| 1 | Operation Work: | Operation Work: |
| 2 | Provision of operator/skilled manpower for operation and monitoring of HVAC system of Anuprabha Bhavan, Anudisha Bhavan and simulator building at KAPS-3&4. | Provision of operator/skilled manpower for operation and monitoring of HVAC system of Anuprabha Bhavan, Anudisha Bhavan and simulator building at KAPS-3&4. |
| 3 | Provision of helper/unskilled manpower to assist the operator defined in task 1.1 | Provision of helper/unskilled manpower to assist the operator defined in task 1.1 |
| 4 | Contingency jobs for operator/ skilled manpower as per tender specification. | Contingency jobs for operator/ skilled manpower as per tender specification. |
| 5 | Maintenance Work: | Maintenance Work: |
| 6 | Internal cleaning and inspection of condenser. For detailed specification refer section-V | Internal cleaning and inspection of condenser. For detailed specification refer section-V |
| 7 | Internal cleaning and inspection of evaporator. For detailed specification refer section-V | Internal cleaning and inspection of evaporator. For detailed specification refer section-V |
| 8 | Overhauling of cooling tower unit. For detailed specification refer section-V | Overhauling of cooling tower unit. For detailed specification refer section-V |
| 9 | Overhauling of refrigerant compressor. In case of spare part consumption, payment of spare parts shall be made as per SOQR items serial nos. 3 | Overhauling of refrigerant compressor. In case of spare part consumption, payment of spare parts shall be made as per SOQR items serial nos. 3 |
| 10 | Provision of Supply | Provision of Supply |
| 11 | Loading and unloading slider ring set for Semi hermetic screw compressor compatible with the installed compressors as mentioned in section-V (the item will be supplied in the case of failure/maintenance and job will be executed through SOQR item nos. 2.4) | Loading and unloading slider ring set for Semi hermetic screw compressor compatible with the installed compressors as mentioned in section-V (the item will be supplied in the case of failure/maintenance and job will be executed through SOQR item nos. 2.4) |
| 12 | Loading and unloading slider ring with rod set for Semi hermetic screw compressor compatible with the installed compressors as mentioned in section-V (the item will be supplied in the case of failure/maintenance and job will be executed through SOQR item nos. 2.4) | Loading and unloading slider ring with rod set for Semi hermetic screw compressor compatible with the installed compressors as mentioned in section-V (the item will be supplied in the case of failure/maintenance and job will be executed through SOQR item nos. 2.4) |
| 13 | Compressor O-ring/gasket set for Semi hermetic screw compressors compatible with the installed compressor as mentioned in section-V (the item will be supplied in the case of failure/maintenance and job will be executed through SOQR item nos. 2.4) | Compressor O-ring/gasket set for Semi hermetic screw compressors compatible with the installed compressor as mentioned in section-V (the item will be supplied in the case of failure/maintenance and job will be executed through SOQR item nos. 2.4) |
| 14 | Screw compressor oil (CPI-120) | Screw compressor oil (CPI-120) |