| 1 | Excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 sq m on plan and not exceeding 1.5 m in depth and getting out (in Soft loose soil). |
| 2 | Excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 sq m on plan and not exceeding 1.5 m in depth and getting out (in Mud). |
| 3 | M/L providing plain cement concrete M 10 (1:5:10) for bedding using 40 mm size and down,Graded aggregate mechanically mixed, For intercept drain pit and in Foundation, compacted by vibration including centering and shuttering works, curing etc., complete as per drawings and Technical Specification and as per the direction of Engineer. |
| 4 | M/L providing and Construction of Reinforced Cement Concrete work of M-20 grade for Base slab, footing with 20mm size IRC grade machine crushed chips and excluding cost of reinforcement and including centering and shuttering works & cost of mixing, laying , curing etc., complete as per Technical Specification and as per direction of Engineer. Note : The Contractor has to carryout dewatering time to time during execution of concerting work and upto 48 house after execution of concerting works and no extra payment for dewatering or manpower will be paid by Cantonment Board. Only ordinary Portland cement will be used for all concreting works. |
| 5 | M/L providing and Construction of Reinforced Cement Concrete work of 1:2:4 for Walls with 20mm-12.5mm size IRC grade machine crushed chips and excluding cost of reinforcement and cost of mixing, laying , curing etc., complete as per Technical Specification and as per direction of Engineer. Note : The Contractor has to carryout dewatering time to time during execution of concerting work and upto 48 hours after execution of concerting works and no extra payment for dewatering or manpower will be paid by Cantonment Board. Only ordinary Portland cement will be used for all concreting works. |
| 6 | S/f mild steel bars 8mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with mild steel wire (annealed) not less than 0.9mm dia or securing with clips. |
| 7 | Use & waste of formwork to faces of walls, retaining walls, etc vertical and columns similar work not exceeding 200 mm thick (Horizontal or sloping) fair finished surfaces all as sp. in MES SSR 2020. to batter fair finished surfaces all as sp. in MES SSR 2020. |
| 8 | Forming mortice holes, n exc. 50 cm for balusters, newels, rag-bolts, etc. and grouting with cement mortar 1:2 after balusters, etc. are fixed. |
| 9 | M/L rendering 12mm thick plaster on fair faces of brick work or concrete surfaces in 1:4 cement plaster all as sp. in MES SSR 2020. |
| 10 | Providing precast perforated drain covers suitable for medium vehicle load of size width 685 mm length 450 mm and thickness 75 mm and steel reinforcement of 8mm dia at 100 mm c/c spacing. The cover shall have minimum nine (9) round holes. The item shall include the cost of all material, transportation and fixing at site.(M-40) |
| 11 | Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 (1 cement : 3 coarse sand), finished with a floating coat of neat cement and making necessary channels for the drain etc. |
| 12 | Demolishing Reinforced brickwork or RCC in suspended slabs, beams, lintels , walls etc. in cement mortar or cement concrete (reinforcement cut as required to facilitate demolition) |
| 13 | Demolishing Brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles. |
| 14 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved upto 7 KM. |
| 15 | M/L for laying of reinforced concrete pipe class NP-2 ,450mm bore dia, laid & jointed complete with collars all as specified in MES SSR 2020. |
| 16 | M/L for laying of reinforced concrete pipe class NP-3 ,450mm bore dia, laid & jointed complete with collars all as specified in MES SSR 2020. |
| 17 | M/L for laying of reinforced concrete pipe class NP-2 ,700mm bore dia, laid & jointed complete with collars all as specified in MES SSR 2020. |
| 18 | M/L for laying of reinforced concrete pipe class NP-3 ,700mm bore dia, laid & jointed complete with collars all as specified in MES SSR 2020. |
| 19 | M/L for Providing C. concrete bed to drain pipes including packing under and haunching against the sides of pipes with concrete 1:3:6 after they are laid and tested all as specified in MES SSR, 2020. (450 mm dia) |
| 20 | M/L for Providing C. concrete bed to drain pipes including packing under and haunching against the sides of pipes with concrete 1:3:6 after they are laid and tested all as specified in MES SSR, 2020. (700 mm dia) |
| 21 | Rainwater Harvesting : Boring with drill machine (tubewell boring machine) 8” dia with 7” P.V.C. pipe casing of pressure 10 kg/Cm2, Approx depth of bore hole up 90' and slotted pipe at every sandy strata in portions upto maximum 4m (02 nos. in one pits of size 4 m x 2.10 m) outer to outer complete with exacavation, PCC bed in foundation 3” thick 1:4:8, brick works sub class ‘A’ bricks 0.23 m x 1.20 m all around, plaster in C. mortar 1:4, inside & outside above ground level all around, making channel from main nullah/drain to Rain water harvesting pit, filling pits with graded aggregate 40 mm (40 cm), 20 mm aggregate (35 cm), Coarse sand 25 cm complete all as sp. in MES SSR 2020.(Filling with packing graved all around) |
| 22 | The other works to be carried out shall be payable as per MES Schedule of rate all as specified in MES SSR 2020. Please Enable Macros to View BoQ information |