| 1 | Earthwork in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, within a lead of 75 m as directed.The item includes necessary trimming the sides of trenches, levelling,dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1500 mm. (considering 50 mm clearence)Sec-1A, Pg -1, Sl.no.- 2(a) of PWD Schedule, 2017 |
| 2 | Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidated the same by through saturation with water ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)Sec-1A,Pg - 2, Sl.no.- 4(A) of PWD Schedule, 2017 |
| 3 | Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. Sec-1C,Pg - 13, Sl.no.- 1 of PWD Schedule, 2017 |
| 4 | Ordinary Cement concrete (Mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement , if any, in ground floor as per relevant IS codes.(b) River Bazree Sec-1C,Page -24/ Item 4 (a) 3rd Corrigenda,Page No:10,of PWD Schedule, 2017 |
| 5 | Ordinary Cement concrete (Mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement , if any, in ground floor as per relevant IS codes.(b) River BazreeSec-1C,Page -24/ Item 4 (a) 3rd Corrigenda,Page No:13,of PWD Schedule, 2017 |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 metre using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). 25 mm. to 30 mm. thick wooden shuttering.Sec-1C,Pg -42, Sl. No - 36(a) of PWD Schedule, 2017 |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups,binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape,placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction. For works in foundation, basement and upto roof of ground floor / upto 4m. Tor steel/Mild steel III) Others Manufacturers not specified10th Corrigenda dated 22.01.2020 & addenda for Schedule of rates of PWD (W.B) wef 01.11.2019 ,Sl No:1,Ref Page:43,Pg - 01,Item 40(a)(i) of Chapter C |
| 8 | Brick work in cement mortar (1 : 6) with first class kiln burnt bricks including racking out joints, scaffolding and other incidental works etc. complete.a) In foundation & plinth.3rd Corrigenda dated 04.06.18 & addenda for Schedule of rates of PWD (W.B) wef 01.11.2017SEC-1C,Pg - 15, Sl.no.- 8(b) |
| 9 | b) In superstructure ground floor3rd Corrigenda dated 04.06.18 & addenda for Schedule of rates of PWD (W.B) wef 01.11.2017SEC-1C,Pg - 15, Sl.no.- 8(b) |
| 10 | Plaster (to wall, floor, ceiling etc.) with (1:6) sand and cement mortar including rounding off or chamfering corners, as directedand racking out joints or roughening of concrete surface including throating. Nosing and drip course as necessary at ground floor.3rd Corrigenda dated 04.06.18 & addenda for Schedule of rates of PWD (W.B) wef 01.11.2017 sec-1(I)Pg - 189, Sl no - 2(ii)(c) of PWDSec-1(I)Pg - 189, Sl no - 1(i)(c) of PWD Schedule, 2017 |
| 11 | b) 20 mm thick with 1:6 cement mortar. 3rd Corrigenda dated 04.06.18 & addenda for Schedule of rates of PWD (W.B) wef 01.11.2017 sec-1(I)Pg - 189, Sl no - 1(i)(b) of PWD Schedule, 2017 |
| 12 | c) 10 mm thick with 1:4 cement mortar.3rd Corrigenda dated 04.06.18 & addenda for Schedule of rates of PWD (W.B) wef 01.11.2017 sec-1(I)Pg - 189, Sl no - 2(ii)(c) of PWD Schedule, 2017 |
| 13 | 25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface). [Note: - Waterproofing as per item 9, polymer based paint as per item 8 (a) of subhead C of Section (C).3rd Corrigenda dated 04.06.18 & addenda for Schedule of rates of PWD (W.B) wef 01.11.2017 Sec-1(D),pg-47, sl no -1 of PWD Schedule, 2017 |
| 14 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor.3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement).Using grey cement(ii) 25 mm. thick3rd Corrigenda dated 04.06.18 & addenda for Schedule of rates of PWD (W.B) wef 01.11.2017 sec-1(D),P - 48, sl no - 6(i)of PWD Schedule, 2017 |
| 15 | Neat cement punning about 1.5 mm. thick in wall dado, floor, drain, door and window sill etc. complete. Sec-1(I),Pg - 192, Sl no - 15 of PWD Schedule, 2017 |
| 16 | (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor.(ii) Grill weighing above 16 Kg./sq.mtr and above. 3rd Corrigenda dated 04.06.18 & addenda for Schedule of rates of PWD (W.B) wef 01.11.2017 Sec-1(F),pg-104, sl no - 13 (a)(ii)of PWD Schedule, 2017 |
| 17 | Supplying 1.5mm thick M.S. sheet fitted and fixed on one or both faces of M.S./ W.I. gate etc. with point welding at not more than 150mm apart complete in all respect as per design including cost of all labour and materials.Sec-1(F),pg-105, sl no - 15 of PWD Schedule, 2017 |
| 18 | Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, alamoid/Bitumen/M-Seal etc) completeSec-1(M)pg-213, sl no - 21(A(i) of PWD Schedule, 2017A) UPVC Pipes:(i) 75 mm. Dia |
| 19 | B) UPVC Fittings:a) Plain Tee (i) 75 mm. Dia Sl no - 21(B(i) of PWD Schedule, 2017 |
| 20 | C) Bend 87.5 degree (i) 75 mm. Dia Sl no - 21(C(i) of PWD Schedule, 2017 |
| 21 | Earth work in filling in foundation trenches or plinth with good earth in layer not exceeding 150 mm. Including watering and ramming etc. layer by layer complete with earth obtained from excavation of foundation.Sec-1A,Pg - 1, Sl.no.- 3(a) of PWD Schedule, 2017 |
| 22 | Priming one coat on steel or other metal surface with synthetic enamel / oil bound primer of approved quality including smoothening surfaces by sand papering etc. Sec-1(K),Pg - 176, Sl no - 7(b) PWD Schedule, 2017 |
| 23 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary. Two coats (super gloss hi- gloss except white)Steel surface iv) Two coats (with any shade except white)Sec-1(k),Pg - 201, Sl no - 2(b)(iv) of PWD Schedule, 2017 |
| 24 | White washing including cleaning and smoothening surface thoroughly (5 parts of stone lime and 1 part of shell lime should be used in finishing coat) all floorSec-1(J),pg-194, sl no - 1(c) of PWD Schedule, 2017 |
| 25 | Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification.ii) b) Two coatsSec-1(j),pg-197, sl no - 15(iii) of PWD Schedule, 2017 |
| 26 | Supplying fitting approved type ventilator in position after cutting holes in walls setting in cement mortar mending damages to wall and plaster and two coats of paint of approved brand sand shade. Payment of mending two damages of wall & plaster and paintingto be made separately. (b) (i) R.C.C ventilator of 20 mm. thick.i) Upto 0.10 sq.m. area PWD(WB), BUILDING WORKS, Page - 40, Item - 29.b |
| 27 | Supplying and fixing 2 Way MCB SS enclosure with IP-20/30 protection,powdercoted provision for two pole MCB,concealed in wall after cutting the wall & mending good the damages to original finish incl. painting,connection & provision for earthing attachment.(Refer PWD Electrical schedule Volume I,D-9,Page-35 of 106) |
| 28 | Supplying and fixing 240/415 V 32 A MCB DP of breaking capacity 10KA & Characterstics on din rail of enclosure existing and necessary connection (Legrand make)Refer PWD Electrical schedule Volume I,D-6, Sl No:7,Page-30 of 106) |
| 29 | Wiring in 1.1 KV grade 2 x 22/0.3 (1.5 sq mm) + 1 x 22/0.3 (1.5 sq mm) single core stranded \\"FR\\" PVC insulated & unsheathed copper wire (Brand approved by EIC) of following sizes in 25 mm PVC casing-capping (Precision make) incl . Necy. PVC clips, fittings etc. Refer PWD Electrical schedule Vol I,E-11, Sl No:1,Page-55 of 106) |
| 30 | Distribution wiring in 1.1 KV grade 2x22/0.3 (1.5 sq mm) single core stranded \\"FR\\" PVC insulated & unsheathed copper wire ((Brand approved by EIC) in suitable size PVC casing-capping (Precision make) with 1 x 22/0.3 (1.5 sq mm) single core stranded \\"FR\\" PVC insulated & unsheathed copper wire for ECC , incl. necy. PVC clips, fittings etc. to light/fan/call ball point with piano key type switch (Anchor make) fixed on sheet steel fabricated switch board with perspex/bakelite top cover on wall incl. necy. connections and making earthing attachment and mending good damages to building works(Average run 8 mtr)Refer PWD Electrical schedule Vol I,E-11, Sl No:2(C),Page-55 of 106) |
| 31 | Distribution wiring in 1.1 KV grade 2x22/0.3 (1.5 sq mm) single core stranded \\"FR\\" PVC insulated & unsheathed copper wire ((Brand approved by EIC) in suitable size PVC casing-capping (Precision make) with 1 x 22/0.3 (1.5 sq mm) single core stranded \\"FR\\" PVC insulated & unsheathed copper wire for ECC , incl. necy. PVC clips, fittings etc. to 5A 3 pin flush type plug socket with piano key type switch (Anchor make) fixed on sheet steel fabricated CRC MS switch with bakellite/perspex(wall matching color) to top cover of 3mm thick flushed in ewall by housing the board after cutting brick wall incl necy connection making earthing arttachment,painting and mending good damages to building works(PVC Casing-capping and plug box both on surface) on Board.(Refer PWD Electrical schedule Vol I,E-12, Sl No:6(a),Page-56 of 106) |
| 32 | Supply & fixing angular batten holder (Anchor) on 75 mm dia PVC round block / round bakelite on wall/ceiling (Refer PWD Electrical schedule Volume I,D-13, Sl No:22(,Page-41 of 106) |
| 33 | Supplying & Fixing bulk head light fitting (Havells make) with die cast aluminium housing & frosted glass on wall/ceiling incl. S&F 8 watt CFL / 100watts GLS lamp complete set.(Refer PWD Electrical schedule Volume-I,D-13, Sl No:23(Page-41 of 106) |
| 34 | Fixing only for 200A TPN switch fuse unit in sheet steel enclosure with HRC Fuse on angle iron frame on wall (Refer PWD Electrical schedule Volume-I,C-1, Sl No:2(Page-18 of 106) |
| 35 | Fixing only 200A MS sheet metal busbar chamber on angle iron frame on wall for 4 Bars(Refer PWD Electrical schedule Volume-I,C-1, Sl No:6(Page-18 of 106) |
| 36 | Fixing only 63A,415V TPNsheet steel main switch (Rewirable type)/ Change over on angle iron frame on wall .(Refer PWD Electrical schedule Volume-I,C-1, Sl No:1(Page-18 of 106). |
| 37 | Fixing only Star-Delta Starter (for 20 HP Motor control) with Nuts & Bolts fixed on angle iron frame on wall.(Refer PWD Electrical schedule Volume-I,C-1, Sl No:7(b)(Page-18 of 106). |
| 38 | Fixing & connection Capacitor Bank with suitable cable and other necessary materials to the system on a suitable place as per direction of E.I.C.(Sanctioned Rate of SE(AM) Siliguri(AM) Circle vide G.O No:915(Sanc)-WI/P/MI/2I-93/2017 Dt12/12/2017 ) |
| 39 | Meter loop connection with 1.1 K.V. Gr. 3½ core 50 Sq mm. P.V.C. insulated & sheathed and armoured Aluminium Cable from meter to 200 A Fuse unit and incomming TPN Main Switch / Terminal (Brand : Gloster / Havells / Finolex)Refer WRIDD SOR 2018, Sl No13(D)(Page-42 of 60). |
| 40 | Supply & fitting fixing 415 v, 3 Nos 200 A Porcelain Base rewireable type fuse unit & 1 no nutrtal link on wooden plank on wall with S. & F . 2' x 1' x 1 '' thick wooden plank(seasonal sal wood) with a clearance of minimum 1\\" from wall surface with S&F 4 nos suitable size of Nut,Bolt(byfurcated one end) & washer including finishing of wooden plank with painting and mending good the damages(Sanctioned Rate of SE(AM) Siliguri(AM) Circle vide G.O No:915(Sanc)-WI/P/MI/2I-93/2017 Dt12/12/2017 ) |
| 41 | Supplying and Drawing with 1.1 KV , PVC flexible ' FR ' cables Copper conductor conforming to IS 694 in suitable size with fitting and fixing on wall / kiosk box , (i) 4C x 25 sq mm copper cable conforming to IS 694 in [100/200 A TPN switch to bus bar(Refer WRIDD SOR 2018, Sl No:14,(Page-42 of 60). |
| 42 | (ii) 3C x 16 sq mm copper cable conforming to IS 694 [Busber to 63 A, TP Main switch and 63 A TP switch to Motor starterRefer WRIDD SOR 2018, Sl No:14,(Page-42 of 60). |
| 43 | (iii) 2 x 3 C x 10 sq mm copper cable conforming to IS 694 in 32 mm GI conduit (ISI Medium quality) [star delta motor starter to motor.Refer WRIDD SOR 2018, Sl No:14,(Page-42 of 60). |
| 44 | Supply & Fixing 15 cm x 10 cm (6'' x 4'' ) EI danger board on wall.)Refer PWD Electrical schedule Vol-I,D-13, Sl No21(a)(Page-41 of 106). |
| 45 | Supply & Fitting Fixing of shock treatment chart on a wooden frame (Sanctioned Rate of SE(AM) Siliguri(AM) Circle vide G.O No:915(Sanc)-WI/P/MI/2I-93/2017 Dt12/12/2017 ) |
| 46 | Supplying and fixing compression type gland complete with brass gland ,brass ring & rubber ring for dust & moisture proof entry for the following six of PVC armoured cables.(a) For 3½ core upto 50 Sq mm.(Refer PWD Electrical schedule Vol-I,F-4, Sl No:7(D)(Page-73 of 106). |
| 47 | Finishing the end of following PVC armoured cables by crimping method incl . supplying and fixing solderless socket(Dowels make), tapes, anticorrosive paste & jointing materials a.) For 3.5 core 50 Sq mm Al.Cable .(Refer PWD Electrical schedule Vol-I,F-5, Sl No:8(B)(Page-74 of 106). |
| 48 | Supply & Fixing indicator lamp (Red , Yellow & Blue of best quality) 3 Nos and 5 A Sliding fuse unit of best quality 3 nos and 5A Sliding fuse unit of best quality -C55Nos (to be fixed on BBC)(Sanctioned Rate of SE(AM) Siliguri(AM) Circle vide G.O No:915(Sanc)-WI/P/MI/2I-93/2017 Dt12/12/2017 ) |
| 49 | Earthing with 50 mm dia ISI Meduim GI pipe 3.64 mm thick x 3.04 Mts. Long and 1 x 4 SWG GI (Hot Dip) wire (4Mts. Long) , 13 mm dia x80 mm long GI bolts, double nuts, double washers incl S & F 15 mm dia GI pipe protection (1 Mts. Long) to be filled with bitumen partly under the ground level and partly above ground level.(Refer PWD Electrical schedule Vol-I,G-1, Sl No:2(a),(P-76 of 106). |
| 50 | Supplying & Fixing Earth Bushbar of galvaanised(HOT DIP) MS Flat 25mm X 6 mm on wall having clearance of 6mm from including providing drilled holes on the bushbar complete with GI bolts , nuts, washers, spacing insulators etc. as required.(Refer PWD Electrical schedule Vo-I,G-2, Sl No:4(a),(Page-77 of 106). |
| 51 | Connecting the equipments to earth bushbar including S & F solid no. 8 SWG GI (Hot Dip) wire on wall/ floor with staples buried inside wall/floor as requried and making connection to equipments with bolt , nuts, washers,, cable, luns etc. as required and meeting good damages.(Refer PWD Electrical schedule Vo-I,G-2, Sl No:5a(III),(P-77 of 106). |
| 52 | Insulation testing of internal wiring of Pump House/Kiosk Box including wiring of electric Motor & other ancilary equipments by means of Megger .WRDD,SC-2018, Page No.-106, Item No.-15 |
| 53 | Supply, fitting fixing of iron angle frame fabricated with35mmx35mmx5mm thick iron angle and 32mmx5mm thick flat iron bar with four nos legs fitted fixed in the wallincluding mending good damages,welding, threading etc incomplete evrythring and fitted fixed of main switch, busbar, starter, capacitor bank and coneection of earthing attachemnt etc. as per direction of EICRef:Sanctioned Rate of SE(AM) Siliguri(AM) Circle 2022-23 |
| 54 | Add: Extra Carriage @4% on all items except Item No. 1 & 21 |
| 55 | Add GST @18% |
| 56 | Add Labour Welfare Cess @ 1% Please Enable Macros to View BoQ information |