|
| 1 | Permanent restoration of 600 mm dia. & 500 mm dia. Sitlee-Manda rising mains along with allied works. |
| 2 | Providing, installation, testing and commissioning of 1.10 lakh GPH x 30 mtr head non clog raw water submersible pump set along with allied works at Collection Channel Sitlee. |
| 3 | Replacement of components of 03 nos.1.10 lakh GPH x 30 mtr head KSB make KRT pumpsets along with allied works at Collection Channel Sitlee. |
| 4 | Design, fabrication, erection of steel structural shed and allied works at Collection Channel Sitlee. |
| 5 | Design, fabrication, installation, testing and commissioning of 03 nos. floating barge with floats along with allied works at Collection Channel Sitlee. |
| 6 | Providing, installation, testing and commissioning of 04 nos. star delta dry starter panels with copper cables for 62 kW non clog raw water submersible pumpsets and allied works at Collection Channel Sitlee. |
| 7 | Providing and laying of 200 mm dia. MS rising main in place of old worn out pipes from Collection Channel to Filtration plants and allied works at Sitlee. |
| 8 | Providing, fitting, installation, testing and commissioning of 250 kVA voltage stabilizer with allied works at Collection Channel Sitlee. |
| 9 | Replacement of components of 5 ton long boom crane along with allied works installed at collection Channel Sitlee. |
| 10 | Design, fabrication and erection of steel structure for handling/operation of desilting pumps along with allied works at Intakes. |
| 11 | Design, fabrication and erection of steel supporting deck for operation/maintenance of summer/winter gates and allied works at Intake Sitlee. |
| 12 | Providing, fitting, installation, testing and commissioning of 15,000 GPH x 76 mtrs. Head submersible pumpset, LT control panel and voltage stabilizer alongwith allied works at Tube well Nai Basti |
| 13 | Recapitalization / Upkeepment of 250 KVA Voltage Stabilizer of CPS R-22 |
| 14 | Providing, fitting, installation, testing and commissioning of 15,000 GPH x 76 mtrs. Head submersible pumpset, LT control panel alongwith allied works at Tube well Patta Paloura |
| 15 | Providing, fitting, installation, testing and commissioning of 40,000 GPH x 130 mtrs. Head HC Pumpset (low speed) alongwith Panel and ATS Panel for 200 HP HC motor along with allied works at CPS Laboratory |
| 16 | Providing, fitting, installation, testing and commissioning of 25,000 GPH x 80 mtrs. Head submersible pumpsets (02 Nos.) 1 No. each for Tube well Laboratory and Tube well University ERA |
| 17 | Providing, fitting, installation, testing and commissioning of 10,000 GPH x 76 mtrs. Head submersible pumpset alongwith allied works at Tube well Corporation |
| 18 | Providing, fitting, installation, testing and commissioning of 15,000 GPH x 76 mtrs. Head submersible pumpset, LT control panel and recapitalization of voltage stabilizer alongwith allied works at Tube well Patta |
| 19 | Design, fabrication, installation, testing and commissioning of LT Control panel for 200 HP HC motor alongwith allied works at CPS Muthi V |
| 20 | Providing, fitting, installation, testing and commissioning of submersible pumpset along with allied electromechanical works at Tube well Peerkho old and New |
| 21 | Providing, fitting, installation, testing and commissioning of electromechanical equipment at CPS Samadhian |
| 22 | Recapitalization of components of 02 Nos. 500 KVA voltage stabilizer alongwith allied works at Pumping Station Tawi High Lift |
| 23 | Replacement of 70,000 GPH x 30 mtrs. Head HC Pumpset by way of providing, installation, testing and commissioning of 70,000 GPH x 30 mtrs. Head HC Pumpset alongwith allied electromechanical works at Pumping Station Tawi Low Lift. |
| 24 | Restoration / replacement of components of 150 KVA Voltage Stabilizer of Tube well No. 21 damaged due to flash floods / Heavy rains |
| 25 | Restoration / replacement of components of 250 KVA AVR of Pumping Station Tawi Low Lift damaged due to flash flood / heavy rains |
| 26 | Restoration / recapitalization of 100 KVA voltage stabilizer along with allied works at Tube well Udheywala-V due to flash flood / heavy rains |
| 27 | Recapitalization of 250 KVA Voltage Stabilizer of Tube well Peerkho old and New due to flash flood / heavy rains |
| 28 | Recapitalization of 100 KVA Servo voltage Stabilizer of Tube well 25-A due to flash flood / heavy rains |
| 29 | Restoration / recapitalization of 100 KVA voltage stabilizer of Tube well Patta Paloura damaged due to flash flood / heavy rains |
| 30 | Restoration / recapitalization of 100 KVA voltage stabilizer along with allied works at Tube well Agriculture old damaged due to flash flood / heavy rains |
| 31 | Recapitalization of 250 KVA Voltage Stabilizer of CPS Peerkho damaged due to flash flood / heavy rains |
| 32 | Restoration / recapitalization of 90 KVA voltage stabilizer along with allied works at Tube well Mohinder Nagar Old damaged due to flash flood / heavy rains. |
| 33 | Restoration / recapitalization of electro-mech. equipment of 100 KVA Manual voltage stabilizer installed at Tube well Corporation damaged due to flash flood / heavy rains |
| 34 | Restoration / recapitalization of 100 KVA voltage stabilizer along with allied works at Tube well Udheywala-1 damaged due to flash flood / heavy rains |
| 35 | Restoration / recapitalization of 150 KVA voltage stabilizer installed at Tube Well Rajinder Nagar stage II along with allied works damaged due to flash flood / heavy rains |
| 36 | Restoration / recapitalization of 250 KVA voltage stabilizer of Pumping Station Tawi Low Lift damaged due to flash flood / heavy rains |
| 37 | Restoration / recapitalization of of 600 KVA voltage stabilizer along with allied works at CPS Medical Sub division (Room no I) damaged due to flash flood / heavy rains |
| 38 | Restoration / recapitalization of 630 KVA Servo Voltage Stabilizer of CPS Samadhian damaged due to flash flood / heavy rains |
| 39 | Restoration / Replacement of components of 100 KVA voltage stabilizer along with allied works at Tube well Gole Shamshanghat damaged due to flash flood / heavy rains |
| 40 | Restoration / recapitalization of 100 KVA Voltage Stabilizer of Tube well Exhibition damaged due to flash flood / heavy rains |
| 41 | Restoration / recapitalization of 100 KVA Servo voltage Stabilizer of Tube well No 07, Samadhian damaged due to flash flood / heavy rains |
| 42 | Restoration / recapitalization of electro-mech equipment of 100 KVA Manual voltage stabilizer installed at Tube well grave Yard damaged due to flash flood / heavy rains |
| 43 | Restoration / impregnation of motors of unit no. 02,03 and 05 of CPS Samadhian and unit no. 01 & 02 of CPS Peerkho damaged due to flash flood / heavy rains |
| 44 | Restoration / recapitalization of rotor controller unit alongwith panels and allied works of pumping unit nos. 07 & 08 and allied works at CPS Samadhian damaged due to flash floods / heavy rains damaged due to flash flood / heavy rains |
| 45 | Restoration / replacement of 3.5 core Al. armoured cable at CPS Samadhian damaged due to flash floods / heavy rains damaged due to flash flood / heavy rains Please Enable Macros to View BoQ information |