|
| 1 | Earth work in embankment by power transported earth with a lead up to 4 KM including excavation, loading, unloading,dressing and all lifts complete |
| 2 | Dismantling of RCC Works stacking of dismantled material within 60M in drain bed including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 3 | Dismantling of bricks Works stacking of dismantled material within 60M in drain bed including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 4 | Dewatering for Foundation E/W,Concrete & Brick Work including Boring Pump Set / fuel and Pump Operating staff etc incuding all. |
| 5 | Earth work excavation in foundation including all lead & lift cost of labour, material, T&P etc. required for proper completion of the work. |
| 6 | Laying C.C 1:3:6 in foundation with stone ballast 20-40 mm size including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 7 | Ist class Brick work in 1:4 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 8 | Centering and shuttering for R.C.C work including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 9 | Providing reinforcement i/c cutting, bending, binding, placing properly with also including cost of binding wire required for proper completion of the work. |
| 10 | R.C.C 1:1.5:3 including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 11 | Struck cement pointing in 1:2 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 12 | Supplying and fixing PVC pipe 75mm dia and for drainage system including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 13 | Supplying and fixing marble plate 300x300 mm size on VRB including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 14 | Remove/DisposalDiversion, Dismental Rcc,BW & used in back fillingwing/retaing wall/drain bed in all labour,T&P etc.required for proper completion of work. Please Enable Macros to View BoQ information |