Bids Are invited for Oil And Gas Drilling Service - Onshore; Directional Drilling And Ranging Services; No - Well Design Per Sadg Well Pair , Mobilization Of Deviation Package , Mob.12.1/4Neutron Porosity ,Azimuthal Density & Calliper , Mob.8.1/2Neut
Tender Overview
Project Description
Bids Are invited for Oil And Gas Drilling Service - Onshore; Directional Drilling And Ranging Services; No - Well Design Per Sadg Well Pair , Mobilization Of Deviation Package , Mob.12.1/4Neutron Porosity ,Azimuthal Density & Calliper , Mob.8.1/2Neutron Porosity ,Azimuthal Density & Calliper , Mob. Distance And Direction To Bed Boundary Imaging Tool (Rns) For 8.1/2 Section Only 1 Set , Mob. 8 Multiple Activation Circulating Sub (Pbl) 1 Set , Mob. 6.1/2Multiple Activation Circulating Sub (Pbl) 1 Set , Mobilization Of Centrifuge , Mobilization Of Ranging Tools & Equipment With Manpower , Demobilization Of Deviation Package. , Demob.12.1/4Neutron Porosity ,Azimuthal Density & Calliper , Demob.8.1/2Neutron Porosity ,Azimuthal Density &Calliper , Demob. Distance And Direction To Bed Boundary Imaging Tool (Rns) For 8.1/2 Section Only 1 Set , Demob. 8 Multiple Activation Circulating Sub (Pbl) 1 Set , Demob. 6.1/2 Multiple Activation Circulating Sub (Pbl) 1 Set , Demobilization Of Centrifuge , Demobilization Of Ranging Tools & Equipment With Manpower , Op.Charges .Deviation Package , Op. Charges .12.1/4 Neutron Porosity ,Azimuthal Density & Calliper (Call-Out) , Op.Charges.8.1/2Neutron Porosity ,Azimuthal Density &Calliper (Call-Out) , Rate Per Drain Hole Section For Distance To Bed Boundary Imaging Tool (Rns Tool) - Call Out , Op. Charges . 8 Multiple Activation Circulating Sub (Pbl) 1 Set , Op. Charges . 6.1/2 Multiple Activation Circulating Sub (Pbl)1 Set , Operating Charges Ranging Tools & Equipment With Manpower
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 01-Jul-2026 | 15-Jul-2026 | ||
| 2 | 17-Jun-2026 | 01-Jul-2026 |
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Well Design per SADG Well Pair | Well Design per SADG Well Pair |
| 2 | MOBILIZATION OF DEVIATION PACKAGE | MOBILIZATION OF DEVIATION PACKAGE |
| 3 | MOB.12.1/4\\"NEUTRON POROSITY ,AZIMUTHAL DENSITY & CALLIPER | MOB.12.1/4\\"NEUTRON POROSITY ,AZIMUTHAL DENSITY & CALLIPER |
| 4 | MOB.8.1/2\\"NEUTRON POROSITY ,AZIMUTHAL DENSITY & CALLIPER | MOB.8.1/2\\"NEUTRON POROSITY ,AZIMUTHAL DENSITY & CALLIPER |
| 5 | MOB. DISTANCE AND DIRECTION TO BED BOUNDARY IMAGING TOOL (RNS) FOR 8.1/2\\" SECTION ONLY 1 SET | MOB. DISTANCE AND DIRECTION TO BED BOUNDARY IMAGING TOOL (RNS) FOR 8.1/2\\" SECTION ONLY 1 SET |
| 6 | MOB. 8\\" MULTIPLE ACTIVATION CIRCULATING SUB (PBL) 1 SET | MOB. 8\\" MULTIPLE ACTIVATION CIRCULATING SUB (PBL) 1 SET |
| 7 | MOB. 6.1/2\\"MULTIPLE ACTIVATION CIRCULATING SUB (PBL) 1 SET | MOB. 6.1/2\\"MULTIPLE ACTIVATION CIRCULATING SUB (PBL) 1 SET |
| 8 | MOBILIZATION OF CENTRIFUGE | MOBILIZATION OF CENTRIFUGE |
| 9 | MOBILIZATION OF RANGING TOOLS & EQUIPMENT WITH MANPOWER | MOBILIZATION OF RANGING TOOLS & EQUIPMENT WITH MANPOWER |
| 10 | DEMOBILIZATION OF DEVIATION PACKAGE. | DEMOBILIZATION OF DEVIATION PACKAGE. |
| 11 | DEMOB.12.1/4\\"NEUTRON POROSITY ,AZIMUTHAL DENSITY & CALLIPER | DEMOB.12.1/4\\"NEUTRON POROSITY ,AZIMUTHAL DENSITY & CALLIPER |
| 12 | DEMOB.8.1/2\\"NEUTRON POROSITY ,AZIMUTHAL DENSITY &CALLIPER | DEMOB.8.1/2\\"NEUTRON POROSITY ,AZIMUTHAL DENSITY &CALLIPER |
| 13 | DEMOB. DISTANCE AND DIRECTION TO BED BOUNDARY IMAGING TOOL (RNS) FOR 8.1/2\\" SECTION ONLY 1 SET | DEMOB. DISTANCE AND DIRECTION TO BED BOUNDARY IMAGING TOOL (RNS) FOR 8.1/2\\" SECTION ONLY 1 SET |
| 14 | DEMOB. 8\\" MULTIPLE ACTIVATION CIRCULATING SUB (PBL) 1 SET | DEMOB. 8\\" MULTIPLE ACTIVATION CIRCULATING SUB (PBL) 1 SET |
| 15 | DEMOB. 6.1/2\\" MULTIPLE ACTIVATION CIRCULATING SUB (PBL) 1 SET | DEMOB. 6.1/2\\" MULTIPLE ACTIVATION CIRCULATING SUB (PBL) 1 SET |
| 16 | DEMOBILIZATION OF CENTRIFUGE | DEMOBILIZATION OF CENTRIFUGE |
| 17 | DEMOBILIZATION OF RANGING TOOLS & EQUIPMENT WITH MANPOWER | DEMOBILIZATION OF RANGING TOOLS & EQUIPMENT WITH MANPOWER |
| 18 | OP.CHARGES .DEVIATION PACKAGE | OP.CHARGES .DEVIATION PACKAGE |
| 19 | OP. CHARGES .12.1/4\\" NEUTRON POROSITY ,AZIMUTHAL DENSITY & CALLIPER (CALL-OUT) | OP. CHARGES .12.1/4\\" NEUTRON POROSITY ,AZIMUTHAL DENSITY & CALLIPER (CALL-OUT) |
| 20 | OP.CHARGES.8.1/2\\"NEUTRON POROSITY ,AZIMUTHAL DENSITY &CALLIPER (CALL-OUT) | OP.CHARGES.8.1/2\\"NEUTRON POROSITY ,AZIMUTHAL DENSITY &CALLIPER (CALL-OUT) |
| 21 | RATE PER DRAIN HOLE SECTION FOR DISTANCE TO BED BOUNDARY IMAGING TOOL (RNS TOOL) - CALL OUT | RATE PER DRAIN HOLE SECTION FOR DISTANCE TO BED BOUNDARY IMAGING TOOL (RNS TOOL) - CALL OUT |
| 22 | OP. CHARGES . 8\\" MULTIPLE ACTIVATION CIRCULATING SUB (PBL) 1 SET | OP. CHARGES . 8\\" MULTIPLE ACTIVATION CIRCULATING SUB (PBL) 1 SET |
| 23 | OP. CHARGES . 6.1/2\\" MULTIPLE ACTIVATION CIRCULATING SUB (PBL)1 SET | OP. CHARGES . 6.1/2\\" MULTIPLE ACTIVATION CIRCULATING SUB (PBL)1 SET |
| 24 | OPERATING CHARGES RANGING TOOLS & EQUIPMENT WITH MANPOWER | OPERATING CHARGES RANGING TOOLS & EQUIPMENT WITH MANPOWER |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender