| 1 | Dismenteling of existing plaster work including labour T&P etc all complete |
| 2 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work |
| 3 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. |
| 4 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. |
| 5 | Cement Concrete with 2 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 4:2:1, including supply of all materials, labour, tools & plants etc required for proper completion of the work As per direction of E/I. |
| 6 | Chequerd precast cement concrete tiles 22mm thick footpath & courtyard in all complete work |
| 7 | M.S or iron work of small sizes and section such as holding down bolt hold fast in all complete work |
| 8 | R.C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit all work complete (S.I. No. 284(a)) |
| 9 | Mild steel work in all work complete (S.I. No. 504) |
| 10 | Earthwork in cutting or in embankment in ordinary soil in all complete as per S.I. No. 251-a |
| 11 | Painting or varnishing work in small area or new with Two coat of approved suprior quality |
| 12 | Providing of wall putty with all material labour T&P etc all complete |
| 13 | Providing wall painting withh App. Quality in all complete work |
| 14 | Supply and fixing of precast RCC benches in all complete work |
| 15 | S/F of double Sqing jhula 12te in all complete work |
| 16 | S/F of seluxe jhula 12ft in all complete work |
| 17 | S/F of leg pressin in all complete work |
| 18 | S/F of air walker in all complete work |
| 19 | S/F of parallel Bar/mankey bar climber in all complete work |
| 20 | Add 18%GST Please Enable Macros to View BoQ information |