| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:2.9.1 All kinds of soil :80% O.R 20% |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected:All kinds of soil : |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 infoundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 6 | 1Extra for brick work with common burnt clay bricks/cement concrete bricks insuperstructure above plinth level upto floor five level |
| 7 | 1Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 8 | Steel work welded in built up sections/framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steelprimer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates andsimilar works. |
| 9 | 15mm Cement plaster on the rough side of single or half brick wall ofmix: 1 : 6 ( 1 cement : 6 fine sand) |
| 10 | Finishing walls with water proofing cement paint of required shade onNew work (two or more coats applied @ 3.84 kg/10sqm) |
| 11 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 gradedstoneaggregate) finished with a floating coat of neat cement including cementslurry and curing complete, but excluding the cost of nosing of steps etc.complete.50 mm thick with 20mm nominal size stone aggregate. |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete |
| 13 | Carriage of material by mechanical transport from source to the site of work including loading/unloading and stakcing complete. |
| 14 | Sand for an av. 125 Kms disntace.and 500mtr by H L |
| 15 | Bajree/Stone aggregates below 40mm nominal size for an av.distance 45 Kms and 500mtr by H L |
| 16 | Bricks for an av.lead of 110 Kms distance .and 500mtr by H L Please Enable Macros to View BoQ information |