| 1 | Clearing & grubbing shrub, jungles including uprooting stumps of trees and trees below 1.0 m. girth and thick bushes including bamboo clamps based on pre- measurement including cess etc. complete as per direction of Engineer-in-Charge. |
| 2 | Earth work excavation in Ordinary soil of foundation &plinth within intial lead of 50m & intial lift of 1.50m including rough dressing & levelling the bed & depositing the excavated materials away from work site as per direction of Engineer-In- Charge. |
| 3 | Filling foundation and plinth with sand well watered and rammed etc.Including all cost,carraige and labour etc.complete as per direction of Engineer-in-charge. |
| 4 | Plain cement concreet in open foundation of M-15 grade with crossed hard granite coarse aggregrate hb chips of size 40mm down graded including cost, carriage, royalty, machinaries and labour & laying in position with all leads , lifts, & delift etc complete. |
| 5 | R.C.C. work of M-20 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying including cost,carriage,royality as per direction of Engineer- in-charge. |
| 6 | Supplying ,fitting and placing uncoated HYSD bar reinforcement including cost, carriage, royality complete as per the direction of Engineer-in- charge. |
| 7 | Providing rigid and smooth centering for Cement Concrete works including false work and dismataling item after casting including cost of materials complete with cost, carrage, royality etc. complete as per direction of Engineer-in-charge. |
| 8 | Providing formwork for concrete with F1 finish for upstream faces of dam, spillway, glacis of barrages, unexposed surfaces of foundation, block joints etc.with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials and T & P complete as directed by the Engineer-in-charge. |
| 9 | Providing Weep hole in machinary R.C.C abutment wing wall & retain wall with size 100mm ac pipe extending with full width of structure etc complete. |
| 10 | Filling in foundation & plinth with excavated materials including watering & ramming with leads, lifts & delifts etc. complete as per the direction of E.I.C. |
| 11 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead including cost of labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge. |
| 12 | Providing, laying and fixing in position 150mm dia NP3 Hume pipe with collars jointed with cement mortar (1:3) complete including cost, conveyance, royalty, labour cess including Hume pipes and collars etc. complete including labour cess as per the direction of the Engineer-in-charge. |
| 13 | Earth work excavation of any approved type of soil from approved borrow area by mechanical means, loading in to and transportation by mechanical means and unloading the soil within a distance of 5 km. on properly prepared and scientifically approved surface, protection works etc. with all labour and cost of transportation , with all leads, lifts and delifts including spreading and breaking the clods to maximum 5cm to 7cm in size including clearance of site, uprooting the stumps and trees, and dressing/cutting the earth to the required profile and slope for all heights of banks and slopes with required quality control test including construction, maintenance, watering , dewatering and lighting of haul road and borrow area and royalties, labour cess, T&P etc. complete, including mobilization and demobilization of men and machineries and all incidental charges and quality control testing charges required for completion of the work as per drawing, specification and direction of the Engineer.(Measurement will be taken on level section). Arrangement of earth is the responsibility of agency. Please Enable Macros to View BoQ information |