|
| 1 | SUPPLY ITEMS UNDER ARC FOR TELECOM SYSTEM |
| 2 | Supply of MPLS TP equipment |
| 3 | Supply of IP/MPLS type switch |
| 4 | Supply of converter |
| 5 | AC-DC (230 V AC to 48 V DC) |
| 6 | AC-DC (230 V AC to 24 V DC) |
| 7 | DC-DC (48 V DC to 24 V DC) |
| 8 | DC-DC (24 V DC to 48 V DC) |
| 9 | Supply of battery charger with battery backup |
| 10 | Supply of porta cabin |
| 11 | Supply of LCT |
| 12 | Supply of equipment racks |
| 13 | Supply of solar panel with battery back up 300 W |
| 14 | Supply of solar panel with battery back up 200 W |
| 15 | Supply of solar panel with battery back up 50 W |
| 16 | Supply of explosion proof telephone |
| 17 | Supply of weatherproof telephone |
| 18 | Supply of acoustic half hood booth |
| 19 | Supply of multi-paired armoured cable (10 pair) |
| 20 | Supply of 6 Twisted Pair, 1.5 Sq. mm ( 12 Core ), Individual Pair andOverall Aluminium Mylar Tape Shielded with drain wire |
| 21 | Supply of 6 Twisted Pair, 0.50 Sq. mm ( 12 Core ) Individual Pair and Overall Aluminium Mylar Tape Shielded with drain wire |
| 22 | Supply of Telemetry Interface Cabinet (TIC) |
| 23 | Supply of analog phones |
| 24 | Supply of FXO Gateway |
| 25 | Supply of FXS Gateway |
| 26 | Supply of Ethernet switch |
| 27 | Supply of RTU |
| 28 | Supply of mini RTU |
| 29 | Supply of FTC |
| 30 | Supply of joint closures |
| 31 | Supply of IP camera |
| 32 | Supply of spares for telecom |
| 33 | Supply of spares for RTU |
| 34 | Supply of ethernet to serial converter |
| 35 | Supply of optical to serial convereter |
| 36 | Supply of RS 232 to RS 422/RS485 converter |
| 37 | Supply of Optical to Ethernet Converter |
| 38 | Supply of Out door equipment panel |
| 39 | Supply of Field Mounted enclosure conforming IP-66 |
| 40 | Supply of GPRS Modem |
| 41 | Supply of ATEX switch 8 port |
| 42 | Supply of 24F OFC cable |
| 43 | Supply of RTU management licenses for makes like Husky, Schneider, etc |
| 44 | Telecom system (WORKS) |
| 45 | Installation of MPLS/TP equipment |
| 46 | Integration of MPLS/TP equipment with existing NMS |
| 47 | Installation and commissioning of solar system |
| 48 | Installation of porta cabin |
| 49 | Laying and termination of multi-paired armoured cable (10 pair) |
| 50 | Installation and configuration of converter/switch and interfacing of same with flow computer and integration with SCADA system |
| 51 | Installation of TIC Panel |
| 52 | Design, engineering and submission of documents |
| 53 | Testing of OFC and submission of reports |
| 54 | Earthing works |
| 55 | Installation testing & commissioning of Instrumentation Cable |
| 56 | Installation commissioning and integration of RTUs in existing SCADA Server |
| 57 | Installation commissioning and integration of mini RTUs in existing SCADA Server |
| 58 | Installation and integration of IP cameras in existing server for each cameras |
| 59 | Installation of GPRS Modems if supplied as Free Issue |
| 60 | Extending of leased lines for 1000 km distance including modems (one ethernet interface & one E1 interface for LAN) at both ends |
| 61 | Rectification of OFC including supply of joint pit with identification of fault and testing of OF cable |
| 62 | Installation of outdoor panel |
| 63 | Transportation charges for Free Issue Material (per Km rate to be quoted) |
| 64 | Laying of OFC through HDD method |
| 65 | Laying of OFC through direct trench method |
| 66 | Point to Point Radio communication (2.4/5.8 GHz licence free ISM band) |
| 67 | Laying of OFC Cable ( if OFC supplied as free issue by GAIL) |
| 68 | Blowing of OFC in duct |
| 69 | Manday Charges [Post-installation manday charges for RTU/Telecom works on an on-call basis, including troubleshooting, system calibration, software updates, configuration adjustments, and performance optimization.”] |
| 70 | Total amount excluding GST |
| 71 | GST (CGST&SGST/UTGST or IGST) in percentage (%) on Net Total Amount Please Enable Macros to View BoQ information |