| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position specified grade of RCC including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Reinforcement of R.C.C work including straightening, cutting, bending, placing in position and binding all complete with Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in:Cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level |
| 9 | Providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers: |
| 10 | 12mm plaster in 1:6 mix on masonary walls. |
| 11 | 6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand) |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form for:Lintel, beams, plinth beams, girders, bressumers and cantilevers. |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. |
| 15 | Centering and shuttering including strutting, propping etc. and removal of form work for: Columns, piers, abutments, pillars, posts and struts |
| 16 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.2 mm thick |
| 17 | Wall Painting with acrylic emulsion paint of approved brand and manufacture to give an even shade. Two or more coats on new work |
| 18 | Removal of excavated mulba dismantled or unservicable material from the site of work by mechanical transport or animal transport or otherwise including loading/unloading (complete job) |
| 19 | Carriage of materials by mechanical transport including loading / unloading & stacking complete stone aggregate below 40mm nominal size for an average distance of 10 kms. |
| 20 | Carriage of materials by mechanical transport including loading / unloading & stacking complete sand below 40mm nominal size for an average distance of 10 kms. |
| 21 | Carriage of materials by mechanical transport including loading / unloading & stacking complete sand for an avg distance of 10kms |
| 22 | Demolishing RCC work manually/by mechanical means including stacking of steel bars and disposal of unservicable material within 50m lead as per direction of engineer incharge |
| 23 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) |
| 24 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge(in Cement mortar) |
| 25 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer Please Enable Macros to View BoQ information |