| 1 | Dismenteling of old damage cc road including labour T&P etc all complete. |
| 2 | Disposal of malwa upto 5km including loading and unloading labour T&P etc in all work complete. |
| 3 | Dismenteling of old brick work including labour T&P etc all complete (S.I. no 692) |
| 4 | Deduction cost of old brick bat |
| 5 | Deduction cost of old brick |
| 6 | Earthwork in cutting or in embankment in ordinary soil in all complete as per S.I. No. 251-a |
| 7 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work |
| 8 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. |
| 9 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. |
| 10 | Cement Concrete with 2 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 4:2:1, including supply of all materials, labour, tools & plants etc required for proper completion of the work As per direction of E/I. |
| 11 | Construction of granular sub base by providing cloase garded material conforming to specification in all complete work |
| 12 | Providing and laying of interloking concrete block pavement having thickness 80mm as per drawings and technical specification in all complete work |
| 13 | C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit with micron polythene (without dovel bar) all work complete |
| 14 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab/ nall with all comp of work |
| 15 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. |
| 16 | Supply and fixing of inaugartion stone board of all material & labour in all complete work |
| 17 | Supply and fixing of information board as permdirection of material and labour in all complete work |
| 18 | Add 18%GST Please Enable Macros to View BoQ information |