| 1 | DRAIN WORK |
| 2 | Dismantling pucca brick,stone masonry or lime work. including stacking serviceable materail in countable stacks within 15m lead and disposal of unserviceable materials with all leads complete as per direction of Engineer-in-charge. 50% repair work |
| 3 | Earth work in excavation in foundation treaches in| ordinary soil(Vide classification of soil item-A) and disposal of excaveted earth as obtained to a distance upto 50M including all lifts levelling,ramming the foundation trenches, removing roots of trees, ,shrubs all complete as per approved design, building specification and direction of E/I. 50% repair work |
| 4 | Providing coarse clean sand in filling in foundation trenches or in plinth, including ramming and watering in layer not exceeding 150mm thick, with all leads and lifts, including cost of all materials, labour, royalty and taxes, all complete as per building design and specifications and direction of E/I.(Mode of measurement compacted volume)50% repair work |
| 5 | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -all work up to plinth level: (1:1.5:3) (1 cement : 1.5 coarse sand (zone III ) : 3 graded stone aggregate 20 mm nominal size ). bed concrete and top of the brickwork for repair work |
| 7 | Providing designation 75B brickwork in Cement mortar 1:6 in foundation and plinth with approved quality of clean coarse sand of FM. 2 to 2.5 including providing 10 mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing taxes and royalty all complete as per building specification and direction of E/I. 60% |
| 8 | Providing 12mm thick cement plaster 1:4 with clean coarse sand of FM 1.5 including screening, curing with all lead and lifts of water, scaffolding, taxes and royalty all complete as per building specification and direction of E/I. walls and top area. 60% |
| 9 | Providing 1.5mm cement punning including curing,carriage of water withall leads and lifts as per building specification and direction of E/I. |
| 10 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work upto Plinth Level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) DRAIN SLAB. 80% of total length |
| 11 | Centering and shuttering including strutting, propping etc and removal of form for foundation ,footigs and bases 80% |
| 12 | Centering and shuttering including strutting, propping etc and removal of form for Slab edges 80% |
| 13 | Providing Tor Steel Reinforcement of 8mm,10mm,12mm and 16mm dia bars as per approved design and drawing with cutting, bending and binding with annealed wire with cost of wire removal of rust, placing the rods in position ( including carriage of bars to worksite) all complete as per building specification and direction of E/I. |
| 14 | 8mm (Tmt coil Fe 565 ) (only Valid for tata (tiscon), sail, jspl, electrosteel ltd. Bokaro and vizag (RINL)).40% |
| 15 | 10mm (TMT coil Fe 565) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL))60% |
| 16 | CULVERT |
| 17 | Dismantling pucca brick,stone masonry or lime work. including stacking serviceable materail in countable stacks within 15m lead and disposal of unserviceable materials with all leads complete as per direction of Engineer-in-charge. 50% repair work |
| 18 | Earth work in excavation in foundation treaches in| ordinary soil(Vide classification of soil item-A) and disposal of excaveted earth as obtained to a distance upto 50M including all lifts levelling,ramming the foundation trenches, removing roots of trees, ,shrubs all complete as per approved design, building specification and direction of E/I. 50% repair work |
| 19 | Providing coarse clean sand in filling in foundation trenches or in plinth, including ramming and watering in layer not exceeding 150mm thick, with all leads and lifts, including cost of all materials, labour, royalty and taxes, all complete as per building design and specifications and direction of E/I.(Mode of measurement compacted volume)50% repair work |
| 20 | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. |
| 21 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work upto Plinth Level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) DRAIN SLAB. 60% of total length |
| 22 | Centering and shuttering including strutting, propping etc and removal of form for foundation ,footigs and bases |
| 23 | Centering and shuttering including strutting, propping etc and removal of form for WALLS |
| 24 | Centering and shuttering including strutting, propping etc and removal of form for Slab edges |
| 25 | Providing Tor Steel Reinforcement of 8mm,10mm,12mm and 16mm dia bars as per approved design and drawing with cutting, bending and binding with annealed wire with cost of wire removal of rust, placing the rods in position ( including carriage of bars to worksite) all complete as per building specification and direction of E/I. |
| 26 | 8mm (Tmt coil Fe 565 ) (only Valid for tata (tiscon), sail, jspl, electrosteel ltd. Bokaro and vizag (RINL)).40% |
| 27 | 10mm (TMT coil Fe 565) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL))60% |
| 28 | for cleaning |
| 29 | labour unskilled |
| 30 | reja female unskilled |
| 31 | Carriage of materials |
| 32 | cement |
| 33 | coarse sand |
| 34 | stone chips |
| 35 | bricks |
| 36 | 18% GST |
| 37 | 1% labour cess Please Enable Macros to View BoQ information |