| 1 | Excavation of pole pit for pole upto 8.00m length by using JCB/Manual |
| 2 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual |
| 3 | Excavation of pole pit for pole above 8.00m length by using JCB/Manual |
| 4 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
| 5 | Erection of metal supports above 9m/RSJ/Rail Pole/Tubular poles |
| 6 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual |
| 7 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.. |
| 8 | Fixing of V Cross Arm/Tapping X-Arm/Guarding X-Arm |
| 9 | Fixing of HT/LT TI Fitting |
| 10 | Fixing of 11 KV Pin Insulator |
| 11 | Fixing of 11 KV Strain Disc |
| 12 | Fixing of LT 1 phase cross arm |
| 13 | Fixing of LT 3 phase cross arm |
| 14 | Fixing of LT Shackle |
| 15 | Fixing of LT Pin Insulator |
| 16 | Fixing of Alu Knob |
| 17 | Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or Other equivalent conductor |
| 18 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR up to 7/3.35 mm conductor or other equivalent conductor |
| 19 | Transportation of all type of poles and sizes of poles including loading and unloading of poles from road side to pole pit and vice versa upto 5 KM |
| 20 | Transportation of all type of poles and sizes of poles including loading and unloading of poles from road side to pole pit and vice versa above 5 KM (5X75=Rs.375) |
| 21 | Loading and Unloading of line materials |
| 22 | (i) Transporting of Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
| 23 | Earthing Per Pole |
| 24 | Concreting Per Pole |
| 25 | Loading and Unloading of Distribution Transformer (ii) Above 100 KVA to 500 KVA |
| 26 | Transporting of Distribution Transformer from stores to office /site upto 10 KM distance by engaging 1 Ton Capacity Minidor (Lorry) |
| 27 | Dismantling of RCC,REC,PSC & metal pole of all sizes including the closing of the pit |
| 28 | Erection of DP structure with stay as per TNEB standard including of top channel, cross bracing, concreting, painting, colour washing etc.., (i) With 11 KV AB Switch using all types of poles of size 9 m and above length |
| 29 | Dismantling of DT (i) Upto 100 KVA |
| 30 | G.S.T. @18% should be Entered by the Bidder Please Enable Macros to View BoQ information |