|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.DSR-2.8.1 |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density complete. as per Technical Specification Clause 401 |
| 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) DSR No- 6.1.1 |
| 4 | 12 mm thick cement plaster with 1:4........complete item DSR NO 13.1.1 |
| 5 | 1:2:4 (1 cement : 2 coarse sand (zone-III) including manufactured sand derived from Recycled Concrete Aggregate(RCA) upto 25% : 4 graded stone aggregate 20 mm nominal size Recycled Concrete Aggregate (RCA) upto 25%).DSR No 4.1.3A |
| 6 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR NO 5.12 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.DSR NO 5.22.1 |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(WMM) |
| 9 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. |
| 10 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading premixed with bituminous binder @ 4.0 percent by weight of total mix and filler transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled vibratory achieve the desired compaction as per morth specification clause no.505 complete in all respects. |
| 11 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleanedwith mechanical broom. |
| 12 | Providing and laying bituminous concrete with Higher capacity batch type hot mix plant using crushed aggregates of specified grading premixed with bitumanous binder @ 5.4 percent of mix and filler transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MORTH specifcation clause no.507 complete in all respects. |
| 13 | Synthetick track - Spray coat running track : structure:2mm thickness EPDM color top layer pluse 10mm thickness SBR rubber prticle on the bottom 1st layer :Prime coating layer 2nd layer :SBR layer (100% recyclling rubber) 3rd layer : spray coat EPDM layer (Elastic EPDM + Colored PU) including required all line marking ...complete item. |
| 14 | Mechanical compaction by 8 to 10 tonne DSR NO 0054 |
| 15 | Supply and installation of submercible pump with 70 mtr boring. |
| 16 | PVC pipe 6kg/ sqm cm. DSR No 18.3.4 |
| 17 | Supply of information stone size 4x2.5 feet all com. Please Enable Macros to View BoQ information |