| 1 | Earth work excavation and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, and earth mixed with small size boulders SS.20B as per instruction by the Engineer in charge including all labour charges, leads &lifts, T&P etc., complete. |
| 2 | Providing PCC 1:3:6 using 40mm HBG metal for base course as directed by the Engineer at site, including cost of all materials, labour charges, curing, leads, lifts, etc., complete. |
| 3 | Providing Random Rubble Masonry in CM 1:5 for support wall as directed by the Engineer at site, including cost of all materials, labour charges, curing, leads, lifts, transport, etc., complete. |
| 4 | Supplying and filling with M- sand in layers for basement well rammed, watered, consolidated as directed by the Engineer at site, including cost of filling sand, cost of labour, leads, lifts, etc., complete. |
| 5 | Providing pavement with cement concrete blocks of size 80mm thick M20 Grade concrete with ani-skid surface texture including cost of all materials, preparation of basement ,all labour charges, Tools and plants, leads & lifts etc., complete. |
| 6 | Flush pointing with CM 1:3 to R.R. walls including cost of all materials, lead lift, labour charges etc., complete. |
| 7 | Plastering in C.M 1:5,12 mm thick including cost of all materials, labour charges , curing, lead, lift etc., complete. |
| 8 | Supplying fabricating and fixing of M.S structural works using M.S pipes of various sizes for columns, M.S hollow pipes of various sizes for truss, purlins and other supports etc., as directed by the Engineer at site including cost of all materials, labour charges, scaffolding, bolts and nuts, leads, lifts etc., complete. |
| 9 | Supplying and fixing of Arch colour coated galvalume sheet of 0.47mm thick of approved quality with necessary screws including cost of all materials, lead, lift, labour charges, etc., complete. |
| 10 | Providing PCC 1:2:4 (One Cement, Second sand and Four hard broken stone jelly) using 20 mm gauge hard broken including cost of all material, lead, lift, labour charges, shuttering charges etc., complete |
| 11 | Painting two coats with enamel paint with one coat of primer for new Truss works cost of all materials, lead, lift, labour charges etc., complete. |
| 12 | GST in percentage @18% Please Enable Macros to View BoQ information |