| 1 | Earth work in excavation by manual in trenches for foundations, drains, pipes, etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) . |
| 3 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. |
| 4 | Centring and shuttering including strutting, propping etc and removal of form work for.- Foundation |
| 5 | Centring and shuttering including strutting, propping etc and removal of form work for.- Suspended floor/slab |
| 6 | Centring and shuttering including strutting, propping etc and removal of form work for.-Edges of slab ( under 20cm wide ) |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 8 | Reinforcement for RCC works including straightening, cutting, bending, placing in position and binding all complete |
| 9 | Providing and laying in position 50mm thick cement concrete Flooring in 1 cement:2 fine sand:4 graded crushed stone aggregates 20mm size |
| 10 | steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 11 | Carriage of sand/dust with in avg. lead 10 km by M.T. |
| 12 | Carriage of Aggregate below 40 mm with in avg. lead 10 km by M.T. |
| 13 | Carriage of Aggregate above 40mm with in avg. lead 10 km by M.T. Please Enable Macros to View BoQ information |