Name of Work:- GENERAL-ASE Work -Reformation of the damaged sea wall south of CP 2399 at Neerozhukkumchal in Madayi Gramapanchayath in Kannur District -General Civil Work
Sl. No.
Item Description
1
ASE Work
2
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
3
60.30.8:A.S.E -Reformation works - Kannur - Supplying quarry run varying in size upto 15cm.max for filter and stacking the same for measurement
4
60.34.8:A.S.E Reformation work- Kannur -Supplying at site of work,granite stones20 to40 dm3 in size , including stacking for measurement.
5
60.36.8:A.S.E Reformation work- Kannur -Supplying at site of work,granite stones 45 dm3 in size , including stacking for measurement.
6
60.40.8:A.S.E -Reformation work- Kannur- Supplying at site of work granite rubble 200 dm3 in size as nearly cubical as possible the minimum dimension in any of the three perpendicular directions passing through the centre of gravity of each individual stone being not less than 45 cm including loading and unloading charges etc. and marking with distinguishing number on three faces with paint etc complete .
7
60.41:Dumping in position(not to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
8
60.42:Dumping in position( to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
9
60.43:Unified Data A.S.E work- Carriage of departmental quarry run from stack at site to the place of dumping and laying and packing to uniform thickness of 30cm from the filter of the sea wall including all leads and lifts etc. complete as per the directions of departmental officers at site.
10
60.45:Unified Data for A.S.E works - Conveyance of departmental granite stones 20 to 40 dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts, etc. complete as per the directions of the departmental Officers at site.
11
60.46:Unified Data for A.S.E work - Conveyance of departmental granite stones 45dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts , etc. complete as per the directions of the departmental Officers at site. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.