| 1 | Dismantling interconnection between equipments using ACSR Moose/ Kundah/ wolf Single conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. |
| 2 | Stringing and fixing earth wire of size 7/9, 7/10 or 7/3.15 between top of the columns and to terminal tower at 33/66/110/220KV substations with compressed / bolted ends at proper tension including uncoiling and cutting of conductor , jumpering, giving earth bond connections by drawing the end of the conductor through the columns, jointing wherever necessary providing back stays at the time of stringing etc. as per the direction of the departmental officers. |
| 3 | Dismantling earth wire of size 7/9, 7/10 or 7/3.15mm from the top of columns andterminal tower of 33/66/110/220kV substations, including transportation of materials to the stockyard from the site with an initial lead of 50m under the supervision and direction of department staff at site. |
| 4 | Dismantling the droppers and connection from lines / equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolf Single conductor at both ends with compressed/ bolted ends, (for one phase) including transportation of materials to the stockyard from the site with an initial lead of 50m under the supervision and direction of department staff at site. |
| 5 | Providing droppers and connecting to lines / equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolf rSingle conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase) |
| 6 | Dismantling the droppers and connection from lines / equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolf Double conductor at both ends with compressed/ bolted ends, (for one phase) including transportation ofmaterials to the stockyard from the site with an initial lead of 50m under the supervision and direction of department staff at site. |
| 7 | Providing droppers and connecting to lines / equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolf Double conductor at both ends with compressed/ bolted ends , fixing spacers at regular intervals as directed, including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase) |
| 8 | Dismantling bus bar of ACSR Kundah Moose Doubleconductor for one phase of 110kV bus of span up to 35m including the insulator discs,including transportation of materials to the stockyard from the site with an initial lead of 50m under the supervision and direction of department staff at site. |
| 9 | Providing droppers and connecting to lines / equipments or jumper between two buses with out suspension insulators for 220/110kV using ACSR Bersimis triple conductor at both ends with compressed/ bolted ends, fixing spacers at regular intervals as directed, including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase) |
| 10 | Dismantling of droppers from bus to equipment with necessary suspension insulators using ACSR Moose/Kundah double conductor |
| 11 | Providing interconnection between equipments using ACSR triple bersimis conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. |
| 12 | Dismantling of droppers from bus to equipment with necessary suspension insulators using ACSR Moose/Kundah single conductor. |
| 13 | Providing droppers and connecting to lines / equipments or jumper between two buses with neccessary suspension insulators for 220kV/110kV using ACSR Bersimis tripleconductor at both ends with compressed/ bolted ends, fixing spacers at regularintervals as directed, including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase) |
| 14 | Uncoiling, paving out,stringing and fixing of bus bar using ACSR Bersimis Triple conductor for one phase of 110kV bus of span up to 35M by cutting the conductor to sufficient length, crimping using compressor / bolting the six ends, washing, cleaning and drying the composite insulator, fixing the conductors to the 110kV yard structure with sufficient tension using string of double tension insulators and hardwares complete. at fourends, fixing of arcing hornes at both ends, fixing of spacers between three conductors at regular intervals as specifiedby the dept. staff at site, including transportation of materials from the stockyard to the site under the supervision and direction of department staff at site. (All materials will be supplied departmentally at free of cost). Please Enable Macros to View BoQ information |