| 1 | (Part-A) Supply & Erection Providing & Fixing of Suspension Clamp with I Hook | (Part-A) Supply & Erection Providing & Fixing of Suspension Clamp with I Hook |
| 2 | Providing & Fixing of I Hook | Providing & Fixing of I Hook |
| 3 | Providing & Fixing of Dropper Channel | Providing & Fixing of Dropper Channel |
| 4 | Providing & Fixing of Dead End Clamp with I Hook | Providing & Fixing of Dead End Clamp with I Hook |
| 5 | Providing & Fixing of Clamp for LT Distribution Box | Providing & Fixing of Clamp for LT Distribution Box |
| 6 | Providing & Fixing of Piercing Connector | Providing & Fixing of Piercing Connector |
| 7 | Providing & Fixing of Stone Pad | Providing & Fixing of Stone Pad |
| 8 | Providing & Fixing of Bolt & Nut All Size | Providing & Fixing of Bolt & Nut All Size |
| 9 | Providing & Fixing of Earth Wire Clamp | Providing & Fixing of Earth Wire Clamp |
| 10 | Providing & Fixing of PG Clamp | Providing & Fixing of PG Clamp |
| 11 | Providing & Fixing of LT Clamp | Providing & Fixing of LT Clamp |
| 12 | Providing & Fixing of 33 KV T-off Channel | Providing & Fixing of 33 KV T-off Channel |
| 13 | Providing & Fixing of 33 KV Holding Clamp | Providing & Fixing of 33 KV Holding Clamp |
| 14 | Providing & Fixing of 33 KV Bracing set | Providing & Fixing of 33 KV Bracing set |
| 15 | Providing & Fixing of V Type Cross Arm Clamp for 11 KV | Providing & Fixing of V Type Cross Arm Clamp for 11 KV |
| 16 | Providing & Fixing of V Type Cross Arm Clamp for 33 KV | Providing & Fixing of V Type Cross Arm Clamp for 33 KV |
| 17 | Providing & Fixing of 11 KV F Bracket | Providing & Fixing of 11 KV F Bracket |
| 18 | Providing & Fixing of 11 KV E Bracket | Providing & Fixing of 11 KV E Bracket |
| 19 | Providing & Fixing of 33 KV PG Clamp for dog conductor | Providing & Fixing of 33 KV PG Clamp for dog conductor |
| 20 | Providing & Fixing of Alu. winding wire | Providing & Fixing of Alu. winding wire |
| 21 | Providing & Fixing of Top Channel | Providing & Fixing of Top Channel |
| 22 | Providing & Fixing of T-Off Channel | Providing & Fixing of T-Off Channel |
| 23 | Providing & Fixing of MS Angle | Providing & Fixing of MS Angle |
| 24 | Providing & Fixing of Clamp for Top Channel | Providing & Fixing of Clamp for Top Channel |
| 25 | Providing & Fixing of Alu. Jointing Sleaves | Providing & Fixing of Alu. Jointing Sleaves |
| 26 | Providing & Fixing of Danger Board | Providing & Fixing of Danger Board |
| 27 | Providing & Fixing of Number Plate | Providing & Fixing of Number Plate |
| 28 | Providing & Fixing of Alu. Paint | Providing & Fixing of Alu. Paint |
| 29 | Providing & Fixing of Red Oxide Paint | Providing & Fixing of Red Oxide Paint |
| 30 | Providing & Fixing of GI Barbed Wire | Providing & Fixing of GI Barbed Wire |
| 31 | Providing & Fixing of Clamp for T-off Channel | Providing & Fixing of Clamp for T-off Channel |
| 32 | Providing & Erecting, Fabrication of terminal Gantry structure made out of MS angle/channel/beam sections including galvanizing/painting, nut bolts clamps foundation bolts and all accessories complete for incoming/outgoing line termination including construction RCC foundation for terminal Gantry including excavation PCC, RCC work reinforcement, template setting, grouting and backfilling complete as per RESPO norms. | Providing & Erecting, Fabrication of terminal Gantry structure made out of MS angle/channel/beam sections including galvanizing/painting, nut bolts clamps foundation bolts and all accessories complete for incoming/outgoing line termination including construction RCC foundation for terminal Gantry including excavation PCC, RCC work reinforcement, template setting, grouting and backfilling complete as per RESPO norms. |
| 33 | Providing & Fixing of Structure for 33 KV CT | Providing & Fixing of Structure for 33 KV CT |
| 34 | Providing & Fixing of Structure for 33 KV LA | Providing & Fixing of Structure for 33 KV LA |
| 35 | Providing & Fixing of Structure for Line Isolater | Providing & Fixing of Structure for Line Isolater |
| 36 | Providing & Fixing of Structure for Post Isolater | Providing & Fixing of Structure for Post Isolater |
| 37 | Providing & Fixing of Clamp for 33 KV V Type Cross ARM | Providing & Fixing of Clamp for 33 KV V Type Cross ARM |
| 38 | Providing & Fixing of 33 KV F Bracket | Providing & Fixing of 33 KV F Bracket |
| 39 | Providing & Fixing of DP Clamp for STP Pole | Providing & Fixing of DP Clamp for STP Pole |
| 40 | Providing & Fixing of GI Pipe 6 Dia | Providing & Fixing of GI Pipe 6 Dia |
| 41 | Providing & Fixing of Hdpe Pipe for laying 33 kv XLPE cable | Providing & Fixing of Hdpe Pipe for laying 33 kv XLPE cable |
| 42 | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 43 | Carriage of PCC Pole 11 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) | Carriage of PCC Pole 11 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) |
| 44 | Carriage of ST Pole 11/13 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) | Carriage of ST Pole 11/13 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) |
| 45 | Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. LT Distribution Box (28), Stay Set (30), Earthing of Pole (230), Jointing Kit O/D 3x300 sqmm (4), 11 KV V Type Cross Arm (220), 33 KV V Type Cross Arm (02), Polymer Pin Insulator for 11 KV (687), 11 KV Pin with nut (687), Insulated Dog Conductor (500), Raccon Conductor (950), Weasel Conductor (10320), Disc Insulator with fitting for 11 KV (108), Disc Insulator with fitting for 33 KV (6), 33 KV VCB 800A, 750 MVA (3), 33 KV Control Panel for single T/F (1), 33 KV CT 200/1A, (6), 33 KV Bus Isolator (1), 33 KV Top Channel (4), 33 KV LA (3), Line Isolator (1), Post Isolator (1), Neutral Cum Earth GI wire 6SWG (24 Kg.), 33 KV V type steel cross arm (18), 33 KV Pin Insulator (78), 33 KV Pin with Nut & Bolt (78), LT ABC 3x95 sqmm (1380) and other line Material as required in Estimate/Package) | Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. LT Distribution Box (28), Stay Set (30), Earthing of Pole (230), Jointing Kit O/D 3x300 sqmm (4), 11 KV V Type Cross Arm (220), 33 KV V Type Cross Arm (02), Polymer Pin Insulator for 11 KV (687), 11 KV Pin with nut (687), Insulated Dog Conductor (500), Raccon Conductor (950), Weasel Conductor (10320), Disc Insulator with fitting for 11 KV (108), Disc Insulator with fitting for 33 KV (6), 33 KV VCB 800A, 750 MVA (3), 33 KV Control Panel for single T/F (1), 33 KV CT 200/1A, (6), 33 KV Bus Isolator (1), 33 KV Top Channel (4), 33 KV LA (3), Line Isolator (1), Post Isolator (1), Neutral Cum Earth GI wire 6SWG (24 Kg.), 33 KV V type steel cross arm (18), 33 KV Pin Insulator (78), 33 KV Pin with Nut & Bolt (78), LT ABC 3x95 sqmm (1380) and other line Material as required in Estimate/Package) |
| 46 | Cartiage of 33 KV XLPE Cable 3x300 sqmm Mtr.) from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | Cartiage of 33 KV XLPE Cable 3x300 sqmm Mtr.) from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) |
| 47 | Erection and grouting of PCC 8.5 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of PCC 8.5 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 48 | Erection and grouting of PCC Pole 11 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of PCC Pole 11 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 49 | Erection and grouting of ST Pole 11/13 Mtr. long (Single Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 11/13 Mtr. long (Single Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 50 | Erection and grouting of ST Pole 11/13 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 11/13 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 51 | Laying & Commissioning of 33 KV XLPE cable 3x300 sqmm underground in HDPE Pipe including excavation of trench, sand, vedding, protective bricks, backfilling dressing and all complete work as per RESPO Norms and direction by superivising Engineer. | Laying & Commissioning of 33 KV XLPE cable 3x300 sqmm underground in HDPE Pipe including excavation of trench, sand, vedding, protective bricks, backfilling dressing and all complete work as per RESPO Norms and direction by superivising Engineer. |
| 52 | Laying & Commissioning of 33 KV XLPE cable 3x300 sqmm overhead with making loop/mounting with required GI pipe as per RESPO Norms and direction by superivising Engineer. | Laying & Commissioning of 33 KV XLPE cable 3x300 sqmm overhead with making loop/mounting with required GI pipe as per RESPO Norms and direction by superivising Engineer. |
| 53 | Installation of earthing Pole as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Installation of earthing Pole as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 54 | Laying sagging stringing and binding and jumpering of ACSR weasel conductor/Insulator dog conductor/Raccon Conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. | Laying sagging stringing and binding and jumpering of ACSR weasel conductor/Insulator dog conductor/Raccon Conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. |
| 55 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. LT ABC 3X95 SQMM | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. LT ABC 3X95 SQMM |
| 56 | Construction of plinth for VCB pannel including excavation PCC, RCC reinforcement, shuttering, foundation bolts and backfilling complete. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer. | Construction of plinth for VCB pannel including excavation PCC, RCC reinforcement, shuttering, foundation bolts and backfilling complete. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer. |
| 57 | Fixing of DISTRIBUTION BOX on Errected pole for giving supply to consumer by connecting consumer cables. | Fixing of DISTRIBUTION BOX on Errected pole for giving supply to consumer by connecting consumer cables. |
| 58 | Gaurding of 11 KV Line as per RESPO norms. | Gaurding of 11 KV Line as per RESPO norms. |
| 59 | Installation of Stay Set as direction by supervising Engineer. | Installation of Stay Set as direction by supervising Engineer. |
| 60 | Filling of Jointing Kit 3x300 sqmm O/D and making connection as per respo norms & direction by supervising engineer. | Filling of Jointing Kit 3x300 sqmm O/D and making connection as per respo norms & direction by supervising engineer. |
| 61 | Installation of 33 KV Control Panel for single T/F as direction by supervising Engineer. | Installation of 33 KV Control Panel for single T/F as direction by supervising Engineer. |
| 62 | Fixing of Polymer Pin Insulator for 11 KV as direction by supervising Engineer. | Fixing of Polymer Pin Insulator for 11 KV as direction by supervising Engineer. |
| 63 | Concreting of Stay as direction by supervising Engineer. All required mateial provide by the contractor at his own cost. | Concreting of Stay as direction by supervising Engineer. All required mateial provide by the contractor at his own cost. |
| 64 | Fixing of 11 kv Disc Insulator with fitting as direction by supervising Engineer. | Fixing of 11 kv Disc Insulator with fitting as direction by supervising Engineer. |
| 65 | Fixing of 33 kv Disc Insulator with fitting as direction by supervising Engineer. | Fixing of 33 kv Disc Insulator with fitting as direction by supervising Engineer. |
| 66 | Installation & Commissioning of 33 KV CT 200/1A complete work as direction by supervising Engineer. | Installation & Commissioning of 33 KV CT 200/1A complete work as direction by supervising Engineer. |
| 67 | INSTALLATION OF 33 KV BUS ISOLATOR :-Assembling and installation of bus isolator on the isolator structure Adjusting of operating machanism in proper alignment so as to ensure smooth operation of the same in case of line isolator proper operating of earth links shall be ensured. The work includes fabrication for proper fixing if required. | INSTALLATION OF 33 KV BUS ISOLATOR :-Assembling and installation of bus isolator on the isolator structure Adjusting of operating machanism in proper alignment so as to ensure smooth operation of the same in case of line isolator proper operating of earth links shall be ensured. The work includes fabrication for proper fixing if required. |
| 68 | Fixing of 33 KV Top Channel as direction by supervising Engineer. | Fixing of 33 KV Top Channel as direction by supervising Engineer. |
| 69 | Fixing of 11 KV V Type Cross Arm as direction by supervising Engineer. | Fixing of 11 KV V Type Cross Arm as direction by supervising Engineer. |
| 70 | Fixing of 33 KV V Type Cross Arm as direction by supervising Engineer. | Fixing of 33 KV V Type Cross Arm as direction by supervising Engineer. |
| 71 | INSTALLATION OF 33 KV LIGHTENING ARRESTORS :-Assembling and installation / mounting of lightening arrestors on the L.A structure / Terminal Gentry complete with making earth connection (seprate) and line connection . The work includes providing & fabrication of 3 Nos. M.S Plates of size 300×450mm, 10 mm thick for placing lightening arrestors. | INSTALLATION OF 33 KV LIGHTENING ARRESTORS :-Assembling and installation / mounting of lightening arrestors on the L.A structure / Terminal Gentry complete with making earth connection (seprate) and line connection . The work includes providing & fabrication of 3 Nos. M.S Plates of size 300×450mm, 10 mm thick for placing lightening arrestors. |
| 72 | Installation of Line Isolator as direction by supervising Engineer. | Installation of Line Isolator as direction by supervising Engineer. |
| 73 | Installation of Post Insulator on the structure. The work also includes providing & fabrication of 3 Nos.. MS Plate of size 300x450mm. 10mm. Thick for placing post insulator. | Installation of Post Insulator on the structure. The work also includes providing & fabrication of 3 Nos.. MS Plate of size 300x450mm. 10mm. Thick for placing post insulator. |
| 74 | Fixing of Neutral Cum Earth GI wire 6SWG as direction by supervising Engineer. | Fixing of Neutral Cum Earth GI wire 6SWG as direction by supervising Engineer. |
| 75 | Installation of 33 KV Pin Insulator as direction by supervising Engineer. | Installation of 33 KV Pin Insulator as direction by supervising Engineer. |
| 76 | Fixing of 33 KV Pin with Nut & Bolt as direction by supervising Engineer. | Fixing of 33 KV Pin with Nut & Bolt as direction by supervising Engineer. |
| 77 | Fixing of 11 kv Pin with Nut as direction by supervising Engineer. | Fixing of 11 kv Pin with Nut as direction by supervising Engineer. |
| 78 | Removal & binding of weasel conductor and Recived back to ele. Store Center Taj Agra including loading, unloading both ends. | Removal & binding of weasel conductor and Recived back to ele. Store Center Taj Agra including loading, unloading both ends. |