| 1 | Repairs to pumps centrifugal pumps/Monoblock pump set includes rewinding ,replacement of bearings ,shaft rebuilding and polishing , making key way ,balancing of rotor ,varnishing of winding ,balancing of impeller ,overhauling ,replacement of nut ,bolts ,couplings ,starter etc lathe work ,welding and testing (Including with transportation ) A. 5HP |
| 2 | Maintenance of Sprinkler irrigation system involving cleaning of choked sprinkler ,filter backwash ,screen filter ,checking pipeline for leakages and weak spots ,pressure with guage |
| 3 | Repairing of single phase , 0.5 HP monoblock motor starter (Including with transportation ) |
| 4 | Repairing of single phase , 0.5 HP monoblock motor (Including with transportation ) |
| 5 | Repairs to pumps centrifugal pumps/Monoblock pump set includes rewinding ,replacement of bearings ,shaft rebuilding and polishing , making key way ,balancing of rotor ,varnishing of winding ,balancing of impeller ,overhauling ,replacement of nut ,bolts ,couplings ,starter etc lathe work ,welding and testing (Including with transportation ) A. 3 HP |
| 6 | Repairs to pumps centrifugal pumps/Monoblock pump set includes rewinding ,replacement of bearings ,shaft rebuilding and polishing , making key way ,balancing of rotor ,varnishing of winding ,balancing of impeller ,overhauling ,replacement of nut ,bolts ,couplings ,starter etc lathe work ,welding and testing (Including with transportation ) A. 1 HP |
| 7 | Mechanized cleaning of sump tank by using dewatering pumps followed by pressurized hygienic cleaning of sump walls and floor with pressurized jet at 1400 psi using pressure pump followed by brushing of walls and removing of sludge ,dirt ,and debris from the bottom using a wet /dry vaccum complete as per directions of Engineer in charge . |
| 8 | Mechanized cleaning of overhead tanks by using dewatering pumps and pressurized hygienic cleaning of walls and floor followed by brushing of walls and removing of sludge ,dirt ,and debris from the bottom using vaccum complete as per directions of Engineer in charge . |
| 9 | Cleaning of old septic tanks and inspection chambers and disposal of sludge waste using night soil tanker (6 M3 quantity ), making the area clean including lifting the slab and placing back in position complete with all labour ,material ,T&P etc as per directions of Engineer in charge . one night soil tanker shall be considered as one number |
| 10 | Annual professional maintenance of High pressure gas burners including deep cleaning of burners ,inlet nozzle and blockage removal with steam machine ,minor repair of parts such as knob ,pipe ,wire ,valves ,nozzles etc complete as per directions of Engineer in charge |
| 11 | Cleaning of mangalore tile, AC sheet roofing of ADC,s, PI, Comptroller Bungalow by removing leaves ,twigs etc as well as removing of fallen leaves ,twigs and other miscellaneous refuse from laygrounds,water supply inquiry office ,Ganesh temple surroundings ,Staff Quarters ,Guard /Barracks etc as directed by Engineer in charge twice a month Please Enable Macros to View BoQ information |