|
| 1 | Dismenteling of interloking tiles work including labour T&P etc all complete |
| 2 | Dismenteling of brick work including labour T&P etc all complete |
| 3 | Deduction of old brick bats |
| 4 | Deduction of brick bats |
| 5 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M and lead upto 30 M and including filing watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenchs or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30 M from the foundation trenches SOR UP PWD S1-251A) |
| 6 | Disposal of malwa upto 5km including loading and unloading labour T&P etc in all work complete. |
| 7 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work |
| 8 | M-150 Brick work in 1:6 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. |
| 9 | 2.50 cm. thick DPC with 1:1.5:3 with 10mm Stone grite inclding labour T&P etc all complete |
| 10 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. |
| 11 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. |
| 12 | Cement Concrete with 2 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 4:2:1, including supply of all materials, labour, tools & plants etc required for proper completion of the work As per direction of E/I. |
| 13 | Chequerd precast cement concrete tiles 22mm thick footpath & courtyard in all complete work |
| 14 | M.S or iron work of small sizes and section such as holding down bolt hold fast in all complete work |
| 15 | Painting or varnishing work in small area or new with Two coat of approved suprior quality |
| 16 | Providing of wall putty with all material labour T&P etc all complete |
| 17 | Finishing wall with water proof cement paint of approved quality on previously new work with two coat tio give in even shade including supply of all materials ,labour and tools and plants etc.. Required for proper completion of work. |
| 18 | Providing wall painting withh App. Quality in all complete work |
| 19 | Supply and fixing of precast RCC benches in all complete work |
| 20 | S/F of double Sqing jhula 12te in all complete work |
| 21 | S/F of seluxe jhula 12ft in all complete work |
| 22 | S/F of parallel bar/mankey bar climber in all complete work |
| 23 | S/F of sky walker in all complete work |
| 24 | Supply and fixing of land scaping Grass in all cmplete work |
| 25 | Water Supply Charge with CVPC pipe |
| 26 | Add 18%GST Please Enable Macros to View BoQ information |