| 1 | Providing and laying of 300 mm dia RCC sewer line i/c cleaning and de silting of manholes and sewer line at Section No.4 of Sub Div. No. 5 Bhopal |
| 2 | Earth work in excavation for foundation, trenchesfor pipes/ cables, drains or in well excavation etc.by mechanical means/ manual means (exceeding 30cm in depth.) including ramming of bottom, dressing of sides disposal of excavated earth including of all lift and lead upto 50m. Disposed earth to be levelled and neatly dressed. (15.6.3) Ordinary rock or soft rock with or without blasting( PHE USOR wef. 01.09.2023 It. No. 15.6.3 P.No. 257)1x260.00x0.70x0.25 = 45.50 cum |
| 3 | Earth work in excavation for foundation, in building works etc. by mechanical means/ manual means (exceeding 30cm in depth.) including ramming of bottom, dressing of sides disposal of excavated earth including of all lift and lead upto 50m. Disposed earth to be levelled and neatly dressed. All kind of soil( PHE USOR wef. 01.09.2023 It. No. 15.6.1 P.No. 257 ) 1x260.00x0.70x1.00= 182.00 |
| 4 | Providing and laying mechanically mixed cement concrete with crushed stone aggregate excluding centering and shuttering (with 40mm nominal size graded stone aggregate) (a) In plinth and foundation (ii) 1:2:4 (M-15)( PHE USOR wef. 01.09.2023 It. No. 15.30.1.4 P.No. 260)for base concrete 260.00x0.70x0.15= 27.30 |
| 5 | Providing and laying non-pressure (NP2) RCC socket & spigot pipes with rubber gasket joint including testing of joints. For 300 mm dia RCC( PHE USOR wef. 01.09.2023 It. No. 28.1.5 P.No. 351 ) |
| 6 | Making connection of drain or sewer line with existing service lines Manhole including breaking into and making good the walls, floors etc. with cement concrete 1 :2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size), cement plastered with CM 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement and making necessary channels etc. complete. For 250 to 300 mm dia pipes( PHE USOR w.e.f.01-09-2023 It. No. 29.15.2 P.No. 375 ) |
| 7 | Filling available excavated earth in trenches, lead up to 50m and lift up to 1.5m in all kind of soil excluding watering and ramming.( PHE USOR wef. 01.09.2023 It. No. 15.12 P.No. 258) |
| 8 | Providing and laying mechanically mixed cement concrete with crushed stone aggregate excluding centering and shuttering (with 40mm nominal size graded stone aggregate) (a) In plinth and foundation (ii) 1:2:4 (M-15)( PHE USOR wef. 01.09.2023 It. No. 15.30.1.4 P.No. 260)for c:c road 260.00x0.70x0.25= 45.50 |
| 9 | Lifting & Placing of manhole cover during cleaning of chocked sewer line & manhole. (ii) SFRC 560 mm dia size( PHE USOR wef. 01.09.2023 It. No. 29.27 P.No. 377) |
| 10 | Making arrangement for dat (plugging of sewer) including all required material such as steel plate, manila rope, gunny bags, earth etc. or by and other plugging device with all required T & P and safety equipment including dewatering. Depth up to 1.5 m (i) 100 mm Dia for connection( PHE USOR wef. 01.09.2023 It. No. 29.31.1.1 P.No. 195) |
| 11 | ( It. No. 29.31.1.3) 200 mm dia sewer line |
| 12 | Cleaning of Silt, sludge brick bats, polythene bags, garbage etc. from chocked sewer manholes / sewer drains & Nallahs/ wet well of SPH/ Anaerobic & Facultative Pond of STP with all required T&P such as bucket, manila rope, and all required safety equipment such as safety belt, gas mask, oxygen cylinder etc. including disposal of silt/ sludge upto 50 mtr lead & 1.5 mtr. lift as directed by Engineer-in-Charge including dewatering but excluding dat (plugging of sewer pipe line) Depth up to 1.50 m( PHE USOR wef. 01.09.2023 It. No. 29.32.1 P.No.380)40x0.785x1.20x1.20x0.70= 31.65 |
| 13 | Cleaning of Silt, sludge brick bats, polythene bags, garbage etc. from chocked sewer line with all required T&P and Safety equipment such as bucket, manila rope, safety belt, gas mask, oxygen cylinder etc. including disposal of silt, sludge upto 50m lead & lift up to 1.5mtr. as directed by Engineer-in- Charge including dewatering but excluding dat (plugging of sewer pipe line) For 200 mm dia( PHE USOR wef. 01.09.2023 It. No. 29.33.2 P.No. 380) |
| 14 | Carriage of desilted sludge & other material from sewage components by mechanical transport including loading unloading & stacking etc. Distance 2 Km.( PHE USOR wef. 01.09.2023 It. No. 29.35.2 P.No. 383 and Corrigendum no. 1 Dt. 16-08-2024 ) Deduct 20 % air voides of Please Enable Macros to View BoQ information |