| 1 | Revised rate of timer 2025 SITC of single phase 110 Amp/115 Amp 3 pole 230 V contractor and digital time switch automatic timer for on/off system of Make LandT/CandS/Legrand complete wiring and component fitting. The job including all material, labour, erection satisfaction of Engineer-in-Charge. |
| 2 | Supply and installation of UHBVN approved electrical meter for street light cetagory of 2 kw capacity single phase as per the satisfaction of site-in-charge. All connection of the meter shall be provided by the contractor.And billing of the meter shall be done on the bases of payment slip of UHBVN. |
| 3 | Purchasing of 150 watt LED Flood light with 5 year warranty make: Phillips, Surya Roshni, Havells Note: Warranty period of LED flood lights shall be started after completion of work. |
| 4 | [10.30.1]Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 1. Light shade pigment using white cement [Through Rate] |
| 5 | [23.22.1.9]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.9. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. 4 pole MCCB 6 amp to 100 amp , 25 KA [Through Rate] |
| 6 | [23.22.2.1]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 2.1. MCCB Enclosure made of Sheet Steel suitable for mounting MCCB of following ratings MCCB up to 125 A FP [Through Rate] |
| 7 | [23.22.5.1]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.1. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp Single Pole [Through Rate] |
| 8 | [23.27.1]Supply and erection of Godrej Almirah typeM.S. pedestal made of 50 mm x 50 mm x 6 mm angle iron frame with 3.00 mm thick M.S. sheet covering including shutters with suitable hinges and locking arrangement with Godrej type handle including round bars . The top covering should have downward overhang of 75 mm on all sides of pedestal , having two sets of water proof ventilation holes of suitable size on the sides , at top and bottom , each set containing four Nos. holes to discharge the heat produced by the current . The shutters fixed with rubber gasket of superior quality and of suitable size to make it water proof . The pedestal duly painted both inside and outside with two coats of approved paint and primary coat and its legs are embeded upto the entire depth in 1:2:4 cement concrete block , projected 75 mm all around the pedestal and and 200 mm above the ground level including the cost of all labour and material required to complete the job in all respect upto the entire satisfaction of the Engineer-in-charge of the work:- 1. M.S. pedestal of size 600 mm wide , 750 mm high ,300 mm deep and bottom totally open , duly embeded in 1:2:4 cement concrete block of size 750 mm x 450 mm x 200 mm above ground level , having a base of size 900 mm x 600 mm x 250 mm below ground level. 0 0 [Through Rate] |
| 9 | [23.3.6.1]COPPER WIRING IN PVC CONDUIT (SURFACE/RECESS) 6.1. Wiring main and sub mains in two single core for phase and neutral wire and one single core for earth wire PVC insulated Copper conductor cable 1100 Volts grade in PVC Conduit etc as required. 1 run of Size 1.50 Sqmm(1/1.40mm) [Through Rate] |
| 10 | [24.1.1]EARTHING AND LIGHTENING ARRESTOR 1. Earthing with GL earth pipe 4.5 m long and 40 mm dia with masonry enclosures on the top etc. (but without charcoal or coke and salt) as required. [Through Rate] |
| 11 | [24.1.11]EARTHING AND LIGHTENING ARRESTOR 11. Providing and laying earth connections from earth electrode with 4.00 mm dia G.I. wire in 15 mm dia G.I. pipe from earth electrode as required. [Through Rate] |
| 12 | [24.1.2]EARTHING AND LIGHTENING ARRESTOR 2. Extra for using salt and char coal/coke for pipe earth electrode as required. [Through Rate] |
| 13 | [24.10.6]CIVIL ITEMS (USED COMMONLY IN ELECTRICAL WORKS) 6. Digging of pucca road in required width for laying of cable / pipe complete in all respect up to the entire satisfaction of Engineer-in charge [Through Rate] |
| 14 | [24.11.20]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING AND ERECTION/LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR CABLE 0.75 METER BELOW GROUND LEVEL COVERED WITH SAND AND BRICKS INCLUDING EXCAVATION AND REFILLING OF TRENCHES 20. 16 Sq mm 2core (Arm.) [Through Rate] |
| 15 | [24.14.7]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE ONSURFACE/ EXISTING CABLE TRAY COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 7. 6 Sq mm 2 core (UnArm.) [Through Rate] |
| 16 | [24.2.8.4]LT CABLE 8.4. Supply and erection of aluminium lugs heavy duty including crimping etc. up to the entire satisfaction of the Engineer-in-charge of the work. 16 sqmm [Through Rate] |
| 17 | [24.4.15.2]STREET LIGHT 15.2. B.S.E.N. 10025 High Masts \\"Supply, installation, testing and commissioning of 16 mtr. long High Mast manufactured from B.S.E.N. 10025 or equivalent grade material in, 2 (two) section hot dip, galvanized inside and outside in single dip, suitable for wind velocity as per IS 875 Part-3 suitable for 9/12 nos. luminaire loading fully motorized (power tool) with starter & cable complete along with standard accessories supplied by the manufacturer with 3 nos. steel wire rope double drum system and twin dome aviation light with LED without foundation but including cost of set of foundation nut and bolts, installation at site complete in all respect upto entire satisfaction of Engineer -in-ChargeThickness of Top and Bottom Section = 3 mm & 4mm (minimum)Top Dia = 150 mm and Bottom Dia = 410mmThickness of Galvanization - Top = 65 micron (minimum) and Bottom = 85 micron (minimum)\\" [Through Rate] |
| 18 | [24.4.4.4]STREET LIGHT 4.4. Erection of street light fitting on the pole including the cost of petty material required (irrespective of height/length of bracket) At Pole above 9 metres [Through Rate] |
| 19 | [24.4.9.2]STREET LIGHT 9.2. Erection of High mast ( Labour only) on existing CC foundation ( foundation to be paid separately and foundation bolt shall be provided) 16 metre High mast [Through Rate] |
| 20 | [24.5.2.3]MISCELLANEOUS ITEMS 2.3. S/E mark double walled corrugated (DWC) HDPE, pipe 10 Kg/Cm2 ,laid 0.75 Metre below ground level including digging and refilling of earth including cost of suitable size socket/coupler for HDPE pipe including the cost of labour and material required to complete the job in all respect up to the entire satisfaction of Engineer in charge of the work. DWC/HDPE pipe 63/50 mm outer dia/inner dia [Through Rate] |
| 21 | [24.9.2]RCC FOUNDATIONS FOR HIGH MAST OCTAGONAL POLES 2. Providing RCC foundation of M25 grade (1 Cement:1 Stone aggregate: 2 Coarse sand) i/c excavation, steel reinforcement (Fe 500) @ 75 kg/cum of concrete contents, concrete cover 50mm, anchor bolts etc. over a bed of PCC 1:5:10 of required dimensions for high mast octagonal poles of various heights as per following specifications complete in all respects and as per directions of Engineer-in-charge 16m high mast pole [Through Rate] Please Enable Macros to View BoQ information |