| 1 | Overhauling of 3 Ton capacity Hoist: Charges for Dismantling the 3 Ton capacity electrical hoist withtrolley fromt the existing beams by loosening the fixing bolt and nuts leading,lifting and lowering the hoist from its position to ground floor by using chain block. (Approximate height:25 mtr) |
| 2 | Charges for draining the duty oil from the gear box by opening the top cover after loosening the fixing bolts and nuts. |
| 3 | Charges for overhauling the hoist by dismantling the parts, cleaning and inspection, reassembly with new oil seal and gasket, greasing the wire rope and filling of oil in the gear box of 3 ton capacity hoists. |
| 4 | Charges for dismantling of rope drum, inspection, cleaning and applying compound & re winding the steel wire rope and assembling the drum with hoist. |
| 5 | Charges for cleaning of all electrical accessories such as motors contactors,push buttons,limit switches, panel etc., and checking for proper operation. |
| 6 | Dismantling and Overhauling of raise/lower and long travel motors of hoist Dismantling and re-erection of raise/lower motor (3Ton-2.25KW) |
| 7 | Overhauling of raise/lower motor 3 Ton - 2.25 KW) |
| 8 | Dismantling and re-erection of long travel motor (3 Ton - 0.75 KW) |
| 9 | Overhauling of long travel motor (3Ton-0.75KW) |
| 10 | Charges for overhauling of equalizing pulley and hook pulleys of 3 Ton capacity hoist including dismantling,re-assembling, greasing and normalizing. |
| 11 | Charges for re-erecting the 3 Ton capacity electrical hoist with trolley from ground floor to original position by using chain block with bolts & nuts. |
| 12 | Charges for paintig two coats of synthetic enamal paint including the charges for scrapping,cleaning and cost of consumables such as banian waste,painting brush,emery sheet etc., |
| 13 | Load testing of various capacity Electric Hoists: Loading, transporting,Unloading the concrete test blocks from Unit-I Repair area to ESP-I,II & III area.EM-21001 |
| 14 | Load testing of various capacity Electric Hoists:Transporting the concrete test block to near ESP-I,II & III to the respective Electric Hoists and assisting the Board Engineer of all testing operations. EM-21002 |
| 15 | Material Steel wire rope of 6 x 36 construction suitable for electrical steel wire 10 mm dia Rope |
| 16 | 4 Core Flexible Copper Trailing cable of 4 Sq.mm (4 Core x 4.0 Sq.mm) |
| 17 | Eye bolt with nut and washer |
| 18 | 63 Amps,415 V,50 HZ TPN metal clad main switch with fuse unit. |
| 19 | 40 Amps/3 pole, Coil Voltage 240 V, AC,50 HZ, power contractor (for LT switch gear) |
| 20 | Porcelin Sliding real with cable clamp for hoist. Please Enable Macros to View BoQ information |