|
| 1 | Services – Removal of existing cables (up to 3 sq mm) | Services – Removal of existing cables (up to 3 sq mm) |
| 2 | Services - Removal of existing cables (up to 3.1 – 6.5 sq mm) | Services - Removal of existing cables (up to 3.1 – 6.5 sq mm) |
| 3 | Services - Removal of existing cables (6.6 – 16 sq mm) | Services - Removal of existing cables (6.6 – 16 sq mm) |
| 4 | Services - Removal of existing cables (16.1 – 35.0 sq mm) | Services - Removal of existing cables (16.1 – 35.0 sq mm) |
| 5 | Services - Removal of existing cables (35.0 – 70 sq mm) | Services - Removal of existing cables (35.0 – 70 sq mm) |
| 6 | Services - Removal of existing cables (70.1 – 120 sq mm) | Services - Removal of existing cables (70.1 – 120 sq mm) |
| 7 | Services – Removal of RF Cable | Services – Removal of RF Cable |
| 8 | Services – Removal of HV Cable | Services – Removal of HV Cable |
| 9 | Services – Removal of Telephone exchange Cable | Services – Removal of Telephone exchange Cable |
| 10 | Services – Removal of Fiber optics Cable | Services – Removal of Fiber optics Cable |
| 11 | Services – Removal of Ethernet cable Cable | Services – Removal of Ethernet cable Cable |
| 12 | Services – Removal of Cable Trays including Hot work assistance | Services – Removal of Cable Trays including Hot work assistance |
| 13 | Services – Removal of metal conduits along with (10 mm-75 mm) associated with clamps | Services – Removal of metal conduits along with (10 mm-75 mm) associated with clamps |
| 14 | Material – Metal building at rusted/perished conduits joints (Material SS/MS) | Material – Metal building at rusted/perished conduits joints (Material SS/MS) |
| 15 | Service - Metal building at rusted/perished conduits joints (Material SS/MS) | Service - Metal building at rusted/perished conduits joints (Material SS/MS) |
| 16 | Material – Laying of 26-75 mm dia conduits (Material Ms along with associated clamps | Material – Laying of 26-75 mm dia conduits (Material Ms along with associated clamps |
| 17 | Service - Laying of 26-75 mm dia conduits (Material Ms along with associated clamps | Service - Laying of 26-75 mm dia conduits (Material Ms along with associated clamps |
| 18 | Material - Laying of 10-25 mm dia conduits (Material Ms along with associated clamps | Material - Laying of 10-25 mm dia conduits (Material Ms along with associated clamps |
| 19 | Service - Laying of 10-25 mm dia conduits (Material Ms along with associated clamps | Service - Laying of 10-25 mm dia conduits (Material Ms along with associated clamps |
| 20 | Material – Manufacturing of Cable Trays (20 mm) | Material – Manufacturing of Cable Trays (20 mm) |
| 21 | Material – Manufacturing of Cable Trays (21-40 mm) | Material – Manufacturing of Cable Trays (21-40 mm) |
| 22 | Material – Manufacturing of Cable Trays (41-60 mm) | Material – Manufacturing of Cable Trays (41-60 mm) |
| 23 | Material – Manufacturing of Cable Trays (61-80 mm) | Material – Manufacturing of Cable Trays (61-80 mm) |
| 24 | Material – Manufacturing of Cable Trays (Above 80 mm) | Material – Manufacturing of Cable Trays (Above 80 mm) |
| 25 | Service – Renewal of Cable Trays (20 mm) (Provisioning & Installation including Hot Work) | Service – Renewal of Cable Trays (20 mm) (Provisioning & Installation including Hot Work) |
| 26 | Service - Renewal of Cable Trays (21-40 mm) (Provisioning & Installation including Hot Work) | Service - Renewal of Cable Trays (21-40 mm) (Provisioning & Installation including Hot Work) |
| 27 | Service - Renewal of Cable Trays (41-60 mm) (Provisioning, Installation and removal of old cables trays including Hot Work) | Service - Renewal of Cable Trays (41-60 mm) (Provisioning, Installation and removal of old cables trays including Hot Work) |
| 28 | Service - Renewal of Cable Trays (61-80 mm) (Provisioning & Installation including Hot Work) | Service - Renewal of Cable Trays (61-80 mm) (Provisioning & Installation including Hot Work) |
| 29 | Service - Renewal of Cable Trays (Above 80 mm) (Provisioning & Installation including Hot Work) | Service - Renewal of Cable Trays (Above 80 mm) (Provisioning & Installation including Hot Work) |
| 30 | Service – Breaking of existing glands while laying cables | Service – Breaking of existing glands while laying cables |
| 31 | Service – Manufacturing of deck tubes and Bulkhead glands of material SS and fitment of the same. The glands are to be repacked post cable laying and proven during air pressure test (APT) of the submarine | Service – Manufacturing of deck tubes and Bulkhead glands of material SS and fitment of the same. The glands are to be repacked post cable laying and proven during air pressure test (APT) of the submarine |
| 32 | Service – Manufacture of Fitment of new MCT glands while laying cables | Service – Manufacture of Fitment of new MCT glands while laying cables |
| 33 | Service – Laying out of Multicore Weapon cables (upto 25 core screened cable). Cables are to be routed through the proposed cable routes (Laying, Dressing, and Clamping) | Service – Laying out of Multicore Weapon cables (upto 25 core screened cable). Cables are to be routed through the proposed cable routes (Laying, Dressing, and Clamping) |
| 34 | Service - Laying out of Multicore Weapon cables (26-48 core screened cable). Cables are to be routed through the proposed cable routes (Laying, Dressing, and Clamping) | Service - Laying out of Multicore Weapon cables (26-48 core screened cable). Cables are to be routed through the proposed cable routes (Laying, Dressing, and Clamping) |
| 35 | Service - Laying out of Multicore Weapon cables (upto 49 core screened cable). Cables are to be routed through the proposed cable routes (Laying, Dressing, and Clamping) | Service - Laying out of Multicore Weapon cables (upto 49 core screened cable). Cables are to be routed through the proposed cable routes (Laying, Dressing, and Clamping) |
| 36 | Service - Laying out of RF cables. Cables are to be routed through the proposed cable routes. (Laying, Dressing, and Clamping) | Service - Laying out of RF cables. Cables are to be routed through the proposed cable routes. (Laying, Dressing, and Clamping) |
| 37 | Service -Laying out of HV cables. Cables are to be routed through the proposed cable routes. (Laying, Dressing, and Clamping) | Service -Laying out of HV cables. Cables are to be routed through the proposed cable routes. (Laying, Dressing, and Clamping) |
| 38 | Service - Laying out of Telephone cables. Cables are to be routed through the proposed cable routes. (Laying, Dressing, and Clamping) | Service - Laying out of Telephone cables. Cables are to be routed through the proposed cable routes. (Laying, Dressing, and Clamping) |
| 39 | Service - Laying out of Fiber optic cables. Cables are to be routed through the proposed cable routes. (Laying, Dressing, and Clamping) | Service - Laying out of Fiber optic cables. Cables are to be routed through the proposed cable routes. (Laying, Dressing, and Clamping) |
| 40 | Service - Laying out of Ethernet cables. Cables are to be routed through the proposed cable routes. (Laying, Dressing, and Clamping) | Service - Laying out of Ethernet cables. Cables are to be routed through the proposed cable routes. (Laying, Dressing, and Clamping) |
| 41 | Service - Laying out of Weapon Power Cables 2/3 core. Cables are to be routed through the proposed cable routes. (Laying, Dressing, and Clamping) | Service - Laying out of Weapon Power Cables 2/3 core. Cables are to be routed through the proposed cable routes. (Laying, Dressing, and Clamping) |
| 42 | Service – Connectorisation of (above 27) multicore cable (soldering/crimping) with associated cable booting for the same. | Service – Connectorisation of (above 27) multicore cable (soldering/crimping) with associated cable booting for the same. |
| 43 | Service - Connectorisation of 20-26 multicore cable (soldering/crimping) with associated cable booting for the same. | Service - Connectorisation of 20-26 multicore cable (soldering/crimping) with associated cable booting for the same. |
| 44 | Service - Connectorisation of 14-19 multicore cable (soldering/crimping) with associated cable booting for the same. | Service - Connectorisation of 14-19 multicore cable (soldering/crimping) with associated cable booting for the same. |
| 45 | Service - Connectorisation of 7-13 multicore cable (soldering/crimping) with associated cable booting for the same. | Service - Connectorisation of 7-13 multicore cable (soldering/crimping) with associated cable booting for the same. |
| 46 | Service - Connectorisation of 6 multicore cable (soldering/crimping) with associated cable booting for the same. | Service - Connectorisation of 6 multicore cable (soldering/crimping) with associated cable booting for the same. |
| 47 | Service - Connectorisation of 4 core cable (soldering/crimping) with associated cable booting for the same. | Service - Connectorisation of 4 core cable (soldering/crimping) with associated cable booting for the same. |
| 48 | Service - Connectorisation of 1-3 core cable (soldering/crimping) with associated cable booting for the same. | Service - Connectorisation of 1-3 core cable (soldering/crimping) with associated cable booting for the same. |
| 49 | Service - Connectorisation of Power Supply cables (soldering/crimping) with associated cable booting for the same. | Service - Connectorisation of Power Supply cables (soldering/crimping) with associated cable booting for the same. |
| 50 | Service - Connectorisation of RF cable (soldering/crimping) with associated cable booting for the same. | Service - Connectorisation of RF cable (soldering/crimping) with associated cable booting for the same. |
| 51 | Service - Connectorisation of HV cable (soldering/crimping) with associated cable booting for the same. | Service - Connectorisation of HV cable (soldering/crimping) with associated cable booting for the same. |
| 52 | Service - Connectorisation of Telephone cable (soldering/crimping) with associated cable booting for the same. | Service - Connectorisation of Telephone cable (soldering/crimping) with associated cable booting for the same. |
| 53 | Service - Connectorisation of Fiber optics cable with associated cable booting for the same. | Service - Connectorisation of Fiber optics cable with associated cable booting for the same. |
| 54 | Service - Connectorisation of Ethernet cable with associated cable booting for the same. | Service - Connectorisation of Ethernet cable with associated cable booting for the same. |
| 55 | Material – Sealing & grounding the conduit at the both ends. | Material – Sealing & grounding the conduit at the both ends. |
| 56 | Service - Sealing & grounding the conduit at the both ends. | Service - Sealing & grounding the conduit at the both ends. |
| 57 | Service – Manufacturing and fitment of metallic clamp for fitment of cables and grounding strap for all screened cable | Service – Manufacturing and fitment of metallic clamp for fitment of cables and grounding strap for all screened cable |
| 58 | Service – Provisioning and fitment of earthing cables | Service – Provisioning and fitment of earthing cables |
| 59 | Service – Delagging of area to make access for shifting of equipment and laying of cables | Service – Delagging of area to make access for shifting of equipment and laying of cables |
| 60 | Service – Relagging of area post shifting of equipment and cables. | Service – Relagging of area post shifting of equipment and cables. |
| 61 | Service – Manufacturing and fitment of cable tallies 6x3x0.5 cm – Aluminium (punched) | Service – Manufacturing and fitment of cable tallies 6x3x0.5 cm – Aluminium (punched) |