|
| 1 | For Services Steel Renewal-AW (with degutting & regutting)- 12 mm and below with DPT. Renewal of above-waterline (AW) structural plates (with stiffeners) of thickness up to 12 mm including degutting of lagging. Paneling (approx 1-2 Clear on all edges on both sides of the structure) and regutting of metallic paneling Material DMR249A/D40S/MS/B-Quality Steel Standards NSE-155 | For Services Steel Renewal-AW (with degutting & regutting)- 12 mm and below with DPT. Renewal of above-waterline (AW) structural plates (with stiffeners) of thickness up to 12 mm including degutting of lagging. Paneling (approx 1-2 Clear on all edges on both sides of the structure) and regutting of metallic paneling Material DMR249A/D40S/MS/B-Quality Steel Standards NSE-155 |
| 2 | Repair of hand rail | Repair of hand rail |
| 3 | Fitment of light stand along with material OD 90 X 2000MM (Material:MS) | Fitment of light stand along with material OD 90 X 2000MM (Material:MS) |
| 4 | Repair and refurbishment of reflector along with stand. | Repair and refurbishment of reflector along with stand. |
| 5 | Repair / refurbishment of mushroom head (OD 420MM) | Repair / refurbishment of mushroom head (OD 420MM) |
| 6 | Manufacturing of two in no manhole door along with pad, drilling and tapping welding on board fitment of M16X 50 MM Qty 16 each studs along with nut, fitment of 5 MM thickness neoprene gasket and welding of two in no handle for door. | Manufacturing of two in no manhole door along with pad, drilling and tapping welding on board fitment of M16X 50 MM Qty 16 each studs along with nut, fitment of 5 MM thickness neoprene gasket and welding of two in no handle for door. |
| 7 | Fitment of new match and welding | Fitment of new match and welding |
| 8 | Removal of DA room soft batch, straightening align and fitment, welding cleaning of 48 nos each tapped holes fitment of soft patch door along with 5 MM thickness neoprene gasket and tighten as required. | Removal of DA room soft batch, straightening align and fitment, welding cleaning of 48 nos each tapped holes fitment of soft patch door along with 5 MM thickness neoprene gasket and tighten as required. |
| 9 | Supply and fitment of 20MM stud SS304 for missing DA room soft patches | Supply and fitment of 20MM stud SS304 for missing DA room soft patches |
| 10 | Fabrication and fitment of fuel tank foundation | Fabrication and fitment of fuel tank foundation |
| 11 | Fuel sounding pipe adapter fitment and welding (1’’ – Qty 05 & 2’’ Flange- Qty 02) | Fuel sounding pipe adapter fitment and welding (1’’ – Qty 05 & 2’’ Flange- Qty 02) |
| 12 | Repair of side light | Repair of side light |
| 13 | Fabricate fit and welding of bracket 24 Nos and pad 18 Nos | Fabricate fit and welding of bracket 24 Nos and pad 18 Nos |
| 14 | fabricate and fitment of ‘D’ shaped pipe fender | fabricate and fitment of ‘D’ shaped pipe fender |
| 15 | Supply of 8018 welding rod 3.15MM and 4MM for welding. | Supply of 8018 welding rod 3.15MM and 4MM for welding. |
| 16 | Hot work assistance provided for various job | Hot work assistance provided for various job |
| 17 | Repair and refurbishment of air vent pipe 2’ dia | Repair and refurbishment of air vent pipe 2’ dia |
| 18 | Erection of stagging as required for ship side port and stbd and bottom keep plate renewal where required during the period of dry docking. | Erection of stagging as required for ship side port and stbd and bottom keep plate renewal where required during the period of dry docking. |
| 19 | U/W hull and B/T area to be blasted to SA 2.5 and paint scheme as follow:- 1 FC interguard 269: DFT 150 micron, FC Intershield 300: DFT 2*150 micron, 1 FC Interguard 263: DFT 1*125 micron, 3 FC Antifouling Intersmooth 360 SPC: DFT 3*150m. B/t paint scheme:- 1 FC Interguard 269: DFT 1 * 50 m, 2 FC Intershield 300: dft 2* 150m, 1 FC Interguard 263: DFT 3*150m, last coat black | U/W hull and B/T area to be blasted to SA 2.5 and paint scheme as follow:- 1 FC interguard 269: DFT 150 micron, FC Intershield 300: DFT 2*150 micron, 1 FC Interguard 263: DFT 1*125 micron, 3 FC Antifouling Intersmooth 360 SPC: DFT 3*150m. B/t paint scheme:- 1 FC Interguard 269: DFT 1 * 50 m, 2 FC Intershield 300: dft 2* 150m, 1 FC Interguard 263: DFT 3*150m, last coat black |
| 20 | U/W Hull Painting Paint Scheme as follow:- 1 FC Interguard 263: DFT 1 * 125 M, 3 FC Antifouling Intersmooth 360SPC: DFT 3*150M , Last Coat black | U/W Hull Painting Paint Scheme as follow:- 1 FC Interguard 263: DFT 1 * 125 M, 3 FC Antifouling Intersmooth 360SPC: DFT 3*150M , Last Coat black |
| 21 | Ship side surface including stem and transform to be blasetd to SA2.5 & painted . Paint scheme as follow:- 2 full coat interthane 990: DFT 2*60M. | Ship side surface including stem and transform to be blasetd to SA2.5 & painted . Paint scheme as follow:- 2 full coat interthane 990: DFT 2*60M. |
| 22 | Ship side to be painted. Paint scheme as follow:- 2 full coat interthane 990:: DFT 2*60 M | Ship side to be painted. Paint scheme as follow:- 2 full coat interthane 990:: DFT 2*60 M |
| 23 | Electrical conduit pipes to be renewed. | Electrical conduit pipes to be renewed. |
| 24 | Overhauling of 02 in Nos Transformers (I) 35 KVA (Make-Marine Electricals (I) Pvt Ltd, Si no 21081/1/21700) (ii) 40 KVA (Make – Marine Electricals (I) Pvt. Ltd, SI no- 21081/4/51643) to be carried out and insulation to be improved. | Overhauling of 02 in Nos Transformers (I) 35 KVA (Make-Marine Electricals (I) Pvt Ltd, Si no 21081/1/21700) (ii) 40 KVA (Make – Marine Electricals (I) Pvt. Ltd, SI no- 21081/4/51643) to be carried out and insulation to be improved. |
| 25 | Undertake checks of electrical horn (make – MJR corporations, TYPE-SEWN50K-WS) and prove its operations. | Undertake checks of electrical horn (make – MJR corporations, TYPE-SEWN50K-WS) and prove its operations. |
| 26 | Renew DD pump inlet and outlet pipes. (DIA-80MN, MAT – CUNI) Service cost | Renew DD pump inlet and outlet pipes. (DIA-80MN, MAT – CUNI) Service cost |
| 27 | Renew DD pump inlet and outlet pipes. (DIA-80MM, MAT0 – CUNI) Material cost | Renew DD pump inlet and outlet pipes. (DIA-80MM, MAT0 – CUNI) Material cost |
| 28 | Solid buoyant foam in 04 in Nos void tanks to be removed for hotwork clearance and stored safely and refill back post – work as required Service Cost | Solid buoyant foam in 04 in Nos void tanks to be removed for hotwork clearance and stored safely and refill back post – work as required Service Cost |
| 29 | Renew fuel lines from RU tank to DA inlet and return line from DA to RU tank for both DA’s (MAT-MS DIA – 15 MM) | Renew fuel lines from RU tank to DA inlet and return line from DA to RU tank for both DA’s (MAT-MS DIA – 15 MM) |
| 30 | Renew fuel line from RU tank to DA inlet and return line from DA to RU tank for both DA’S (Mat- Ms dia 15 mm) Material cost | Renew fuel line from RU tank to DA inlet and return line from DA to RU tank for both DA’S (Mat- Ms dia 15 mm) Material cost |
| 31 | Renew fuel RU tank filing pipe along with cap from main deck to RU tank. (Dia – 50MM, MAT – MS, Service Cost) | Renew fuel RU tank filing pipe along with cap from main deck to RU tank. (Dia – 50MM, MAT – MS, Service Cost) |
| 32 | Renew fuel RU tank filing pipe along with cap from main deck to RU tank. (Dia – 50MM, MAT – MS, Material Cost) | Renew fuel RU tank filing pipe along with cap from main deck to RU tank. (Dia – 50MM, MAT – MS, Material Cost) |
| 33 | Undertake functional checks of local control panel (LCP) of both DG and replace/rectify defective instrumentation Wiring indication, switches, alarms etc. Service Cost | Undertake functional checks of local control panel (LCP) of both DG and replace/rectify defective instrumentation Wiring indication, switches, alarms etc. Service Cost |
| 34 | Renew tube light fitting in DG Compt – 04 nos flood lights – 02 nos. Service Cost | Renew tube light fitting in DG Compt – 04 nos flood lights – 02 nos. Service Cost |
| 35 | Renew tube light fitting in DG Compt – 04 nos flood lights – 02 nos. Material Cost | Renew tube light fitting in DG Compt – 04 nos flood lights – 02 nos. Material Cost |
| 36 | Navigational light fitting to renewed along with Nav light holder (02 stair type) Service cost | Navigational light fitting to renewed along with Nav light holder (02 stair type) Service cost |
| 37 | Navigational light fitting to renewed along with Nav light holder (02 stair type) Material cost | Navigational light fitting to renewed along with Nav light holder (02 stair type) Material cost |
| 38 | Serviceability checks of both Port and Stdb Capstan control panels and undertake insulation checks of cabling (100 Mtrs ) service cost | Serviceability checks of both Port and Stdb Capstan control panels and undertake insulation checks of cabling (100 Mtrs ) service cost |
| 39 | Serviceability checks of both Port and Stdb Capstan control panels and undertake insulation checks of cabling (100 Mtrs ) Material cost | Serviceability checks of both Port and Stdb Capstan control panels and undertake insulation checks of cabling (100 Mtrs ) Material cost |
| 40 | Serviceability checks of anchor drives service cost | Serviceability checks of anchor drives service cost |
| 41 | Serviceability checks of anchor drives material cost | Serviceability checks of anchor drives material cost |
| 42 | Renew cable for flood lamps (DIA 02 X 1.5 MM3-100 MTRS), for fitment of tube lights ( DIA 02 X 1.5 SQMM – 80 MTRS) service cost | Renew cable for flood lamps (DIA 02 X 1.5 MM3-100 MTRS), for fitment of tube lights ( DIA 02 X 1.5 SQMM – 80 MTRS) service cost |
| 43 | Renew cable for flood lamps (DIA 02 X 1.5 MM3-100 MTRS), for fitment of tube lights ( DIA 02 X 1.5 SQMM – 80 MTRS) Material cost | Renew cable for flood lamps (DIA 02 X 1.5 MM3-100 MTRS), for fitment of tube lights ( DIA 02 X 1.5 SQMM – 80 MTRS) Material cost |
| 44 | Serviceability checks of inverter service cost | Serviceability checks of inverter service cost |