| 1 | ASH HANDLING SYSTEM PACKAGE FOR TELANGANA STPP-II (3 X 800 MW) |
| 2 | TOTAL OF SCHEDULE NO.2 (In INR)Plant and Equipment including Type Test charges and mandatory spares parts to be supplied from Employer's Country. |
| 3 | TOTAL OF SCHEDULE NO.3 (In INR)Local Transportation including Port Handling, Port Clearance, custom reconciliation & inland transit insurance and other local costs incidental to delivery of Plant and Equipment including Mandatory Spares. |
| 4 | TOTAL OF SCHEDULE NO.4 (In INR)Installation Services including Erection, Testing & commissioning works, Insurance covers other than inland transit insurance,associated civil works and structural works and other services (Safety etc) |
| 5 | TOTAL OF SCHEDULE NO.7 (In INR)Goods & Services Tax (GST) Name of Work: ASH HANDLING SYSTEM PACKAGE FOR TELANGANA STPP-II (3 X 800 MW) Bidding Document No.: CS-9592-162-9 Bidder's Name and Address : SCHEDULE - 2 : PLANT AND EQUIPMENT INCLUDING TYPE TEST AND MANDATORY SPARES TO BE SUPPLIED FROM WITHIN THE EMPLOYER'S COUNTRY ITEM DESCRIPTION UOM QTY UNIT PRICE TOTAL PRICE EX-WORKS (INR) EX-WORKS (INR) I) MAIN EQUIPMENT |
| 6 | A) DRY BOTTOM ASH HANDLING SYSTEM i) Dry Bottom Ash System Compete With Conveyors, Idlers, Crushers and all other equipments and accessories as per techanical specificiation part-VI for conveying of Dry Bottom Ash upto Bottom Ash Storage Silos via IM Silos ii) Dry Extraction of Ash from Economizer Hopper, APH Hopper & Duct Hopper (Pneumatic compressors, surge hoppers, pipe lines and valves etc.) iii) Any other items not included above but required to complete the bottom ash handling system B) BOTTOM ASH SLURRY DISPOSAL SYSTEM i) Bottom Ash slurry disposal pumps along with drives and other accessories as specified ii) Variable speed hydraulic coupling iii) Complete Bottom ash slurry disposal pipe lines complete with bends, specialities, fittings, fixtures, sleeve couplings, supports, etc. iv) Slurry line valves (i.e. valves at slurry pump suction & discharge, valves at disposal end & sump isolation) v) Basalt lined piping alongwith bends & fittings supports etc. as specified and as required. vi) Sump liner and slurry trench liner vii) Vertical sump drainage pumps with motors complete with valves, fittings, supports, inserts, sleeves, etc. viii) Pendant controlled electrically operated overhead travelling crane complete with runway rails with necessary rail clamps, bolts, splice bars, end stops, etc. ix) Supply of foundation bolts & inserts, etc. x) BA seal water pump with motor complete with valves, fittings, supports, inserts, sleeves etc. xi) Instrumentation xii) Bottom Ash slurry transportation pumps along with drives and other accessories as specified (if applicable) for making slurry of Bottom Ash stored in Bottom Ash Silos & transporation of slurry to sump of Bottom Ash Disposal Pump House xiii) Any other items not covered above, but required to complete the system |
| 7 | ALTERNATIVE-I ( Bidder to quote Price either for Alternative-I or Alternative -II) A) Vacuum System i) Vacuum pumps alongwith drives and accessories as specified. ii) a) Chute isolation valves b) Pneumatically operated solenoid actuated material handling valves/ feed valves c) Bellow type expansion joints iii) Air intake valve iv) Dry fly ash conveying piping complete with valves, specialities, bends, actuators, structural steel supports, etc. v) Surge-cum collection buffer hoppers/intermediate silos with supporting steel structure, liners, platforms, stairs, aeration system, primary collector & secondary collector or target box alongwith bag filler vi) Vacuum breakers vii) Valves, pipes & fittings, aeration pads for buffer hopper aeration & for material handling/feed valve aeration & supports viii) Monorails & Hoists along with rails & accessories for vacuum pumps & buffer hopper aeration blowers. ix) Any other items not included above but required to complete the Dry Fly Ash conveying System ALTERNATIVE-II ( Bidder to quote Price either for Alternative-I or Alternative -II) B) Pressure System i) Conveying air compressors alongwith coolers, drive motor, supporting structure and other accessories as specified ii) Refrigerant type air dryers alongwith accessories iii) Air receivers alongwith accessories iv) a) Chute isolation valves b) Pneumatically operated solenoid actuated material handling valves/feed valves c) Bellow type expansion joints v) Pump tank/airlock below ESP hoppers alongwith accessories vi) Dry fly ash conveying piping alongwith fittings and bends, structural steel support, etc. vii) Surge-cum-collection intermediate Silos/ Classifier Silo/Coarse and Fine Ash silos each complete with supporting steel structure, Liners, platforms, stairs, aeration system, target box alongwith bag filler viii) Valves, pipes & fittings, aeration pads for Air lock Tanks aeration & for material handling/feed valve aeration supports ix) Pendent controlled electrically operated overhead travelling crane complete with runway rails, clamps, and stops etc. in conveying air compressor houses. x) Any other item not included above but required to complete the dry fly ash conveying system C) COMMON FOR VACUUM OR PRESSURE CONVEYING SYSTEM (i) All interconnecting compressed air/exhaust pipelines complete with valves & fittings and supporting structure (ii) Buffer hopper/silo /Intermediate Silo aeration blowers, complete with heaters, valves, pads & pipelines etc. (iii) Supply of foundation bolts, inserts, aeration blower and pads for ESP hoppers etc. (iv) Any other item not included above, but required to complete the fly ash Conveying system |
| 8 | i) Transport air compressors alongwith variable frequency drives, coolers and supporting structure and other accessories as specified ii) Refrigerant type air dryers alongwith accessories iii) Air receivers alongwith accessories iv) Pump tank/air locks, alongwith accessories v) a) Pipe lines for fly ash conveying from buffer hoppers to Classifier silos, and subsequent transfer from classifier silos to main storage silos, HCSD Silo, Fine Fly Ash Silos and including bends, fittings, pipe rack/trestles, platform, access stairs and associated supporting structures as specified(In case of vacuum conveying system) b) Pipe lines for fly ash transportation from classifier silos to main storage silos, HCSD Silo, Fine Fly Ash Silos and including bends, fittings, pipe rack/trestles, platform, access stairs and associated supporting structures as specified(In case of pressure conveying system) vi) Pneumatically operated, solenoid actuated material handling valves vii) Dry ash main storage silos & Fine Fly Ash Silos complete with aeration system, target box and all other accessories as required, all supporting steel structure, access staircases, platform etc. viii) Classifier silos complete with aeration system, target box and all other accessories as required, all supporting steel structure, access staircases, platform etc. ix) HCSD silos complete with aeration system, target box and all other accessories as required, all supporting steel structure, access staircases, platform, etc. x) Equipment for Main Storage Silos (a) Vent filter & accessories for main storage silos & Fine Fly Ash Silo (b) Dry ash unloaders & rotary feeders (c) Ash conditioner's alongwith drive motor, rotary feader and associated water piping and valves (d) Telescopic chutes for dry and conditioned ash unloading complete with drives, accessories (e) Water booster pumps & wash water pumps alongwith drives, piping, valves, supporting structure, etc. (f) Vertical sump drainage pumps alongwith drives, piping, valves, supporting structures, etc. (g) Pendant controlled electrically operated overhead travelling crane complete with runway rails, clamps, end stops etc. for and silo utility building (h) Supply of foundation bolts & inserts, etc. (i) Classification & Bagging Plants unit (j) Any other items not covered above but required to complete the dry ash transportation and storage system xi) Equipment for HCSD Silos (a) Vent filter & accessories for main storage silos (b) Dry ash unloaders with VFD (c) Ash conditioners alongwith associated water piping and valves (d) Vertical sump drainage pumps alongwith drives, piping, valves, supporting structures, etc. (e) Supply of foundation bolts & inserts, etc. (f) Any other items not covered above but required to complete the dry ash transportation and storage system |
| 9 | i) i) Bottom Ash water pumps complete with drive motors and other accessories as specified ii) Fly Ash water pumps complete with drive motors and accessories as specified iii) HP Seal water pumps alongwith drive motors and accessories as specified iv) LP Seal water pumps alongwith drive motors and accessories as specified v) Flushing water pump alongwith drive motor and accessories vi) All ash water piping, seal water piping, flushing water piping, service water piping complete with fittings, valves, flanges, hangers, associated supporting structure etc. as specified vii) Pendant controlled electrically operated overhead travelling crane complete with runway rails, clamps, end stops etc. for ash water pump house viii) Any other items not included above but required to complete the ash water supply system |
| 10 | (a) (a) Complete high concentration slurry transportation pipe lines upto ash dyke including garlanding associated supporting structure as specified (b) Pneumatically operated valves and accessories (c) Mixing/agitator tanks alongwith drives and accessories (d) Positive displacement type HCSD pumps alongwith variable frequency drive and HCSD pipe line (e) Slurry line valves (i.e. valves at HCSD pump suction & discharge (f) Pendent controlled electrically operated overhead travelling crane complete with runway rails clumps, end stops etc. for HCSD pump house (g) Supply of foundation bolts & inserts etc. (h) Wash water pumps, charge pumps alongwith drives, piping, valves, supporting structure etc. (i) Any other items not included above but required to complete the HCSD system |
| 11 | A) Complete Mechanical System as per Technical Specification and Bidding documents for : (i) Ash Water Recirculation Pumps & Drives, Booster pump(if required at branch point) Ash Water Re-circulation piping, valves and fittings, crane, Inter connecting piping, along with all accessories etc as per Technical specifications B) Any other item not included above but required to meet the offered system complete in all respect. |
| 12 | SUB-TOTAL (I) MAIN EQUIPMENT 0.0 II) MANDATORY SPARES [BOQ AS SPECIFIED IN Sub-SECTION VI, PART-A, SECTION-VI](Bidder is required to fill the prices of all the items serially as specified in Sub-section-VI, Part-A, Section-VI) SUB TOTAL (II) MANDATORY SPARES) 0.0 (III) TYPE TEST CHARGES(AS PER FURTHER BREAK-UP OF TYPE TEST CHARGES GIVEN IN SCHEDULE-8B) SUB-TOTAL (III) OF TYPE TEST CHARGES 0.0 GRAND TOTAL (I+II+III) -Schedule-2 (The total amount of this Schedule is to be filled up in BoQ1) 0.0 NOTE |
| 13 | Name of Work: ASH HANDLING SYSTEM PACKAGE FOR TELANGANA STPP-II (3 X 800 MW) Bidding Document No.: CS-9592-162-9 Bidder's Name and Address : SCHEDULE- 3 : LOCAL TRANSPORTATION & INLAND TRANSIT INSURANCE AND OTHER LOCAL COSTS INCIDENTAL TO DELIVERY OF PLANT & EQUIPMENT INCLUDING MANDATORY SPARES ITEM DESCRIPTION TOTAL PRICE (INR) (I) MAIN EQUIPMENT (II) MANDATORY SPARES TOTAL OF SCHEDULE-3 (I + II) (The total amount of this Schedule is to be filled up in BoQ1) 0.0 Name of Work: ASH HANDLING SYSTEM PACKAGE FOR TELANGANA STPP-II (3 X 800 MW) Bidding Document No.: CS-9592-162-9 SCHEDULE - 4 : INSTALLATION SERVICES INCLUDING INSURANCE (OTHER THAN TRANSIT INSURANCE) INCLUDING ASSOICATED CIVIL WORK AND OTHER SERVICES AS SPECIFIED IN BIDDING DOCUMENTS ITEM DESCRIPTION UOM QTY UNIT PRICE TOTAL PRICE (INR) (INR) I) Installation Services of Main Equipment |
| 14 | A) DRY BOTTOM ASH HANDLING SYSTEM i) Dry Bottom Ash System Compete With Conveyors, Idlers, Crushers and all other equipments and accessories as per techanical specificiation part-VI for conveying of Dry Bottom Ash upto Bottom Ash Storage Silos via IM Silos ii) Dry Extraction of Ash from Economizer Hopper, APH Hopper & Duct Hopper (Pneumatic compressors, surge hoppers, pipe lines and valves etc.) iii) Any other items not included above but required to complete the bottom ash handling system B) BOTTOM ASH SLURRY DISPOSAL SYSTEM i) Bottom Ash slurry disposal pumps along with drives and other accessories as specified ii) Variable speed hydraulic coupling iii) Complete Bottom ash slurry disposal pipe lines complete with bends, specialities, fittings, fixtures, sleeve couplings, supports, etc. iv) Slurry line valves (i.e. valves at slurry pump suction & discharge, valves at disposal end & sump isolation) v) Basalt lined piping alongwith bends & fittings supports etc. as specified and as required. vi) Sump liner and slurry trench liner vii) Vertical sump drainage pumps with motors complete with valves, fittings, supports, inserts, sleeves, etc. viii) Pendant controlled electrically operated overhead travelling crane complete with runway rails with necessary rail clamps, bolts, splice bars, end stops, etc. ix) Supply of foundation bolts & inserts, etc. x) BA seal water pump with motor complete with valves, fittings, supports, inserts, sleeves etc. xi) Instrumentation xii) Bottom Ash slurry transportation pumps along with drives and other accessories as specified ( if applicable) for making slurry of Bottom Ash stored in Bottom Ash Silos & transporation of slurry to sump of Bottom Ash Disposal Pump House xiii) Any other items not covered above, but required to complete the system |
| 15 | ALTERNATIVE-I ( Bidder to quote Price either for Alternative-I or Alternative -II) A) Vacuum System i) Vacuum pumps alongwith drives and accessories as specified. ii) a) Chute isolation valves b) Pneumatically operated solenoid actuated material handling valves/ feed valves c) Bellow type expansion joints iii) Air intake valve iv) Dry fly ash conveying piping complete with valves, specialities, bends, actuators, structural steel supports, etc. v) Surge-cum collection buffer hoppers/intermediate silos with supporting steel structure, liners, platforms, stairs, aeration system, primary collector & secondary collector or target box alongwith bag filler vi) Vacuum breakers vii) Valves, pipes & fittings, aeration pads for buffer hopper aeration & for material handling/feed valve aeration & supports viii) Monorails & Hoists along with rails & accessories for vacuum pumps & buffer hopper aeration blowers. ix) Any other items not included above but required to complete the Dry Fly Ash conveying System ALTERNATIVE-II ( Bidder to quote Price either for Alternative-I or Alternative -II) B) Pressure System i) Conveying air compressors alongwith coolers, drive motor, supporting structure and other accessories as specified ii) Refrigerant type air dryers alongwith accessories iii) Air receivers alongwith accessories iv) a) Chute isolation valves b) Pneumatically operated solenoid actuated material handling valves/feed valves c) Bellow type expansion joints v) Pump tank/airlock below ESP hoppers alongwith accessories vi) Dry fly ash conveying piping alongwith fittings and bends, structural steel support, etc. vii) Surge-cum-collection intermediate Silos/ Classifier Silo/Coarse and Fine Ash silos each complete with supporting steel structure, Liners, platforms, stairs, aeration system, target box alongwith bag filler viii) Valves, pipes & fittings, aeration pads for Air lock Tanks aeration & for material handling/feed valve aeration supports ix) Pendent controlled electrically operated overhead travelling crane complete with runway rails, clamps, and stops etc. in conveying air compressor houses. x) Any other item not included above but required to complete the dry fly ash conveying system C) COMMON FOR VACUUM OR PRESSURE CONVEYING SYSTEM (i) All interconnecting compressed air/exhaust pipelines complete with valves & fittings and supporting structure (ii) Buffer hopper/silo /Intermediate Silo aeration blowers, complete with heaters, valves, pads & pipelines etc. (iii) Supply of foundation bolts, inserts, aeration blower and pads for ESP hoppers etc. (iv) Any other item not included above, but required to complete the fly ash Conveying system |
| 16 | i) Transport air compressors alongwith variable frequency drives, coolers and supporting structure and other accessories as specified ii) Refrigerant type air dryers alongwith accessories iii) Air receivers alongwith accessories iv) Pump tank/air locks, alongwith accessories v) a) Pipe lines for fly ash conveying from buffer hoppers to Classifier silos, and subsequent transfer from classifier silos to main storage silos, HCSD Silo, Fine Fly Ash Silos and including bends, fittings, pipe rack/trestles, platform, access stairs and associated supporting structures as specified(In case of vacuum conveying system) b) Pipe lines for fly ash transportation from classifier silos to main storage silos,HCSD Ash Silo, Fine Fly Ash Silos and including bends, fittings, pipe rack/trestles, platform, access stairs and associated supporting structures as specified(In case of pressure conveying system) vi) Pneumatically operated, solenoid actuated material handling valves vii) Dry ash main storage silos & Fine Fly Ash Silos complete with aeration system, target box and all other accessories as required, all supporting steel structure, access staircases, platform etc. viii) Classifier silos complete with aeration system, target box and all other accessories as required, all supporting steel structure, access staircases, platform etc. ix) HCSD silos complete with aeration system, target box and all other accessories as required, all supporting steel structure, access staircases, platform, etc. x) Equipment for Main Storage Silos (a) Vent filter & accessories for main storage silos & Fine Fly Ash Silo (b) Dry ash unloaders & rotary feeders (c) Ash conditioner's alongwith drive motor, rotary feader and associated water piping and valves (d) Telescopic chutes for dry and conditioned ash unloading complete with drives, accessories (e) Water booster pumps & wash water pumps alongwith drives, piping, valves, supporting structure, etc. (f) Vertical sump drainage pumps alongwith drives, piping, valves, supporting structures, etc. (g) Pendant controlled electrically operated overhead travelling crane complete with runway rails, clamps, end stops etc. for and silo utility building (h) Supply of foundation bolts & inserts, etc. (i) Classification & Bagging Plants unit (j) Any other items not covered above but required to complete the dry ash transportation and storage system xii) Equipment for HCSD Silos (a) Vent filter & accessories for main storage silos (b) Dry ash unloaders with VFD (c) Ash conditioners alongwith associated water piping and valves (d) Vertical sump drainage pumps alongwith drives, piping, valves, supporting structures, etc. (e) Supply of foundation bolts & inserts, etc. (f) Any other items not covered above but required to complete the dry ash transportation and storage system |
| 17 | i) i) Bottom Ash water pumps complete with drive motors and other accessories as specified ii) Fly Ash water pumps complete with drive motors and accessories as specified iii) HP Seal water pumps alongwith drive motors and accessories as specified iv) LP Seal water pumps alongwith drive motors and accessories as specified v) Flushing water pump alongwith drive motor and accessories vi) All ash water piping, seal water piping, flushing water piping, service water piping complete with fittings, valves, flanges, hangers, associated supporting structure etc. as specified vii) Pendant controlled electrically operated overhead travelling crane complete with runway rails, clamps, end stops etc. for ash water pump house viii) Any other items not included above but required to complete the ash water supply system |
| 18 | (a) (a) Complete high concentration slurry transportation pipe lines upto ash dyke including garlanding associated supporting structure as specified (b) Pneumatically operated valves and accessories (c) Mixing/agitator tanks alongwith drives and accessories (d) Positive displacement type HCSD pumps alongwith variable frequency drive and HCSD pipe line (e) Slurry line valves (i.e. valves at HCSD pump suction & discharge (f) Pendent controlled electrically operated overhead travelling crane complete with runway rails clumps, end stops etc. for HCSD pump house (g) Supply of foundation bolts & inserts etc. (h) Wash water pumps, charge pumps alongwith drives, piping, valves, supporting structure etc. (i) Any other items not included above but required to complete the HCSD system |
| 19 | A) Complete Mechanical System as per Technical Specification and Bidding documents for : (i) Ash Water Recirculation Pumps & Drives, Booster pump(if required at branch point) Ash Water Re-circulation piping, valves and fittings, crane, Inter connecting piping, along with all accessories etc as per Technical specifications B) Any other item not included above but required to meet the offered system complete in all respect. |
| 20 | SUB-TOTAL (I) Installation Services 0.0 II) Civil Works ( As per Technical specifications, Sec-VI of bidding document) Lot 1.0 0.0 III) Amount linked to Safety Aspects/ compliance to Safety Rules Lot 1.0 0.0 TOTAL (I) + (II)+ (III ) (The total amount of this Schedule is to be filled up in BOQ1) 0.0 NOTE |
| 21 | Name of Work: ASH HANDLING SYSTEM PACKAGE FOR TELANGANA STPP-II (3 X 800 MW) Bidding Document No.: CS-9592-162-9 Bidder's Name and Address : Schedule No. 6 : Recommended Spare Parts Item Description Qty Unit Price Total Price Local transportation charges (including inland insurance) (INR) Total price (as delivered at Project) Ex-Works (India) (INR) Ex-Works (India) (INR) FOR Site (INR) |
| 22 | 2.0 TOTAL PRICE We also confirm that the items of Recommended spares with same specification having same identification number but with different item code have been quoted by us at the same price. Further all such items of spares have been clubbed together and enlosed separately at Annexure-............... to our offer Note: |
| 23 | Spares shall be quoted on Ex-works (India) basis. |
| 24 | Continuation sheets of like size and format may be used as per Bidder's requirements and annexed to this Schedule. Name of Work: ASH HANDLING SYSTEM PACKAGE FOR TELANGANA STPP-II (3 X 800 MW) Bidding Document No.: CS-9592-162-9 Bidder's Name and Address : Schedule No. 7: Goods and Services Tax (GST) The details of Goods and Services Tax (as on seven (07) days prior to the last date for submission of price bids) applicable on the price of goods and services quoted in Schedule-2, 3 & 4, not included in the Bid Price and which may be payable by the Employer in accordance with the provisions of Bidding Documents are as under : S.No. Bid Price Component Rate of GST (%) Amount on which GST applicable (in INR) Total GST payable (in INR) |
| 25 | Ex-Works-Main Equipment (Schedule-2) |
| 26 | Type Test Charges on Ex-Works-Main Equipment (Schedule-2) |
| 27 | Ex-Works-Mandatory Spares (Schedule-2) |
| 28 | F&I-Main Equipment (Schedule-3) |
| 29 | F&I-Mandatory Spares (Schedule-3) |
| 30 | Installation Services (Schedule-4) |
| 31 | Civil Works (Schedule-4) |
| 32 | Amount linked to Safety Aspects/ compliance to Safety Rules (Schedule-4) TOTAL (GST) (The total amount of this Schedule is to be filled up in BoQ1) 0.0 NOTE |
| 33 | In case rate of GST is different for various items, such different rates of GST along with the amount on which such GST is applicable shall be suitably indicated by the bidders in this schedule. |
| 34 | Bidder may also insert additional rows to indicate different rates of GST, if applicable, Name of Work: ASH HANDLING SYSTEM PACKAGE FOR TELANGANA STPP-II (3 X 800 MW) Bidding Document No.: CS-9592-162-9 Bidder's Name and Address : Schedule No. 8B : Break up of Type Test Charges priced in Schedule-2. We Confirm that the charges for all the type tests stipulated in the bidding documents are included in our bid price. Further, the break-up of various type test charges are given below which, at your option, can be used for adjustment in contract price in case any of the type tests is not to be carried out. Sl. No. Description of equipment Description of Type Test *Charges for one Type /Rating Number of Type/Rating Total Type Test Charges* |
| 35 | H.T. Motors (For each type and rating) b) Measurement of noise atno load 0.0 c) Momentary over load test 0.0 d)Full load test 0.0 e)Temperature rise test 0.0 |
| 36 | MV VFD b) Temperature rise test 0.0 c) Noise level 0.0 d) Harmonics of No load current.(Input/Output) 0.0 |
| 37 | MV BUS DUCT (For each type and rating) b) Short circuit withstand test 0.0 c) Impulse withstand test followed by HV test 0.0 d) One minute high voltage Power frequency withstand test 0.0 Grand Total Break-Up of Type Test Charges to Schedule-2 0.0 Note : |
| 38 | The currency of charges for Type Tests shall be INR in which the corresponding equipment is being offered in Schedule-2. |
| 39 | In case of additional type/rating for any particular item are found during engineering, the type tests for the same shall be carried out without any additional cost to the Employer. Further, in case of waiver of any type tests on such additional type/rating. the unit rate for same as stated in this schedule for that particular item shall be applicable for working out the rebate. Please Enable Macros to View BoQ information |