| 1 | Clear water Boosting P/Plant -W.T.P Campus at Kalipahari |
| 2 | Cost towards repairing, servicing and overhauling of 10 H.P. HSC C/F Pump set having 1450 rpm, head 40 mtrs, discharge 32 m³/hr, Pump make- Kirloskar DSM type with following works:-i. Opening, dismantling & cleaning of the pump.ii. Making, turning & finishing and fitting S.S. pump shaft-01 No. as per sample with threading, key slot making grooving etc. all complete job.-01 No.iii. S.S. shaft sleeve-02 Nos. as per sample.iv. Ball bearing -6305 (SKF/NBC make)-02 Nos.v. Check nut-02 Nos.vi. M/F Gland tightener as per sample-02 Nos.vii. Bearing housing re-metalling, turning & finishing as per sample and suitable for bearing.-02 Nos.viii. Making & fitting of Neck ring-02 Nos.ix. S.S. bush as per sample-02 Nos.x. Tyre Coupling set with lathe work-01 setComplete re-assembling and overhauling of Pump, installing at site with all labour, tools & tackles and Testing on full load with transportation charge up & down etc. including the deduction of scrap materials all complete at clear water P/Plant Kalipahari. |
| 3 | Supplying all labor tools and tackles for complete opening, dismantling, cleaning of its slots of stator by brush & petrol then complete rewinding of JSL make 10 H.P, 415 volts, 50c/s,1450 rpm, Star delta, 3 phase induction motor by supplying super enameled copper wire & then tapping, varnishing, heating ,repairing of stator & rotor and reassembling to its original position &testing on full load. Changing of bearings-DE/ NDE 6308/ 6208 as per sample-2 Nos. with including the deduction of cost burnt copper Wires and transportation charges from p/plant to workshop and back to the same etc. all complete at clear water p/plant .Wt. of cooper wire approx.-8.50 kg. |
| 4 | Supplying all labor tools and tackles for complete opening, dismantling of JSL make 10 HP, 415 volts, 50c/s,1450 rpm, Star delta, 3 phase induction motor by varnishing, heating, repairing of stator & rotor and reassembling motor to its original position and testing on load etc. all completed at WTP with changing of followings bearings (i) Ball bearing DE/ NDE 6308/ 6208 (SKF) as per sample-1 No. each, terminal plate-01 No. as per sample including the deduction of scrap materials. |
| 5 | Cost towards repairing, servicing and overhauling of 30 H.P. HSC C/F Pump set having 1460 rpm, head 60 mtrs., discharge 82 m³/hr., Pump make - Kirloskar DSM type with following works:-i. Opening, dismantling & cleaning of the pump.ii. Making, turning & finishing and fitting S.S. Pump shaft-01 No. as per sample with threading, key slot making grooving etc. all complete job.-01 No. iii. S.S. shaft sleeve-02 Nos. as per sample.iv. Ball bearing -6305 (SKF/NBC make)-02 Nos.v. Check nut-02 Nos.vi. Gland tightener-02 Nos.vii. Bearing housing re-metalling, turning & finishing as per sample and suitable for bearing.-02 Nos.viii. Making & fitting of Neck ring-02 Nos.ix. S.S. bush as per sample-02 Nos.x. Tyre Coupling set with lathe work-01 set.Complete re-assembling and overhauling of Pump, installing at site with all labour, tools & tackles and Testing on full load with transportation charge up & down etc. including the deduction of scrap materials all complete at clear water P/Plant Kalipahari. |
| 6 | Supplying all labor tools and tackles for complete opening, dismantling, cleaning of its slots of stator by brush & petrol then complete rewinding of JSL make 30 H.P, 440 volts, 50c/s, 1460 rpm, Star delta, 3 phase induction motor by supplying super enameled copper wire & then tapping, varnishing, heating and reassembling to its original position repairing of stator & rotor& testing on full load. Changing of bearings- DE/NDE -6310/6310 Make as per sample-2 Nos. with including the deduction the cost of burnt copper Wires and transportation charges from p/plant to workshop and back to the same etc. all complete at clear water p/plant. Wt. of copper wire approx. -22.50 kg |
| 7 | Supplying all labor tools and tackles for complete opening, dismantling of JSL make 30 HP, 415 volts, 50c/s, 1460 rpm, Star delta, 3 phase induction motor by varnishing, heating, repairing of stator & rotor and reassembling of motor to its original position and testing on load all completed at WTP with changing of followings bearings (i) Ball bearing DE/ NDE 6310/ 6310 (SKF) as per sample-2 Nos. each, terminal plate-01 No. as per sample including the deduction of scrap materials. |
| 8 | Cost towards Resetting of base plate by supplying of new MS base plate as per sample in place of damaged/rusted base plate for 10 & 30 H.P c/f Pump set, groove making, finishing and welding of damaged foundation bolts, pump and motor refitting & alignment, leveling etc., with all labor, tools and materials including the deduction of scrap materials.I. For 10 HP Pump Motor set- 2 Nos.II. For 30 HP Pump Motor set- 1Nos. |
| 9 | Cost towards repairing & servicing of motor control panel (MCP) having FASD starter – 4 nos. (2 for 10 HP and 2 for 30 HP p/sets) and 200 Amp. 415Volts incomer MCCB with following works-i. Changing of L&T MNX 50 main contactor with L&K/ Schneider contactor -1 no. with Front- (2NO+2NC) & Side Add on Auxiliary contacts -01 no. each as per suitable for FASD-1(30 HP).ii. Changing of Star & delta contactor MNX 40& MNX 50- 01 No. each having Front-(2NO+2NC)-1 & Side Add on Auxiliary contacts-(1NO+1NC)- 01no. each with with L&K/Schneider contactor with Front- (2NO+2NC) & Side Add on Auxiliary contacts -01no. each as per suitable –for FASD-2(30 HP).iii. Changing of star & Delta contactor MNX-25-01 No. each having Front-(2NO+2NC)& Side Add on Auxiliary contact-(1NO+1NC)-01 no. each with L&K/Schneider contactor with Front- (2NO+2NC) & Side Add on Auxiliary contact -01 no. each as per suitable. –for FASD-1.(10 h.p.)iv. Changing of Thermal overload Relay (30-50 A)-125A max. with required ratings -01 No.v. Changing Timer (12-120 sec)-01 No. (L&k Make) vi. ON-OFF push buttons-02 Nos. vii. 3 Phase LED Voltmeter CI 0.5-01 No.viii. 3 Phase LED Ampere meter CI 0.5 -01 No., ix. Single phasing, reverse current, under voltage, over voltage protection relay (MPD)-02 sets for both motor. x. LED Phase indicating bulb-06 Nos., xi. Auto/Manual Selector switch-03 Nos.xii. Spare MCCB-100 amp. L&k/Havell’s/BCH /ISI Mark any reputed make.xiii. S/F of 4 sq. mm Single core copper cable for control wiring etc. with all fitting & electrician and servicing charges at P/Plant. |
| 10 | Cost towards Servicing and repairing of 75 KVA Servo voltage stabilizer having input-240-470 volt, Output-400±1% V Power Line make with following works-i. Cost towards S/F of servo motor as per sample having torque 03 kg-cm to 10kg-cm, 240V,1PH, 50Hz 125mA, 60 RPM with required rating suitable for servo stabilizer - 01No.ii. Panel Sensing-Control Card-01 No. iii. Relay, iv. Digital Voltmeter as sample-01 No. each. , v. Control transformer-02 Nos.vi. Top up T-Oil -60 Ltr.Including all labor tools tackles and electrician charges etc. all complete job and testing on full load at wtp. |
| 11 | Providing and fixing Chemical earthling -3 meters and 50 mm hole size with electrode and chemical compound etc. with watering pipe and locking arrangements including soldering, riveting, jointing G.I. flat strip 32mm X 6mm-20 Mtrs. for installed each motor set, MCP, servo Voltage stabilizer etc. as required etc. all complete as per as per direction of E/I & as per IE rule. |
| 12 | Cost towards repairing of damaged/leaked 80 mm & 65mm installed MS delivery pipe (02 nos. -4 mtr. each) form pump outlet to common header and at junction of common header and delivery pipe by cutting & removing damage portion (1 meter ) of pipe then welding with required length of cutting piece of 80mm & 65mm MS pip and proper jointing with common header with earth excavation and refilling work etc. including deduction of scraps. all complete job at site as per specification & direction of E/I. |
| 13 | Cost towards painting of Electro-mechanical components as Motor Pump, Panel board, Sluice valve, NR Valves, Suction pipe line, delivery pipe line form pump outlet to common header with primer and two coat of Metal Oil paint as required at WTP boosting unit. |
| 14 | Raw water P/Plant –Intake Well at Chandadih Lakhanpur |
| 15 | Providing all labors, tools, tackels and technician for disconnection and taking out 40 HP VT p/set with column pipe from intake well all complete set. |
| 16 | Cost towards all labor, tools, tackles and technician for opening, dismantling, repairing and overhauling of 05 stage bowl assembly VT pump having head 60 meter, discharge- 111.6 m3/hr. speed 1460 rpm. With changing/repairing following accessoriesi. 40mm dia. S.S. pump shaft- 01 No.ii. GM impeller - 02 Nos.iii. GM Bowl bush- 04 Nos.iv. Intermediate bowl rubber bushes - 04 Nos.v. Suction case bush - 01 No.vi. Discharge case bush – 01 No.vii. Stuffing box with bush as per sample – 01 No.viii. Retainer bearing with rubber bush-04 Nos.ix. 30 mm/25mm dia. S.S. line shaft- 10 ft. each – 2 Nos.x. 30 mm/25mm dia. S.S. head shaft- 8 ft. -1 No.xi. GM gland- 01 No. xii.S.S. shaft sleeve – 01 No. xiii. S.S. nut bolts.-04 kg as per sample.xiv. Coloring of Bowl assembly and column pipe and reassembling the same at workshop and refitting at site etc. all complete. (Rate after deducting the scrap materials). Make of pump –WPIL |
| 17 | Providing all labors, tools, tackels and technician for lowering after repairing of 40 HP VT P/Set with column pipe, line shaft, Nut bolts as per required into intake well all complete. |
| 18 | Cost towards supplying all labor tools and tackles for complete opening, dismantling, cleaning of its slots of stator by brush & petrol then complete rewinding of JSL make 40 HP, 440 Volt, 50c/s, star delta, 3 phase VT motor by supplying super enameled copper wire and then tapping, varnishing, heating and repairing of stator and rotor & reassembly of motor and testing on full load with including the deduction of cost of burnt copper wires etc. all complete .Weight of copper wire approx. 22.5 kg.With changing of following bearing:- (i) Ball bearing as per sample -01 No. and (ii) Thrust bearing as per sample at raw water p/plant. |
| 19 | Cost towards supplying all labor tools and tackles for complete opening, dismantling of JSL make 40 HP, 440 Volt, 50c/s, star delta, 3 phase VT motor by varnishing, heating, repairing, reassembly of motor & testing on full load With changing of following bearing:- (i) Ball bearing as per sample -01 No. and (ii) Thrust bearing as per sample at raw water p/plant. Including the deduction of scrap materials |
| 20 | Cost towards transportation charges of above pump motor set and other fittings materials from p/plant to workshop and vice versa. |
| 21 | Cost towards repairing & servicing of motor control panel (MCP) having FASD starter – 2 Nos. for 40 HP p/sets and 200 Amp. 415Volts MCCB. with following works-i. Changing of L&T MNX 70 main contactor –with L&K/ Schneider contactor -1 no. with Front- (2NO+2NC) & Side Add on Auxiliary contacts - 01 no. each as per suitable for FASD -1ii. Changing of Star & delta contactor MNX 70 - (01 No. each ) having Front-(2NO+2NC)-1 & Side Add on Auxiliary contacts-(1NO+1NC)-01 no. each with L&K/Schneider contactor with Front- (2NO+2NC) & Side Add on Auxiliary contacts 01 no. each as per suitable for FASD - 1iii. Changing of star contactor MNX 70-(01 No) having Front-(2NO+2NC)& Side Add on Auxiliary contact-(1NO+1NC)-01 no. each with with L&K/Schneider contactor with Front- (2NO+2NC) & Side Add on Auxiliary contact -01 no. each as per suitable for FASD - 2.iv. Changing of Thermal overloads Relay (30-50A) 125A max with required rating- 01No.v. Timer (0-30 sec) / (12-120Sec.)-01 No. (GIC/L&k Make) vi. ON-OFF push buttons-02 Nos. vii. 3 Phase LED Voltmeter CI 0.5-01 No.viii. 3 Phase LED Ampere meter CI 0.5 -01 No., ix. Single phasing, reverse current, under voltage, over voltage protection relay (MPD)- 02 sets for Both motor. x. LED Phase indicating bulb-06 Nos., xi. Auto/ Manual Selector switch-03 Nos.xii. Spare MCCB-125 amp. L&k/Havell’s/BCH /ISI Mark any reputed make.xiii. s/f of 16 mm2 single Core power cable grip to panel board, S/f of 4 sq. mm Single core copper cable. for control wiring etc. with all fitting & electrician and servicing charges at P/Plant. |
| 22 | Cost towards repairing & servicing of 100 KVA Oil cooled Servo Voltage Stabilizer working on three phase input Voltage-240 to 400 V and Output-400±1%V. Power Line make with following works-i. Cost towards disconnection and cleaning of stabilizer with all labor tools and tackles.ii. Cost towards changing of servo motor having torque 03 kg-cm,240V,1PH,50Hz 125mA, 60 RPM with required rating suitable for servo stabilizer – 03Nos. iii. Cost towards changing of Panel Sensing/control PCB Card as per sample -03 Nos.iv. R.C kit-03 Unitv. Wiring of stabilizer with 4 sq. mm wire as per required.vi. Control transformer-03 Nos. as per samplevii.3-phase Digital Voltmeter (Input /Output) As Per sample.-02 Nos.viii. Armored and shaft-03 Nos.ix. Cost towards adding of transformer oil.-120 Ltrsx. Cost towards complete servicing and repairing cost of stabilizer with all labor, tools and tackles and electrician charges etc. all complete job and testing on full load. |
| 23 | Supplying and fitting of 415volt, S-D-F FN 250A TPN main switch and SS enclosure suitable for DIN fuse link with HRC fuses make L&T/Havel’s/C&S with all labour & tools and materials installing at pump house. |
| 24 | Socketing of terminal ends with S/F of Terminal Socket including all labor tools and tackles forI. 3.5Core 25Sq mm Copper Cable II. 3.5Core 95Sq mm Aluminum Cable |
| 25 | Providing and fixing Chemical earthling -3 meters and 50 mm hole size with electrode and chemical compound etc. with watering pipe and locking arrangements including soldering, riveting, jointing G.I. flat strip 32mm X 6mm-20 Mtrs. for installed each motor set, MCP, voltage stabilizer as required etc. all complete as per as per direction of E/I & as per IE rule. |
| 26 | Cost towards supplying of 200 mm dia D.I flange adapter / Flange Tail piece having one end flanged and other end push. Suitable for fitting in 200 mm dia double flanged NR Valve -01No. On 200 mm dia raw water rising main DI pipe line on intake well gangway. |
| 27 | Cost towards painting of Electro-mechanical components as Motor Pump, Panel board, Sluice valve, NR Valves, common header pipe line inside Pump Chamber with primer and two coat of Metal Oil paint as required at intake well. Please Enable Macros to View BoQ information |