| 1 | Construction of coffer dam made of earth and protected with earth filled gunny bags/ HDPE bags placed on either side slope of coffer dam of suitable dimension as per requirement at site of work to withstand the pressure of standing/flowing water of the drain in order to keep the working area free from incoming water/water coming through any broken water mains and subsequent removal upon completion of work upto DBL of the drain to the satisfaction of the Engineer-in-charge. |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 5 | Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil. |
| 6 | Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift up to 1.5 m. All kinds of soil |
| 7 | Extra for laying concrete in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. completeNote for item No. 4.15 :- The quantity will be calculated by multiplying the depth measured from the sub-soil water level up to centre of gravity of concrete under sub-soil water level with quantity of concrete in cum executed under sub-soil water. The depth of centre of gravity shall be reckoned correct to 0.1m. 0.05m or more shall be taken as 0.1m and less than 0.05m ignored. |
| 8 | Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge.”Note : Excess/less cement used than specified in this item is payable/ recoverable separately.M-15 grade plain cement concrete (cement content considered @ 220 kg/cum)All works upto plinth level |
| 9 | Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge.”Note : Excess/less cement used than specified in this item is payable/ recoverable separately.M-10 grade plain cement concrete (cement content considered @ 220 kg/cum)All works upto plinth level |
| 10 | Centring and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns etc. for mass concrete. |
| 11 | Centring and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 12 | Centring and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform. |
| 13 | Centring and shuttering including strutting, propping etc. and removal of form for ; Columns, Pillars, Piers, Abutments, Posts and Struts |
| 14 | Centring and shuttering including strutting, propping etc. and removal of form for : Vertical and horizontal fins individually or forming box louvers band, facias and eaves boards |
| 15 | Centring and shuttering including strutting, propping etc. and removal of form for : Edges of slabs and breaks in floors and walls : Above 20 cm wide |
| 16 | Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc., including cost of de-shuttering and decentering at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be measured). : Suspended floors, roofs, landing, beams and balconies (Plan area to be measured) |
| 17 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. : Thermo -Mechanically Treated Bars. Upto Plinth |
| 18 | Providing and fixing in position 12mm thick bitumen impregnated fiber board conforming to IS: 1838, including cost of primer, sealing compound Grade-A in expansion joints. |
| 19 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately). : All works upto plinth level. |
| 20 | Extra for R.C.C./ B.M.C/ R.M.C. work above floor V level for each four floors or part thereof. |
| 21 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 22 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 23 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 24 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 25 | Providing and fixing to the inlet mouth of rain water pipe cast iron grating 15 cm diameter and weighing not less than 440 grams. |
| 26 | 12 mm cement plaster of mix : 1:6 (1 cement : 6 Coarse sand) |
| 27 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm) |
| 28 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work |
| 29 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. |
| 30 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 31 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 32 | Providing and fixing at or near ground level factory made RCC pavement slab of M-30 grade of size 450x450x50 mm, including reinforcement with 6 mm dia M.S. bars 4 nos on each side, including setting in position in footpath to the required level and line over a bed of 20 mm average thick cement mortar 1:5 (1 cement : 5 coarse sand), having joint thickness not more than 5mm except on curve, including filling of joints with same cement mortar and making grooves etc. complete as per direction of Engineer-in-charge. |
| 33 | 75 mm thick back filling for pitching including supplying of required materials and consolidation etc. complete with : Moorum |
| 34 | 75 mm thick back filling for pitching including supplying of required materials and consolidation etc. complete with : Stone aggregate 20 mm nominal size |
| 35 | 75 mm thick back filling for pitching including supplying of required materials and consolidation etc. complete with : Stone aggregate 40 mm nominal size |
| 36 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 37 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 100 mm nominal inner dia Pipes |
| 38 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-25 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). :1000 mm dia piles |
| 39 | Supply of earth including royalty excavation, loading, unloading and carriage by mechanical transport and banking the same in layer not exceeding 20cm in depth breaking clods watering rolling each layer with ½ tone roller or wooden or steel rammer sand dressing up in embankment for roads, flood banks, marginal banks and guide banks or filling up ground depressions with all lead & lifts in all kind of soil. |
| 40 | Providing and fixing neoprene bearing of approved brand and manufracture as per specification & approved drawings. |
| 41 | Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge.Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing.Note: 2. Testing agency shall submitt the design of loading platform for the approval of Engineer-in-charge.Group of two or more piles upto 50 tonne Safe capacity : Routine test (Test Load 1.5 times the Safe capacity) |
| 42 | Integrity testing of Pile using Low Strain/ Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge.Note :- The inclusion of the above item in the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project. |
| 43 | Providing and applying two coats for anti corossive treatment of reinforcement bars of corrosion inhibitor solution of approved quality and manufacture (manufacture having valid license from CECRI) Pattern No.109784/67), Kodaikamal, Tamilnadu) including making slury of cement byadding inhiibitor solution to ordinary portland cement in the ratio of 0.6:1 (i.e. 600 cc of inhibitor 1 kg of cement) as specified by the manufacturer , applying first coat of slurry uniformly on surface of reinforcement steel bars by brushing of dipping in sheds area and removing rust and iron oxide remanants etc from the bars using brush before applying the slurry and drying the coated bars on drying platform from 12-24 hours before cutting and bending and then applying second coat in the ratio of 0.45 : 1 9 i.e. 450 cc of inhibitor : 1 Kg. of cement) and drying in the same manner before placing in position. |
| 44 | Preparing the surface to ensure complete removal of mill scale by grit blasting confirming to SA 2.5 to achieve rust free surface specification and providing & applying inorganic zinc silicate & Epoxy Zine phosphate primer and Acrillic polyurethane paint finish as per specification. Please Enable Macros to View BoQ information |