| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :– |
| 2 | A) PCC pole 8.5/11 mtr long./STP Pole 11 mtr. Long |
| 3 | Cartage of line material from store centre to dump site & then dump site to sire of work on day to day basis, including loading & unloading at both ends maximum distance up to 20 Km. |
| 4 | Cartage of following from dump site to site of work on day to day basis including loading & unloading at both ends maximum distance up to 20 Km :–A) PCC pole 8.5/11 mtr long./STP Pole 11 mtr. Long |
| 5 | Dismantling of damage PCC pole/DP of 33 kv line & HT/LT line after opening the bindings of damage poles. |
| 6 | Erection of PCC Pole 8.5/11 mtr long/STP pole 11 mtr. long after digging a pits of required size with fixing HT/LT line accessories complete. |
| 7 | Mounting of 25 to 100 KVA Transformer on DP as site |
| 8 | Replacement of damaged 11 kv cross arm along with pin insulator. |
| 9 | Replacement of damaged 11 kv disc insulator. |
| 10 | Laying lifting, sagging & binding properly of ACSR weasel conductor 33 kv/11 kv & HT/LT Lines. |
| 11 | Resagging of loos span of 11 kv lines after opening the bindings. |
| 12 | Resagging of loos span of LT lines after opening the bindings. |
| 13 | Cutting and chopping of tree branches of 11 & 33 KV line at different places. (5 tree in one Job) |
| 14 | Replacement of damaged 11 kv pin insulator with new. |
| 15 | Grouting of PCC/ST poles with Dust, Cement & Stone blast concreting. |
| 16 | Guarding of line with G.I. wire, 8 SWG and 10 SWG having 2 no horizontal wire & 3 Mtr. distance of laces of ten 8 SWG G.I wire after fixing the guard cross arm. |
| 17 | Fixing of stay set with stay pin insulator. |
| 18 | Providing & fixing of 11 kv :-(A) Holding clamps |
| 19 | (B) F clamps |
| 20 | (C) Pin clamps |
| 21 | (D) Stay clamps |
| 22 | Providing & fixing of LT pin insulator. |
| 23 | Providing & fixing of Off size Nut & Bolt. |
| 24 | Repairing of damaged Guarding of 11 KV line including laying, lifting, sagging and binding properly. |
| 25 | Straightening of tilted/bended pole. |
| 26 | Resagging of loos sagg of 33 KV line. |
| 27 | Tilted of support of 33 KV line. |
| 28 | Reconstruction of damage double pole after opening the bindings. |
| 29 | Back cartage of damaged T/f from site to store centre meerut Please Enable Macros to View BoQ information |