| 1 | Crusher Run Macadam Sub Base/Base Course Providing crushed stone aggregate, depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a vibratory roller as per clause 410 to form a layer of sub-base/Base in accordance to Table No. 400-14, 400-15 and as per clause of section 407 of specifications. (ii) For 37.5 mm maximum size |
| 2 | Construction of Shoulders with approved material/selected soil i/c excavation all lifts & leads i/c grading to required slope & camber of 4% and compacting on OMC using vibratory roller of 80 to 100 kN static weight. Field compaction shall be done in corresponding layers of carriage way thickness and meet the requirements of MDD to achieve compaction (98% -100%) as per relevant clause of 408.A Hard Shoulders (CBR value >12) |
| 3 | Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade or drainage layer with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver finisher with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect |
| 4 | Deduct from Item No.6.1 above if paver finisher with electronic sensor is not used and laying, (The acceptance criteria regarding level, thickness, surface regularity, texture finish, strength of concrete and all other quality control measures shall be the same as in case of machine laid work.) |
| 5 | Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement with M-30 grade concrete over a prepared sub base with cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with electronic sensor slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC-15-2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bars and tie rods etc. including groove cutting for width of 4 mm- 6mm and 1/3rd depth of PQC within 8-10 hrs of placing/ finishing of PQC including cost of cutting including cleaning of groove and providing approved sealant filling etc. as per clause 602.2.10 and 600.10 and IRC-57-2006 as per drawing and as per specification. |
| 6 | Deduct from Item No.6.3 & 6.4 above if slip form paver with electronic sensor is not used and laying, compaction is done by fix form paver having 60 mm vibratory needle @ 2 Nos. per metre. (The acceptance criteria regarding level, thickness, surface regularity, texture finish, strength of concrete and all other quality control measures shall be the same as in case of machine laid work.) |
| 7 | Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Suitable Excavated material to be used in embankment within a lead of 50 meters as per relevant clauses of section-300. |
| 8 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal up to 1000 meters. Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting suitable earth to the embankment location and disposing off unsuitable earth with all lifts and lead up to 1000m as per relevant clauses of section-300 of specification |
| 9 | Providing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with.(i) Concrete with plant (Drum Type) and placingA PCC Grade M15 |
| 10 | Providing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with.(i) Concrete with plant (Drum Type) and placingB PCC Grade M20 |
| 11 | PCC M-15 in Foundation Plain cement concrete M-15 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per MORT&H Specification 409. |
| 12 | Providing P.C.C. M-15 Nominal mix for hume pipe culverts in foundation and sub structure etc. as per drawing and as per relevant clauses of section 1500, 1700, 2100 and 2900. |
| 13 | Providing and Laying Reinforced Cement Concrete Pipe NP 4 /prestrssed concrete pipe on first class bedding in double row. Providing and Laying Reinforced cement concrete pipe NP4 /prestrssed concrete pipe for culverts on first class bedding of granular aterial (cost of bedding included) in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. B 1000 mm dia |
| 14 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications Concrete with plant (Drum Type) and placingA PCC Grade M15 |
| 15 | Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications and as per relevant clause of section 1600.FE 500 |
| 16 | Providing Plain cement concrete M-15 nominal mix in foundation as per relevant clauses of sections 1500, 1700 and 2100. |
| 17 | Providing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with.(i) Concrete with plant (Drum Type) and placingC RCC Grade M20 |
| 18 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications. |
| 19 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification and as per relevant clauses 305 of specifications and as per ppendix 6 of IRC-78.A Granular material |
| 20 | Providing and Laying Reinforced Cement Concrete Pipe NP4/prestrssed oncrete pipe on first class bedding in single row. Providing and Laying Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of ranular material (cost of bedding included) in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. A 600 mm dia |
| 21 | Supply of following material including all lead and stacking etc. complete.(i) Crusher stone dust |
| 22 | Supply of following material including all lead and stacking etc. complete.(iii) Moorum with CBR not less than 20 and P.I. Not exceeding 6. Please Enable Macros to View BoQ information |