| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M and lead upto 30 M and including filing watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenchs or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30 M from the foundation trenches SOR UP PWD S1-251A) |
| 2 | Supply and laying of 40mm thick brick bats in all complete work |
| 3 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 8:4:1 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work |
| 4 | M-150 Brick work in 1:3 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. |
| 5 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab/ nall with all comp of work |
| 6 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab/ nall with all comp of work |
| 7 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. |
| 8 | M.S iron work as per reinforcement in all complete work |
| 9 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. |
| 10 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. |
| 11 | Two coat painting with all material labour T&P etc all complete |
| 12 | Providing of wall putty with all material labour T&P etc all complete |
| 13 | M.S iron work as per reinforcement in all complete work |
| 14 | Suuply and fixing galvanized corrugated iron roofing 24 BWG in position in all complete work |
| 15 | Painting or varnishing work in small area or new with Two coat of approved suprior quality |
| 16 | Cemant concrete with 4cm Gauge stone Ballast Fine sand of 1.25 FM and cemant in Proportion of 4:2:1 in Founfation including supply of all matrial labour and tools and plant for proper complition of work (S.I.No. 279) |
| 17 | Supply and fixing of granite stone 20mm thick and joint filled with 1:2 cement in all complete work |
| 18 | Construction of granular sub- base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface , mixing by mix in place method with rotavaror at OMC , and compacting with vibratory foller to achieve the desired density , complete as per clause 401 |
| 19 | Supply of 80mm thick C.C. Interloking Rubber MouledeTiles ISI marked shaped as per PWD Schedule Chapter-20 of 01-07-2016 page 43 S.I. No 20.36 New item 12 page no 43 including laying of Tiles cushan with local sand in all complete (as page 43 new item 16 |
| 20 | Add 5 % for electrification |
| 21 | Add 18%GST Please Enable Macros to View BoQ information |