|
| 1 | Working charges |
| 2 | 100.47.2.6:Leak rectification work in 200mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing. |
| 3 | 100.47.2.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing. |
| 4 | 100.47.2.3:Leak rectification work in 140mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing. |
| 5 | 100.47.2.2:Leak rectification work in 110mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing. |
| 6 | 100.47.2.1:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing. |
| 7 | 100.47.1.6:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 8 | 100.47.1.5:Leak rectification work in 75mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 9 | 100.47.1.4:Leak rectification work in 63mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 10 | 100.47.1.3:Leak rectification work in 50mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 11 | 100.47.1.2:Leak rectification work in 40mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 12 | 100.47.1.1:Leak rectification work in 32mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 13 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 14 | OD30459/2026-2027:Charges for cleaning the valve chamber and protection tube after dismantling the heavy type RCC cover slab and disposing the slushy soil 50 meters away from chamber |
| 15 | OD30461/2026-2027:Rectification of gland leakage in various size of valves in the distribution line and pumping main including hire for tools etc. complete but excluding cost of specials |
| 16 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge |
| 17 | 100.58.1:Rectifying the leakages in vertical pipe of public tap connection including earth work excavation in all kinds of soil for exposing the pipeline including concrete / tar cutting, cutting and removing damaged portion of pipe, fixing new 20/25 mm GI pipe and specials in place of damaged portion of pipe and connecting with existing pipe line, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and specials and as per the direction of departmental officers etc. complete. |
| 18 | 100.57.1:Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete. |
| 19 | 100.56.1:Supplying and fixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for tools and as per the direction of the department officers etc complete. |
| 20 | OD30460/2026-2027:Supplying and providing Shellmac instant repair preemix at tar cutting area |
| 21 | 100.98.1008:Engaging Coolie. |
| 22 | Cost of Materials |
| 23 | OD30456/2026-2027:Supplying 200 mm Repairable Joint |
| 24 | OD30455/2026-2027:Supplying 160 mm Repairable Joint |
| 25 | OD30454/2026-2027:Supplying 140mm Repairable Joint |
| 26 | OD30458/2026-2027:Supplying 110mm Repairable Joint |
| 27 | OD30457/2026-2027:Supplying 90mm Repairable Joint |
| 28 | 100.98.230:Supply of PVC Pipe, 10kg/cm2, 25mm Dia. |
| 29 | 100.98.18:Supply of Quarry Muck. Please Enable Macros to View BoQ information |