| 1 | Dismenteling of old brick work including labour T&P etc all complete (S.I. no 692) |
| 2 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M and lead upto 30 M and including filing watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenchs or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30 M from the foundation trenches SOR UP PWD S1-251A) |
| 3 | Supply and laying of 40mm thick brick bats in all complete work |
| 4 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 8:4:1 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work |
| 5 | M-150 Brick work in 1:6 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. |
| 6 | 2.5 cm thick and of cement concrete consisting of 1 part cement 1part approved coarse and 3 part approved 10mm in all complete work |
| 7 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab/ nall with all comp of work |
| 8 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. |
| 9 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. |
| 10 | M.S iron work as per reinforcement in all complete work |
| 11 | Earth work in filling upto 8 km distance frome site including loading unloading cartage etc complete (anallises Rate) |
| 12 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. |
| 13 | Two coat painting with all material labour T&P etc all complete |
| 14 | Providing of wall putty with all material labour T&P etc all complete |
| 15 | Suuply and fixing galvanized corrugated iron roofing 24 BWG in position in all complete work |
| 16 | Painting or varnishing work in small area or new with Two coat of approved suprior quality |
| 17 | Cemant concrete with 4cm Gauge stone Ballast Fine sand of 1.25 FM and cemant in Proportion of 4:2:1 in Founfation including supply of all matrial labour and tools and plant for proper complition of work (S.I.No. 279) |
| 18 | Supply and fixing of granite stone 20mm thick and joint filled with 1:2 cement in all complete work |
| 19 | Supply of 80mm thick C.C. Interloking Rubber MouledeTiles ISI marked shaped as per PWD Schedule Chapter-20 of 01-07-2016 page 43 S.I. No 20.36 New item 12 page no 43 including laying of Tiles cushan with local sand in all complete (as page 43 new item 16 |
| 20 | Supply and fixing of precast iron benches market rate |
| 21 | Providing and fixing of Indian Type W.C. Pan in all complete |
| 22 | Supply and fixing of 5 mm thick china white glazed tiles including or in skirting or dado laid with 1:3 cement and c,Sand mortar finished with white cement slurry jointing and polishing complete including supply of all material complete of the work.( Size of tiles up to 200x300mm) |
| 23 | Electricity charges |
| 24 | site clearance |
| 25 | Supply and fixing of inogration 1*1 stone in all complete work |
| 26 | Supply and fixing of information board as per design in all complete work |
| 27 | Add 18%GST Please Enable Macros to View BoQ information |