| 1 | M & L for removing cables from RMU and Transporting of faulty RMU from sub station to workshop for repair after Complete repair of RMU bring back to the Station and refixing of RMU in same position after connecting Power cables in serviceable condition.Charges for arranging Temporary arrangement to connect HT cables in an IP56 encloser Junction box/panel of rating 11kV, 630A busbar arrangement to ensure that all the RMU live cables should not to be exposed to air in any on ground required for connection of Cable Contractor Should make arrangement a dangerous/unsafe condition complete all as specified and directed. |
| 2 | M & L in repairs to faulty Schneider Make, 3 Way RMU, Inspection & testing's to be done in presence of Departmental representatives. Opening the SS tank after proper disposal of SF6 gas safely, Defected spares to be replaced as per Engineer-in-charge advice.After replacement & fixing the required spare parts, SS tank to be sealed properly, Gas leakage test to be performed before SF6 Gas filling again all required testing's to be performed in presence of Departmental persons at workshop.Testing and arranging testing equipment will be in contractor scope, Repair of RMU should be done by Expertise agency locally, test reports should be produced to Engineer-in-charge complete all as specified and directed. Location- Tusali Gate |
| 3 | All as per Sl item no. 2, but in repairs to ABB Make, 6 Way RMU, Location- Pump house, Ward Room |
| 4 | All as per Sl item no. 2, but in repairs to SCHNEIDER Make, 5 Way RMU, Location- Guard Room, Friend Ship Circle |
| 5 | All as per Sl item no. 2, in repairs to SIEMENS Make, 6 Way RMU, Location-MRS |
| 6 | Note1 for Item no 2,3,4,5 :- The rate quoted shall be deemed to include for necessary T&P, nuts,bolts, washers, gaskets, insulation tape etc to put into the RMU in serviceable condition, testing and commissioning complete all as directed by the Engineer-in-Charge.(1) Preliminary inspection of 11 KV RMU with HI Voltage test for Identifying specific defects. (2) Testing of RMU CT's:- (i) IR test (ii) Primary inj test (iii) Winding resistance test (3) Testing of PTs:- (i) IR test (ii) Ratio test (iii) Polarity test. (4) Servicing of 11 KV RMU panels :-(i) cleaning panel (ii) Painting of RMU, (iii) Mechanism servicing checking the condition of other accessories (5) Replacement of minor spares like Closing coil, Tripping coil ... etc (6) IR test and HV test after completion of Job before dispatch. (7) All numerical relay in the RMU's shall be calibrated through secondary injection kit and replacement of defective relays and nessarry test report sell be submitted to the Engg-In-Charge by Contractor |
| 7 | Note 2 for Item no 2,3,4,5:-i). Preventive measures:-1. Visual inspection of RMU Panels, Covers, Insulation. 2. Cleaning of components(Busbars,Terminals,Insulators) 3. Lubrication of mechanical moving Parts.4. Checking Gas pressure and refilling if required. 5. Tightening of Electrical Connections 6. Verification of interlocks(Mechanical & Electrical) ii) Functional Testing :-1. Operation of load break Switch/VCB. 2. Testing and calibration of protection relay (Secondary injection) 3. CT & PT health Check, 4. Contact resistance measurement, 5. Insulation resistance test,6. High-Voltage with stand test. (iii) Repair & parts Replacement :- 1. Replacement of faulty CTs,PT,s relays. 2. Replacement of worn outgaskets, contacts or fuses, 3. Gas leak detection and sealing, 4. Repair/Replacement of motorized operating mechanism. |
| 8 | Note 2 for Item no 2,3,4,5:-(iv) Post- Maintenance :- 1. Functional operation check after maintenance, 2. Site acceptances test and handing over, 3. Complete RMU Painting and marking of RMU feeders, 4. Submission of service report with test result. (v). Safety and Standard -: 1. Work to be done under electrical shutdown and safety permit system, 2. Compliance with IEC62271 standards for testing and maintenance, 3. Contractor and technician must have trained and authorized person for 11 KV Operate |
| 9 | Supply and fixing of Complete PT set, including dismantling taking out complete unserviceable fixed type Single phase Epoxy resin cast potential transformer, Fix type with 11kv Anand Make HT Fuse (3.15A)Insulation level: 12 kV/28 kV rms/75 kVp,Insulation Class:B,Ratio : 11/√3 /0.11V/√3 /0.11V/√3kvV.F.- 1.2 for continuous & 1.9 for 8 Hours,Core 1 : Class – 0.5, 100VA For MeteringCore 2 : Class – 3P, 100VA For Protection |
| 10 | Supply and fixing of VPIS Standard : 3.3 to 7.7 kV suitable for ABB/Schneider/Siemens make RMU's, 11 KV 50 HZ , 630A complete all as directed by the Engineer-in-Charge |
| 11 | Supply and fixing of cable cover boots suitable for ABB/Schneider/Siemens make RMU's, 11 KV 50 HZ , 630A complete all as directed by the Engineer-in-Charge |
| 12 | Supply and fixing of Plug in type bushings of rating 630 Amps suitable for ABB make RMU's, 11 KV 50 HZ , 630A complete all as directed by the Engineer-in-Charge |
| 13 | Supply and fixing of Plug in type bushings of rating 630 Amps suitable for Schneider make RMU's, 11 KV 50 HZ , 630A complete all as directed by the Engineer-in-Charge |
| 14 | Supply and fixing of Plug in type bushings of rating 630 Amps suitable for Siemens make RMU's, 11 KV 50 HZ , 630A complete all as directed by the Engineer-in-Charge |
| 15 | Supply and fixing of Battery charger with Battery suitable for ABB/Schneider/Siemens make RMU's, 11 KV 50 HZ , 630A , arrangement of Auxiliary supply and from nearest source is in contactor scope. Note: The rate quoted shall be deemed to include for necessary T&P, nuts,bolts, washers, connecting cable from nearest LT panel, insulation tape etc to put into the RMU Relay Aux supply in serviceable condition, testing and commissioning complete all as directed by the Engineer-in-Charge |
| 16 | Supply of relay battery for RMU of size 1/2 AA type for rechargeable type Complete all as specified |
| 17 | Supply, fixing testing and commissioning in repair Dry CT , epoxy resin cast, 11 KV, dry type, indoor, 50A-25A / 1 A or 5A, window type , with core 1 class 0.5, core 2 class 5p20, for fixing in RMU's feeders as per site requirement complete all as directed by the Engineer-in-Charge |
| 18 | Supply and fixing of indication lamps of various colors for Phase,earth,and neutral as per site requirement complete all as directed by the Engineer-in-Charge |
| 19 | Supply and fixing of 3 phase digital type multifunction meter for Voltage, current, frequency, PF measurement class 0.5 with inbuilt selector switch matching the ratio of existing CTs |
| 20 | Supply and retrofit fixing of C&S make Relay in place of existing protection relay, 1A, to C&S make 11KV RMU incl necessary cutout, wiring modification, testing complete incl dismantling taking down unsv one complete all as specified and as directed.Make: C&S, SIEMENS , Schneider ,ABB or equivalent |
| 21 | Supply & replacement of existing ACSR jumper in HT 11kV Over Head line of existing 4 Pole structure , 2 pole structure , with appropriate copper conductor including bending,threading,drilling as required at site , fixing with SS nuts & bolts washers complete all as specified and directed by Engineering-in-Charge.Note:- 1.This item shall be executed immediately as and when contract is concluded2. The rate quoted shall be deemed to include for necessary Stainless Steel - T&P, nuts,bolts, washers, removing existing connected cable from 4 / 2 Pole Structure and re-connect after work has completed. |
| 22 | M&L cable end jointing kit for 11 KV grade cable heat shrinkable outdoor type joint with jointing material and accessories suitable for 3 core 120 sqmm to 185 sqmm size cable complete all as specified and directed. |