber, blower assembly all accessories & mounting on boiler, cleaning of coil & complete body with chemical agents and reassembling of the same after necessary servicing/repairing/replacement of unserviceable parts as specified in each items mentioned / directed at site including minor repair such as welding, brazing, fabrication, etc and all minor items such as nuts, bolt and washer etc complete all as specified and directed by Engineer-in-Charge.Note :- Spare parts required for repair/ replacement shall be measured and paid for separately |
| 2 | S&F Input ignition transformer 220 Volts having out/input 11 KV to 14 KV suitable for Alfa Therm / Rapid Cool / Thermax /Western boiler complete as per sample complete all as directed & specified. |
| 3 | S&F Fuel filter body suitable for Alfa Therm / Rapid Cool / Thermax /Western boiler complete all as per sample all as specified and directed by Engineer-in-Charge |
| 4 | S&F Fuel pump for burner suitable for Alfa Therm / Rapid Cool / Thermax /Western boiler complete all as per sample all as specified and directed by Engineer-in-Charge |
| 5 | S&F Sequence controller with photocell complete all as per sample all as specified and directed by Engineer-in-Charge |
| 6 | S&F motor for burner along with coupling and other minor accesries as required at at site suitable for Alfa Therm / Rapid Cool / Thermax /Western boiler complete all as per sample all as specified and directed by Engineer-in-Charge |
| 7 | S&F ignition cable ram for burner suitable for Alfa Therm / Rapid Cool / Thermax /Western boiler complete all as per sample all as specified and directed by Engineer-in-Charge |
| 8 | Supply and fix in replacement Digital temperature controller suitable for Rapid Cool / Thermax /Western boiler, and make the necessary programming to run the boiler satisfactorily complete all as per sample all as specified & directed by Engr-in-Charge. |
| 9 | S&F in replacement of nozzle of sutaible size with new one and connected items for burner assembly of hot water generator of Make : Alfa Therm / Rapid Cool / Thermax /Western model all as directed by Engr-in-Charge |
| 10 | S&F Fuel filter suitable for Hot Water Boiler of Make : Alfa Therm / Rapid Cool / Thermax /Western boiler complete all as per sample all as specified and directed by Engineer-in-Charge |
| 11 | S&F in replacement of Pressure gauge of size 4\\" for sutaible size of pipe line and connected items all as specified and directed by Engr-in-Charge. |
| 12 | Rewinding of electric motor 5 HP 3 phase 415 with suitable size super enameled copper wire and insulation as per existing gauge and rating complete all as specified and directed by Engr-in-Charge. |
| 13 | Rewinding of electric motor 2/3 HP 3 phase 415 with suitable size super enameled copper wire and insulation as per existing gauge and rating complete all as specified and directed by Engr-in-Charge. |
| 14 | M&L for taking out Heat exchanger, consisting of closely wound, helical, concentric coils, arranged to give adequate No of passes, and repairing the coil by suitable welding, cleaning complete all as specified and directed by Engr-in-Charge. |
| 15 | Supply and replacement of pressure jet burner assembly suitable for light oil firing with stepless modulation mechanism all as per manufacturer design and of required head and capacity Make : Alfa Riello/ Rhino model for hot water generator including all other connected items all as directed by Engr-in-Charge |
| 16 | M&L for repair of electrical panel of boilers including replacement of indicator lamp,switch,MCB, push buttons,relay of appropirate rating etc to make electric panel fully functional completein all respects all as specified and directed by Engr-in-charge. |
| 17 | M&L in replacement of electrical panel mounted on boilers including replacement of sensors, pressure gauge and all other items connected to boiler control panel and making boiler fully functional complete in all respects all as specified and directed by Engr-in-charge. |
| 18 | Taking down old insulation of MS water tank of cap upto 8000Ltr and S&F for insulation of Cylindrical shaped horiznatal placed with kaflex of thickness 50mm with factory laminated aluminium vapour barrier, thickness of insulation 26 SWG and including the following:- (a) M&L for cleaning the surface (to be insulated ) by scrapping carefully with wire brush etc. to make the surface completely free of millscale, dirt, dust, grease and other foreign materials . (b) M&L for applying rubber based adhesive CPRX compound.(c) M&L for sealing of all longitudinal joints and circular overlaps with and including Aluminium foil tape 50 mm wide, to make the insulation leakproof. (d) M & L for securing the insulation with and including GI wire by tightening it latitudinally with the insulation. (e) M&L for cladding the insulation with 26 gauge aluminium sheet including rivetting work complete. as specified and as directed by Engineer-in-charge. |
| 19 | S&F over load relay suitable for motor contractor complete all as per sample all as specified & directed by Engr-in-Charge. |
| 20 | S&F contactor of suitable capacity MNX A2 or equivalent suitable boiler mounted panel complete all as per sample all as specified & directed by Engr-in-Charge. |
| 21 | Disconnecting & Taking out unserviceable tank of capacity upto 10000 Ltr for cleaning from inner and outer surface, repairing of any leakages with welding and refixing the same after repair complete all as specified and directed by the Engr-in-Charge. |
| 22 | S&F 0.5 HP pump motor 215V, 50Hz, along with flexible hose pipe for filling diesel tank complete all as specified and directed by Engr-in-charge. |
| 23 | S&F Single phase to 3 phase upto 2 HP Starter for submercible motor with digital voltmeter, amp meter start stop push button complete all as specified and sample approved. |
| 24 | Taking up the complete pumping set of capacity upto 3.0 HP from exisiting borewell of depth upto 95 mtrs alongwith column pipe 80mm bore total length upto 80 RM after disconnecting the pipe from electric circuit. Reassembly of pumping set complete after repair and lowering the same to the satisfaction of Engineer-in-Charge.Note: - Any repair required for pumping set, bore well will be measured and paid separately under respective items of schedule of work. T&P required for repairs , lowering or taking up of pumping set will be the responsibility of the contractor and rates quoted are deemed to be included in unit rate quoted. |
| 25 | M&L for Strip opening of motor of submersible pump of capacity upto 3.0 HP and rewinding the motor with copper conductor of standard size including insulation and soldering of connection etc. Assembly of motor with pump set with necessary studs, bolts, washers etc and repair of pump set complete all as specified and directed. Please Enable Macros to View BoQ information |
| 26 | M&L for Strip opening of motor of submersible pump of capacity upto 3.0 HP and rewinding the motor with copper conductor of standard size including insulation and soldering of connection etc. Assembly of motor with pump set with necessary studs, bolts, washers etc and repair of pump set complete all as specified and directed. Please Enable Macros to View BoQ information |