|
| 1 | Supply of Earthing Rod Complete | Earthing Rod Complete |
| 2 | Supply of Top Channel | Top Channel M.S. 100x50x2240 mm |
| 3 | Supply of Droper Channel | Droper Channel M.S. 100x50x2000 mm |
| 4 | Supply of Number Plate | Number Plate with clamp |
| 5 | Supply of Danger board | Danger board with clamp |
| 6 | Supply of Barbed Wire | Barbed Wire G.I. |
| 7 | Supply of Stone Pad | Stone Pad 300x300x75 mm |
| 8 | Supply of Clamp | Clamp with Nut & bolt |
| 9 | Supply of Red oxide Paint | Red oxide Paint |
| 10 | Supply of Aluminium Paint | Aluminium Paint |
| 11 | Supply of T-Channel | T-Channel with clamp nut & Bolt |
| 12 | Supply of F-Bracket | F-Bracket |
| 13 | Supply of Guarding Angle | Guarding Angle |
| 14 | Supply of Guarding Angle clamp | Guarding Angle clamp |
| 15 | Supply of I-Irag Bolt | I-Irag Bolt |
| 16 | Supply of LT Fuse Set Protection Unit | LT Fuse Set Protection Unit for 100 KVA DT with SMC Box |
| 17 | Safe Carriage of New 100 KVA T F | New 100 KVA Transformer |
| 18 | Safe Carriage of 11 KV VCB | 11 KV VCB O/G CTR 200/100/5A, 350 MVA, (1250 Amp) |
| 19 | Safe Carriage of Fuse Set | Fuse Set |
| 20 | Safe Carriage of TPMO | 11 KV TPMO |
| 21 | Safe Carriage of XLPE Cable | 3x70 Sqmm 11 KV XLPE Cable |
| 22 | Safe Carriage of I D Cable Jointing Kit | I/D Cable Jointing Kit suitable for 3x70 mm2 XLPE Cable |
| 23 | Safe Carriage of O D Cable Jointing Kit | O/D Cable Jointing Kit suitable for 3x70 mm2 XLPE Cable |
| 24 | Safe Carriage of GI Pipe | GI Pipe 6 inch dia |
| 25 | Safe Carriage of Stay set complete | 11 KV Stay set complete |
| 26 | Safe Carriage of Extra Stay at Angle | Extra Stay at Angle Location |
| 27 | Safe Carriage of ACSR Dog Conductor | ACSR Dog Conductor |
| 28 | Safe Carriage of ACSR Weasel Conductor | ACSR Weasel Conductor |
| 29 | Safe Carriage of Polymeric Pin Insulator | 11 KV Polymeric Pin Insulator |
| 30 | Safe Carriage of Pin with nut | 11 Kv Pin with nut |
| 31 | Safe Carriage of Polymeric Disc Insulator | 11 Kv Polymeric Disc Insulator |
| 32 | Safe Carriage of Disc fitting | 11 Kv Disc fitting |
| 33 | Safe Carriage of ST Pole | ST Pole 11 Metre. |
| 34 | Safe Carriage of G.I. Wire 8 SWG | Guarding G.I. Wire 8 SWG |
| 35 | Safe Carriage of G.I. Wire 6 SWG | Guarding G.I. Wire 6 SWG |
| 36 | Safe Carriage of 3 Ph-4 W Static Smart Meter | 3 Ph-4 W Static Smart Meter AMI Compatible) 11 KV |
| 37 | Safe Carriage of Pilfer proof metering Cubicle | 11 KV Pilfer proof metering Cubicle |
| 38 | Erection of 100 KVA TF | Installation of new 100 kVA, 110.4 kV transformer complete in all respects |
| 39 | Erection of Pipe Earthing | Installation of pipe earthing body and neutral up to 60 feet depth or minimum water level, as per RESPO norms |
| 40 | Erection of Plinth | Construction and installation of plinth for 100 kVA transformer, complete in all respects |
| 41 | Erection of Fencing | Construction and installation of 6 feet high fencing for 100 kVA transformer including civil works for 4x4 m area complete in all respects |
| 42 | Erection of STP Pole | Erection of double support with complete HT/LT fittings on 11 mtr ST poles, including earthing, grouting, and muffing of poles as per RESPO norms |
| 43 | Erection of Paint of Pole | Painting of ST Pole with red oxide & ailunimum paint as per RESPO norms |
| 44 | Erection of Danger Board | Fixing Of Danger Board with clamp for 11 KV |
| 45 | Erection of M.S. Angle Iron | Fixing of T-Channel with clamp nut & Bolt |
| 46 | Erection of ACSR Weasel Conductor | Laying sagging stringing, binding and jumpering ACSR Weasel conductor |
| 47 | Erection of ACSR Dog Conductor | Laying sagging stringing, binding and jumpering ACSR Dog conductor |
| 48 | Erection of Barbed Wire | Fixing of Barbed Wire |
| 49 | Erection of LT Fuse Set Protection Unit | Fixing of LT Fuse Set Protection Unit for 100 KVA DT with SMC Box in all respect |
| 50 | Erection of Top Channel | Fixing of Top Channel M.S. 100x50x2240 mm |
| 51 | Erection of Dropper Channel | Fixing of Droper Channel M.S. 100x50x2000 mm |
| 52 | Erection of Number Plate | Fixing of Number Plate |
| 53 | Erection of Stay set complete | Stay set complete With Concreating |
| 54 | Erection of Extra Stay set complete | Extra Stay set complete With Concreating |
| 55 | Erection of G.I. Wire 8 SWG | Laying & fixing of G.I. wire 8 SWG |
| 56 | Erection of G.I. Wire 6 SWG | Laying & fixing of G.I. wire 6 SWG |
| 57 | Erection of Fuse Set | Fuse Set |
| 58 | Erection of TPMO | Fixing of 11 KV TPMO |
| 59 | Erection of XLPE Cable | Laying & Fixing of 3x70 Sqmm 11 KV XLPE Cable |
| 60 | Erection of I D Cable Jointing Kit | Erection & Installation of I/D Cable Jointing Kit suitable for 3x70 mm2 XLPE Cable |
| 61 | Erection of O D Cable Jointing Kit | Erection & Installation of O/D Cable Jointing Kit suitable for 3x70 mm2 XLPE Cable |
| 62 | Safe Carriage of GI Pipe | Laying & Fixing of GI Pipe 6 inch dia |
| 63 | Erection of 3 Ph 4 W Static Smart Meter | Erection & Installation of 3 Ph-4 W Static Smart Meter AMI Compatible) 11 KV |
| 64 | Erection of Pilfer proof metering Cubicle | Erection & Installation of 11 KV Pilfer proof metering Cubicle |
| 65 | Erection of 11 KV VCB | Erection & Installation of 11 KV VCB O/G CTR 200/100/5A, 350 MVA, (1250 Amp) |
| 66 | Recieved back charges for Carraige of dismantling material from site to store. | Electronic TVM 11 KV |
| 67 | Recieved back charges for Carraige of dismantling material from site to store. | 11 KV CT/PT Pole Mounted unit 10/5 Amp |
| 68 | Recieved back charges for Carraige of dismantling material from site to store. | GI Pipe 6 inch Dia |
| 69 | Recieved back charges for Carraige of dismantling material from site to store. | MS Angle (75x75x6x2028 mm) T/F Base |
| 70 | Recieved back charges for Carraige of dismantling material from site to store. | Modem |