| 1 | Dismentling of cc interloking tiles in all complete work |
| 2 | Dismenteling of old brick work including labour T&P etc all complete (S.I. no 692) |
| 3 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M and lead upto 30 M and including filing watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenchs or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30 M from the foundation trenches SOR UP PWD S1-251A) |
| 4 | Disposal of malwa upto 5km including loading and unloading labour T&P etc in all work complete. |
| 5 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work |
| 6 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 8:4:1 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work |
| 7 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. |
| 8 | Cement Concrete with 2 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 4:2:1, including supply of all materials, labour, tools & plants etc required for proper completion of the work As per direction of E/I. |
| 9 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. |
| 10 | C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit with micron polythene (without dovel bar) all work complete |
| 11 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab/ nall with all comp of work |
| 12 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. |
| 13 | Deduction cost of old brick |
| 14 | Deduction cost of old brick bat |
| 15 | Add 18%GST Please Enable Macros to View BoQ information |