| 1 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259) |
| 2 | Lift 0 to 1.5 M |
| 3 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in- charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-4/259) |
| 4 | Lift 0 to 1.5 M |
| 5 | Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259) |
| 6 | Lift 0 to 1.5 M |
| 7 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. |
| 8 | Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint /quick release coupler joint /compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete. Note: - H.D.P.E. Pipes shall be as per latest IS Specifications Also HDPE pipes upto 110 mm Dia shall be in coil form PE-100, 8 Kg/Sq. cm : |
| 9 | 4) 110 mm |
| 10 | 11) 250 mm |
| 11 | Lowering, Laying and Jointing H. D.P. E./M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II For all classes. |
| 12 | 9) 110 mm |
| 13 | 16) 250 mm |
| 14 | Providing and laying in situ Cement Concrete M-15 of trap/granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum) Spec. No.- Bd E /1 Page No. 287 and B-7, Page No. 38 |
| 15 | 2) In PCC M-150 |
| 16 | Providing & Supply of Electro Fusion Fittings in accordance with BS EN12201: Part-3 suitable for drinking water with in black/ blue colour manufactured from compounded PE80/ PE100 virgin polymer and compatible with PE80/PE100 pipes, in pressure rating SDR11 with min PN12.5 rated for water application and shall be inclusive of all cost such as testing, inspection charges, transportation up to store, transit insurance, loading, unloading, stacking excluding GST levied by GOI & GOM in all respect, etc. complete. |
| 17 | Couplers 110 |
| 18 | 16) End Cap 250 |
| 19 | 51) Reducing Tee 250 x 250 x 110 |
| 20 | 53) Reducing Tee 250 x 250 x 160 |
| 21 | Spigot L ong Neck Pipe End (Stub End) for Electro Fusion joint 11) LNPE 250 Please Enable Macros to View BoQ information |