|
| 1 | Demolition of brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles |
| 2 | M&L Pre-cast PCC 1:3:6 type C1 (using 20 mm graded stone agg) cement concrete block masonry with solid blocks exc. 10cm in width and set in cement mortar 1:6 built in cement mortar of any description complete all as specified and as directed. |
| 3 | M & L walling of random rubble, uncoursed, Bangalore type masonry well bonded bedded solidly hearted built in CM 1:6, extra over stone walling for hammer dressing to face stones and dressing of face beds and joints, key pointing to random or polygonal rubble, uncoarsed or brought upto courses in CM 1:4 all as specified and directed. |
| 4 | Fixing only walling random rubble, uncoursed, Bangalore type masonry (except stone) well bonded bedded solidly hearted built in CM 1:6, extra over stone walling for hammer dressing to face stones and dressing of face beds and joints as specified, key pointing to random or polygonal rubble, uncoarsed or brought upto courses in CM 1:4 and including removal and refixing, built in cement mortar of any description as specified and directed. Note :- Old stones shall be re-used. |
| 5 | Material and labour for keyed pointing in cement mortar 1:4 to random or polygonal rubble including racking out joints / points in cement mortar to squared rubble masonary coursed or un coursed etc complete all as specified and directed. |
| 6 | Supply and fixing in repairs 23-24mm thick PVC jallies CNC machine cut as per the approved pattern and density of jallies 500 kg/m3 design as approved by Engr-in-Charge. The PVC Jallies shall be fixed with the help of screw/nut bolt of suitable size and numbers as decided by the Engr-in-Charge. PVC Jallies shall be fixed to the existing steel frame work after replacing of rusted steel including necessary welding work complete all as specified and as directed. Note: MS steel work will be measured and paid seperately |
| 7 | Taking down cement or cement lime plaster, any description on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. |
| 8 | M&L for rendering 15mm thick in cement mortar (1:4) on brick or concrete surfaces of wall and finishing the surface even and smooth without using extra cement complete all specified and directed. |
| 9 | Material and labour for Preparation of new plastered surfaces of wall and applying two coats of cement based paint over one coat of primer complete all as specified and as directed. |
| 10 | S & F in repair concertina coil of 610mm dia (in stretched position) hot dip galvanised steel wire coated with CLR ante corrosive coating making diamond shape with the help of devotail clips (18 SWG) fixed over barbed with the angle iron the concertina coil is to be fixed with barbed wire at points where coil touched the bottom of barbed wire with the help of hog rings (14 SWG) complete,incl removal of old unserviceable coil of any description all as specified and directed. |
| 11 | S&F in repair galvanised two strand steel barbed wire 2.24 mm dia barbed wire with 2 mm barbs at 75 mm spacing and straining and fixing to any type of standard rails straining bolts including securing or tying at crossing with and provision of galvanised MS wire staples or steel pins etc as directed (each line wire to be measured) complete all as specified and directed. |
| 12 | Restraining and resecuring barbed wire including making good staples etc (each line wire to be measured) complete all as specified and directed. |
| 13 | M & L broken glass coping on top of walls in cement mortar 1:3 incl taking down old glass and removing the rubbish complete all as specified and directed. Please Enable Macros to View BoQ information |
| 14 | M & L broken glass coping on top of walls in cement mortar 1:3 incl taking down old glass and removing the rubbish complete all as specified and directed. Please Enable Macros to View BoQ information |