| 1 | WITH ITC AVAILABILITY |
| 2 | Finishing walls with Acrylic Smooth exterior paint of required shade:Old work (One or more coat applied @0.90 Itr/10 sqm). |
| 3 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC (Volatile Organic Compound) content less than 50 gram/ litre, of approved brand and manufacturer including applying additional coats wherever required to achieve even shade and colour Old work (one or more coats) |
| 4 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:One or more coats on old work. |
| 5 | White washing with lime to give an even shade. Old work (two or more coats) |
| 6 | Re-lettering with black Japan paint of approved brand and manufacture. |
| 7 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. |
| 8 | Repair to plaster of thickness 12mm to 20mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curingmortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge. |
| 9 | Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 10 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 11 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete |
| 12 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms,lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. |
| 13 | Providing of High glazed Lime for Line marking such as Surya Plus or equivalent of 25 KG as per instructons of EIC. |
| 14 | Line Marking by deployement of 40 nos.Unskilled Labour at various locations inside mine as per instruction of EIC. |
| 15 | Upkeeping of concrete pavement/ Black topped roads excluding coal transport road by brooming and disposal of collected debris/ waste at collection pit/ dustbins or at specified locations within a lead of 50 metresincluding all tools & plants like spade, basket, brooms with handle stick complete as per the direction of Engineer-In-Charge. |
| 16 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 17 | Cleaning and manual collection of visible waste such as plastic bags, bottles, glass etc. as per the direction of Engineer-In-Charge.(6 nos unskilled Labours). |
| 18 | Supplying and stacking good quality moorum at work site with all lead and royalty, all complete. |
| 19 | Spreading moorum/sand/ stone dust etc. in layers not exceeding 150mm in thickness, levelling to required gradient and camber, watering and consolidation of each layer with vibratory roller (Payment to be made for compacted volume of moorum/sand). |
| 20 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |