|
| 1 | Dismenteling of old brick work including labour T&P etc all complete (S.I. no 692) |
| 2 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M and lead upto 30 M and including filing watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenchs or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30 M from the foundation trenches SOR UP PWD S1-251A) |
| 3 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 8:4:1 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work |
| 4 | M-150 Brick work in 1:6 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. |
| 5 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. |
| 6 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. |
| 7 | Providing of wall putty with all material labour T&P etc all complete |
| 8 | Finishing wall with water proof cement paint of approved quality on previously new work with two coat tio give in even shade including supply of all materials ,labour and tools and plants etc.. Required for proper completion of work. |
| 9 | C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit with micron polythene (without dovel bar) all work complete |
| 10 | Receved old brick |
| 11 | Recevied old brick bats |
| 12 | Construction of granular sub base by providing well graded material spreading in uniform layers in all complete work |
| 13 | Supply of 80mm thick C.C. Interloking Rubber MouledeTiles ISI marked shaped as per PWD Schedule Chapter-20 of 01-07-2016 page 43 S.I. No 20.36 New item 12 page no 43 including laying of Tiles cushan with local sand in all complete (as page 43 new item 16 |
| 14 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab/ nall with all comp of work |
| 15 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. |
| 16 | M.S iron work as per reinforcement in all complete work |
| 17 | Two coat painting with all material labour T&P etc all complete |
| 18 | S/F of intigration stone in all complete work |
| 19 | Add 18%GST Please Enable Macros to View BoQ information |