| 1 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work |
| 2 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. |
| 3 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. |
| 4 | Cemant concrete with 4cm Gauge stone Ballast Fine sand of 1.25 FM and cemant in Proportion of 4:2:1 in Founfation including supply of all matrial labour and tools and plant for proper complition of work (S.I.No. 279) |
| 5 | Cheuered precast cement concrete tiles 22mm thick in footpath & courtyrd, jointed in all complete work |
| 6 | Painting or varnishing work in small area or new with Two coat of approved suprior quality |
| 7 | Providing of wall putty with all material labour T&P etc all complete |
| 8 | Finishing wall with water proof cement paint of approved quality on previously new work with two coat tio give in even shade including supply of all materials ,labour and tools and plants etc.. Required for proper completion of work. |
| 9 | Earthwork in cutting or in embankment in ordinary soil in all complete as per S.I. No. 251-a |
| 10 | Providing wall painting with App quality in all complete work |
| 11 | S/F of Double Swing Jhula ETE complete work |
| 12 | S/F of Seluxse jhula 12ft in all complete work |
| 13 | S/F of Leg Pressin all complete work |
| 14 | S/F of air walker in all complete work |
| 15 | S/F of parallel bar/mankey bar climbar in all complete work |
| 16 | S/F of SK walker in all complete work |
| 17 | Sully and fixing of gajibo in all complete work |
| 18 | Supply and fixing of land scaping |
| 19 | Supply and laying of compost organic fertilixer for plants and land scaping |
| 20 | Water Supply with PVC pipe fitting in allcomplete work |
| 21 | Supply and fixing of precast RCC benches in all complete work |
| 22 | M.S iron work as per reinforcement in all complete work |
| 23 | Add 18%GST Please Enable Macros to View BoQ information |